101402-9422 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1014029422


 

Information injection-pump assembly

ZEXEL 101402-9422 1014029422
101402-9422 INJECTION-PUMP ASSEMBLY
Rating:
68
Buy INJECTION-PUMP ASSEMBLY 101402-9422 zexel genuine, new aftermarket engine parts with delivery

Service parts 101402-9422 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101041-8451
3. GOVERNOR 105419-2152
4. SUPPLY PUMP 105220-7170
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2)
13. NOZZLE-HOLDER
14. NOZZLE
15. NOZZLE SET

Include in #1:

101402-9422 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 101402-9422 1014029422


Zexel num
Bosch num
Firm num
Name
101402-9422 
 
   
INJECTION-PUMP ASSEMBLY
4TNE94 14BC PE4A,5A, PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-1520
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-3-4-2
Pre-stroke mm   3.6 3.55 3.65
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   A
Rack position   8.9
Pump speed r/min   1250 1250 1250
Average injection quantity mm3/st.   48.3 47.3 49.3
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   7+-0.5
Pump speed r/min   400 400 400
Average injection quantity mm3/st.   13 12 14
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Injection quantity adjustment_03
Adjusting point   D
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   65 60 70
Fixing the lever   *
Rack limit   *

Test data Ex:

Governor adjustment

Test data 101402-9422
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT (4)Set idle sub-spring (5)Main spring setting (6)Rack difference between N = N1 and N = N2
----------
K=8 N1=1250r/min N2=800r/min
----------

Speed control lever angle

Test data 101402-9422
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=7deg+-5deg b=26deg+-5deg

Stop lever angle

Test data 101402-9422
N:Pump normal S:Stop the pump. (1)Normal
----------

----------
a=7deg+-5deg b=53deg+-5deg

Timing setting

Test data 101402-9422
(1)Pump vertical direction (2)Position of camshaft's key groove at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(60deg)




Information:

Start By:a. remove shutoff solenoidb. remove governorc. remove governor spring groupd. remove rear cover group 1. Remove riser (1). 2. Remove retaining ring (2), races (3) with bearing (4) and shims (5). 3. Remove four flyweight bolts (6) with washers.4. Remove flyweights (7), toe (8) and pins (9). Keep parts of each flyweight group together.5. Remove pin (9). Inspect for wear.6. Remove flyweight toe (8). Inspect for wear.7. Inspect flyweight pin bore for wear. Replace any flyweight parts with wear.8. Hold flyweight carrier (10) to keep from rotating, and remove eight carrier bolts (11). Replace, do not reuse, eight carrier bolts (11),9. Remove flyweight carrier (10), riser shaft (12) and the drive pin.10. Remove fuel transfer pump (13) and the fittings. See the topic, Remove Fuel Transfer Pump.11. Remove two bolts (14) and remove shutoff assembly (15). 12. If necessary, remove levers (16), (17) and remove spring (18). These components are part of the shutoff assembly service replacement. Do not disassemble shutoff assembly beyond this point. 13. Remove throttle spring (23), setscrew (19), spring (20) and lever (21).14. Remove retaining ring (22) and pull throttle shaft assembly (24) out of the housing bore. Do not disassemble throttle shaft assembly beyond this point.15. If necessary, remove the throttle shaft seal.16. Remove governor front housing from Repair Stand, and turn it over. If not previously removed, remove the housing o-ring seal. 17. Remove drive gear bolt (25) and lift cover (26) from the gear drive unit.
Be careful not to damage the "C" spring, by over compressing with the vise.
18. Use a vise to remove "C" (27). Remove gear assembly (28). Do not disassemble the gear beyond this point
Do not attempt to remove the gear carrier, it is serviced as part of the housing assembly.
The following steps are for the assembly of the front housing.19. Position gear (28) onto carrier (29). Assemble with short length, 8.43 mm (.332 in.), of dowel pin in gear assembly, face down (toward housing). Be sure gear rotates freely on carrier bore.
Be careful not to damage the "C" spring, by over compressing with the vise.
20. Install "C" spring (27). Be sure that there is preload when assembled. Orient cover so the dowel, which is pressed into carrier (29), fits into the hole in the cover. The dowel from the gear assembly fits into the slot in the cover.21. Install cover (26) and bolt (25).22. Mount front housing to repair stand.23. If the throttle shaft seal was removed, install it with the lip toward the inside of the governor.24. Install throttle shaft (24) into housing bore, and install retaining ring (22).25. Slide lever (21) and spring (20) onto throttle shaft. The long leg of spring (20) fits into slot on lever (21). The other end of spring (20) fits into slot on the throttle shaft.26. Install throttle spring (23). These parts must be oriented correctly for proper governor operation. Following is a quick check for proper assembly.27. With zero preload on spring, the threaded hole in throttle

Have questions with 101402-9422?





Group cross 101402-9422 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
101402-9422  
 
 
INJECTION-PUMP ASSEMBLY
4TNE94
 
 
INJECTION-PUMP ASSEMBLY

Yanmar 

9 400 612 817 
12990051000 
INJECTION-PUMP ASSEMBLY
4TNE94
9 400 613 180 
12990051001 
INJECTION-PUMP ASSEMBLY
4TNE94
Back to top