101402-8370 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1014028370 8981318500


 

Information injection-pump assembly

ZEXEL 101402-8370 1014028370
ISUZU 8981318500 8981318500
101402-8370 INJECTION-PUMP ASSEMBLY
Rating:
71
Buy INJECTION-PUMP ASSEMBLY 101402-8370 zexel genuine, new aftermarket engine parts with delivery

Service parts 101402-8370 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP
3. GOVERNOR
4. SUPPLY PUMP 105220-7300
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE 156637-2320
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105160-5130
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 18.1(185)
13. NOZZLE-HOLDER 105030-4750
14. NOZZLE 105025-3040
15. NOZZLE SET

Include in #1:

101402-8370 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 101402-8370 1014028370
ISUZU 8981318500 8981318500


Zexel num
Bosch num
Firm num
Name
101402-8370 
 
8981318500  ISUZU
INJECTION-PUMP ASSEMBLY
4BG1-T

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-4920
Overflow valve opening pressure kPa   127 107 147
Overflow valve opening pressure kgf/cm2   1.3 1.1 1.5
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-3-4-2
Pre-stroke mm   3.4 3.35 3.45
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   A
Rack position   7.9
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   79 77.9 80.1
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   -
Rack position   5.9+-0.5
Pump speed r/min   475 475 475
Average injection quantity mm3/st.   8.8 7.4 10.2
Max. variation between cylinders %   0 -14 14
Fixing the rack   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 
Injection quantity adjustment_03
Adjusting point   D
Rack position   8.7++
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   120 115 125
Fixing the lever   *
Rack limit   *

Test data Ex:

Governor adjustment

Test data 101402-8370
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT (4)Set idle sub-spring (5)Rack difference between N = N1 and N = N2
----------
K=6 N1=1100r/min N2=750r/min
----------

Speed control lever angle

Test data 101402-8370
F:Full speed I:Idle (1)Use the hole at R = aa (2)Stopper bolt setting
----------
aa=70mm
----------
a=(1deg)+-5deg b=(24deg)+-5deg

Stop lever angle

Test data 101402-8370
N:Pump normal S:Stop the pump. (1)Normal
----------

----------
a=13deg+-5deg b=53deg+-5deg

Timing setting

Test data 101402-8370
(1)Pump vertical direction (2)Position of gear mark 'CC' at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=9deg
----------
a=(100deg)




Information:

START BY:a. disassemble governorb. remove fuel injection pumps 1. Remove rack (1) from the fuel pump housing. 2. Remove six lifters (2) from the fuel pump housing. Put identification marks on the lifters for installation purposes. 3. Remove camshaft (3) from the fuel pump housing. It may be necessary to use a soft hammer to push the camshaft out of the governor end of the fuel pump housing. 4. Remove races (4) and bearing (5) from the camshaft. Remove ring (6) if necessary. 5. Remove rack bearing (7) from both ends of the housing and dowel (8) if necessary. 6. Use tooling (A), and remove three camshaft bearings (9). 7. Remove the bolts, cover (10) and the gasket. 8. Remove pins (12), the seal and dowels (11) if necessary. Pins (12) must be pushed from the inside out.Assemble Fuel Injection Pump Housing
1. Clean and inspect all parts. Make a replacement of all parts that are worn or damaged. 2. Lubricate the seal with clean engine oil, and install pin (1). Pin (1) must protrude into the pump bore 2.15 .05 mm (.085 .002 in.).3. Install dowel (2) so that it protrudes into the pump bore 1.93 0.05 mm (.076 .002 in.). 4. Install the gasket, cover (3) and the bolts. 5. Install the rack bearing with tooling (A). Install the bearing until the driver comes in contact with the plate. The bearing should be installed to a depth of 83.0 0.5 mm (3.27 .02 in.) from the fuel pump mounting face. 6. Measure rack bearing (4). Dimension (X) must be 11.178 0.05 mm (.4400 .002 in.). Diameter (W) must be 12.767 0.058 mm (.5026 .0022 in.). 7. Install dowel (5). Dowel (5) must protrude 6.0 0.5 mm (.24 .02 in.) from the fuel pump housing face.8. Install the rear rack bearing with tooling (B) to a depth of 7.16 0.13 mm (.282 .005 in.) below the fuel pump housing surface. The inside diameter of the rear rack bearing must be 12.746 0.045 mm (.5018 .0017 in.). 9. Use tooling (C), and install three camshaft bearings (6). Oil holes (7) in the camshaft bearings must be positioned 30° 3° above the horizontal centerline toward the engine side of the fuel pump housing. The outer bearings must be installed 1.0 0.5 mm (0.04 0.02 in.) below the surface marked (Z). The inner bearing must be installed 218.0 0.3 mm (8.58 .012 in.) below the front surface (Y). Diameter (XX) must be 68.339 0.038 mm (2.6905 .0015 in.) after assembly. 10. Install ring (8), races (10) and bearing (9) on the camshaft. 11. Lubricate cam bearings (6) and the camshaft bearing journals with clean engine oil.12. Install camshaft (11) into the fuel pump housing.
The notch in the lifter must be in line with the dowel in the lifter bore. The lifter must slide up and down freely in

Have questions with 101402-8370?





Group cross 101402-8370 ZEXEL

Isuzu 

9 400 619 710 
8973586960 
INJECTION-PUMP ASSEMBLY
4JG1-T
F 019 Z10 725 
8980003280 
INJECTION-PUMP ASSEMBLY
4JG1
F 019 Z10 726 
8973777870 
INJECTION-PUMP ASSEMBLY
4BG1-T
F 019 Z10 464 
8980038750 
INJECTION-PUMP ASSEMBLY
4JG1-T
F 01G 09U 0J8 
8980038751 
INJECTION-PUMP ASSEMBLY
4JG1-TPW-
F 01G 09U 1JN 
8980578290 
INJECTION-PUMP ASSEMBLY
4BG1TRD-0
 
8980876700 
INJECTION-PUMP ASSEMBLY
4BG1PM
 
8981178850 
INJECTION-PUMP ASSEMBLY
4JG1TPD-0
101402-8370  
 
8981318500 
INJECTION-PUMP ASSEMBLY
4BG1-T
Back to top