Buy 101402-8000 ZEXEL 9 400 612 453 BOSCH INJECTION-PUMP ASSEMBLY 9400612453 1014028000 8973116280


 

Information injection-pump assembly

BOSCH 9 400 612 453 9400612453
ZEXEL 101402-8000 1014028000
ISUZU 8973116280 8973116280
101402-8000 INJECTION-PUMP ASSEMBLY
Rating:
25
Buy INJECTION-PUMP ASSEMBLY 101402-8000 zexel genuine, new aftermarket engine parts with delivery

Compare Prices: .

As an associate, we earn commssions on qualifying purchases through the links below
$1,108.00

30 Dec 2024

CN: qian cheng
Fuel Injection Pump 8973116280 for Isuzu Engine 4JG1 Doosan Daewoo Excavator DH55
ADPelcote Part number:8973116280 || Applications:for Isuzu Engine 4JG1 Doosan Daewoo Excavator DH55
$1,108.00
 

19 Jan 2024

CN: XiuGe Parts
Fuel Injection Pump 8973116280 for Isuzu Engine 4JG1 Doosan Daewoo Excavator DH55
TYXxiuge part number:8973116280 || applications:for Isuzu Engine 4JG1 Doosan Daewoo Excavator DH55

Service parts 101402-8000 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101041-9560
3. GOVERNOR 105400-9450
4. SUPPLY PUMP 105220-5850
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE 156643-5020
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105118-6811
11. Nozzle and Holder 8-97238-978-0
12. Open Pre:MPa(Kqf/cm2) 18.1{185}
13. NOZZLE-HOLDER 105048-3230
14. NOZZLE 105017-2880
15. NOZZLE SET

Include in #1:

101402-8000 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 612 453 9400612453
ZEXEL 101402-8000 1014028000
ISUZU 8973116280 8973116280


Zexel num
Bosch num
Firm num
Name
101402-8000 
9 400 612 453 
8973116280  ISUZU
INJECTION-PUMP ASSEMBLY
4JG1 K 14BC INJECTION PUMP ASSY PE4A,5A, PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-0820
Overflow valve opening pressure kPa   127 107 147
Overflow valve opening pressure kgf/cm2   1.3 1.1 1.5
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-3-4-2
Pre-stroke mm   2.6 2.55 2.65
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   A
Rack position   9.2
Pump speed r/min   1050 1050 1050
Average injection quantity mm3/st.   61 60 62
Max. variation between cylinders %   0 -3.5 3.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   -
Rack position   7.8+-0.5
Pump speed r/min   500 500 500
Average injection quantity mm3/st.   17 15 19
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 

Test data Ex:

Governor adjustment

Test data 101402-8000
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Set idle sub-spring (3)Main spring setting
----------
K=9
----------

Speed control lever angle

Test data 101402-8000
F:Full speed I:Idle S:Stop
----------

----------
a=1deg+-5deg b=17deg+-5deg c=31deg+-3deg

Stop lever angle

Test data 101402-8000
N:Pump normal S:Stop the pump. (1)Normal (2)Use the hole at R = aa
----------
aa=25mm
----------
a=53deg+-5deg b=2.5deg+-5deg

Timing setting

Test data 101402-8000
(1)Pump vertical direction (2)Position of gear mark 'W' at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=10deg
----------
a=(210deg)




Information:

start by:a) remove cylinder headsb) remove oil pan1. Remove the carbon from the top inside surface of the cylinders with tool (A). 2. Turn the crankshaft until two pistons are at bottom center.3. Remove connecting rod caps (1) from the two connecting rods. Put pieces of rubber hose or tape on the threads of the connecting rod bolts as protection for the crankshaft. 4. Push the pistons and connecting rods away from the crankshaft until the piston rings are above the cylinder block.5. Remove the two pistons (2) and the connecting rods. Keep each connecting rod cap with its respective connecting rod and piston. Put identification on each connecting rod as to its location for use at installation.
Do not turn the crankshaft while any of the connecting rods are in the engine without the caps installed.
6. Do Steps 2 through 5 for the remainder of the pistons.Install Pistons
Two different pistons are used in 3208 Truck Engines. One piston has a crater volume of 50.4 1.3 cm3 (3.08 .07 in.3), and the other piston has a crater volume of 58.8 1.2 cm3 (3.59 .07 in.3). Check the part number stamped on the top of the piston and refer to the parts book to be sure the correct replacement piston is used. The correct piston must be installed in the engine. If the wrong piston is installed, much damage to the engine will be the result.
1. Put clean engine oil on the piston rings, connecting rod bearings, cylinder walls and crankshaft bearing journals.2. Turn the crankshaft until the bearing journal for the pistons to be installed is at bottom center.3. Make sure the piston ring gaps are at least 120° apart on the piston. 4. Use tool (A) and install the piston in position in the same cylinder bore from which it was removed. The hole (crater) in the top of the piston must be toward (nearest) the center of the engine. For more detail about the installation of connecting rod bearings, see REMOVE AND INSTALL CONNECTING ROD BEARINGS.5. Check the bearing clearances with tool (B).6. Put 2P2506 Thread Lubricant on the threads of the bolts and contact surfaces of the nuts for the connecting rod caps.
When the connecting rod caps are installed, make sure that the number on the side of the cap is next to and respective with the number on the side of the connecting rod.
7. Put the cap (1) in position on the connecting rod and install the nuts. Tighten the nuts to a torque of 40 4 N m (30 3 lb.ft.). Put a mark on each nut and the end of each bolt. Tighten the nuts 60 5° more. 8. Check the side clearance between two connecting rods on the same crankshaft journal. Clearance must be 0.08 to 0.84 mm (.003 to .033 in.) for new rods.9. Do Steps 1 through 8 for the remainder of the pistons.end by:a) install cylinder headsb) install oil panDisassemble Pistons
start by:a)

Have questions with 101402-8000?





Group cross 101402-8000 ZEXEL

Isuzu 

101402-8000  
9 400 612 453 
8973116280 
INJECTION-PUMP ASSEMBLY
4JG1
9 400 612 648 
8973143780 
INJECTION-PUMP ASSEMBLY
4BG1-T
9 400 612 604 
8973187610 
INJECTION-PUMP ASSEMBLY
4JG1-T
9 400 612 936 
8973187611 
INJECTION-PUMP ASSEMBLY
4JG1-T
9 400 613 984 
8973187612 
INJECTION-PUMP ASSEMBLY
4JG1-T
9 400 612 605 
8973195040 
INJECTION-PUMP ASSEMBLY
4BG1-T
9 400 612 649 
8973233140 
INJECTION-PUMP ASSEMBLY
4BG1-T
9 400 612 741 
8973225540 
INJECTION-PUMP ASSEMBLY
4BG1
9 400 612 781 
8973225550 
INJECTION-PUMP ASSEMBLY
4BG1-T
9 400 612 782 
8973238370 
INJECTION-PUMP ASSEMBLY
4BG1-T
9 400 613 985 
8973238371 
INJECTION-PUMP ASSEMBLY
4BG1-T
F 019 Z10 724 
8973238372 
INJECTION-PUMP ASSEMBLY
4BG1-TCG-
9 400 613 986 
8973258420 
INJECTION-PUMP ASSEMBLY
4BG1-T
9 400 613 987 
8973257390 
INJECTION-PUMP ASSEMBLY
4BG1-T
Back to top