101402-7970 ZEXEL 9 400 612 452 BOSCH INJECTION-PUMP ASSEMBLY 9400612452 1014027970 8973137010


 

Information injection-pump assembly

BOSCH 9 400 612 452 9400612452
ZEXEL 101402-7970 1014027970
ISUZU 8973137010 8973137010
101402-7970 INJECTION-PUMP ASSEMBLY
Rating:
22
Buy INJECTION-PUMP ASSEMBLY 101402-7970 zexel genuine, new aftermarket engine parts with delivery

Service parts 101402-7970 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101041-8900
3. GOVERNOR 105419-4830
4. SUPPLY PUMP 105220-6250
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE 156643-2520
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105160-5130
11. Nozzle and Holder 8-97222-170-0
12. Open Pre:MPa(Kqf/cm2) 18.1{185}
13. NOZZLE-HOLDER 105030-4750
14. NOZZLE 105025-3040
15. NOZZLE SET

Include in #1:

101402-7970 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 612 452 9400612452
ZEXEL 101402-7970 1014027970
ISUZU 8973137010 8973137010


Zexel num
Bosch num
Firm num
Name
101402-7970 
9 400 612 452 
8973137010  ISUZU
INJECTION-PUMP ASSEMBLY
4BG1-T K 14BC INJECTION PUMP ASSY PE4A,5A, PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-4920
Overflow valve opening pressure kPa   127 107 147
Overflow valve opening pressure kgf/cm2   1.3 1.1 1.5
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-3-4-2
Pre-stroke mm   3.4 3.35 3.45
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   A
Rack position   8.6
Pump speed r/min   1025 1025 1025
Average injection quantity mm3/st.   86.5 85.4 87.6
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   -
Rack position   6.3+-0.5
Pump speed r/min   500 500 500
Average injection quantity mm3/st.   12 10.6 13.4
Max. variation between cylinders %   0 -14 14
Fixing the rack   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 
Injection quantity adjustment_03
Adjusting point   D
Rack position   8.8++
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   125 120 130
Fixing the lever   *
Rack limit   *

Test data Ex:

Governor adjustment

Test data 101402-7970
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT (4)Set idle sub-spring (5)Main spring setting
----------
K=14
----------

Speed control lever angle

Test data 101402-7970
F:Full speed I:Idle S:Stop (1)Stopper bolt setting
----------

----------
a=(3deg)+-5deg b=35deg+-5deg c=(20deg)+-5deg

Stop lever angle

Test data 101402-7970
N:Pump normal S:Stop the pump. (1)Normal
----------

----------
a=13deg+-5deg b=53deg+-5deg

Timing setting

Test data 101402-7970
(1)Pump vertical direction (2)Position of gear mark 'CC' at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=9deg
----------
a=(100deg)




Information:

start by:a) remove exhaust manifoldb) remove air inlet manifoldc) remove valve coversd) remove fuel injection linese) remove fuel injection nozzles1. Remove the coolant from the cooling system. 2. Remove clamp (2) from water sleeves (1) in each cylinder head. Push the water sleeves into the timing gear cover with tool (A) and a screwdriver. 3. Remove bolt (3) from the bracket on the dipstick tube. 4. Remove bolts (4) and stud (5) from the heads.
Make sure the fuel injection nozzles are removed before the cylinder heads are removed. The fuel injection nozzles go through the cylinder heads and the nozzle tips can be broken off if the nozzles are not removed from the heads.
5. Install tooling (B) and fasten a hoist. Remove bolts (7), cylinder head (6) and the gasket. The weight of the cylinder head is 54 kg (120 lb.).Install Cylinder Heads
1. Clean the contact surfaces of the cylinder head and cylinder block. Make sure the surfaces are clean and dry. Install a new cylinder head gasket. Clean the bore in the cylinder head for the water sleeves. Put oil on the seals on the water sleeves.2. Install tooling (B) in the cylinder head. Fasten a hoist and put the cylinder head in position on the cylinder block.3. Put 6V4876 Molykote Lubricant on the bolt threads and install the bolts that hold the cylinder head in their correct location. Tighten the bolts in the cylinder head according to the HEAD BOLT TORQUE CHART.
The higher cylinder head bolt torque may be used on earlier engines ONLY if the bolts are replaced with the later higher strength bolts (seven dash marks on the bolt head). If the earlier bolts are tightened to the later torque specification, they may yield (stretch) and lose their clamping force.
4. Install water sleeve into cylinder head with tool (A). Install the clamp on the water sleeves.5. Fill the cooling system with coolant to the correct level. end by:a) install fuel injection nozzlesb) install rocker shafts and push rodsc) install valve coversd) install air inlet manifolde) install exhaust manifold
Illustration 1. Bolt head identification.Disassemble Cylinder Heads
start by: a) remove cylinder heads1. Fasten a hoist and put the cylinder head in position on tool (A). Use adapter plates (1) from tooling (A) to hold the head in place. 2. Put the valve springs under compression with tool (C). 3. Remove the locks from the valves. Earlier engines have an inner valve spring. Later engines have only one valve spring and a spacer instead of inner spring.4. Remove tool (C), retainer, spring, washer and valve from the cylinder head. Put identification on the valve as to its location in the cylinder head. 5. Check the valve spring force with tool (B). For the correct spring force, see the subject VALVES in SPECIFICATIONS.6. Do Steps 2 through 5 for the remainder of the valves.7. Remove the valve seat inserts with tooling (D). The valve guides are part of the cylinder head. Measure the bore in each valve guide 19.0

Have questions with 101402-7970?





Group cross 101402-7970 ZEXEL

Isuzu 

9 400 612 106 
8972485531 
INJECTION-PUMP ASSEMBLY
4JG1
9 400 612 158 
8972485532 
INJECTION-PUMP ASSEMBLY
4JG1
9 400 612 352 
8972485533 
INJECTION-PUMP ASSEMBLY
4JG1
9 400 612 450 
8972485534 
INJECTION-PUMP ASSEMBLY
4JG1
9 400 612 520 
8972611760 
INJECTION-PUMP ASSEMBLY
4BG1-T
9 400 613 042 
8972611761 
INJECTION-PUMP ASSEMBLY
4BG1-T
 
8972611770 
INJECTION-PUMP ASSEMBLY
4BG1-T
9 400 612 521 
8972611771 
INJECTION-PUMP ASSEMBLY
4BG1-T
9 400 613 097 
8972611772 
INJECTION-PUMP ASSEMBLY
4BG1-T
9 400 612 561 
8972485510 
INJECTION-PUMP ASSEMBLY
4JG1
9 400 612 451 
8972485511 
INJECTION-PUMP ASSEMBLY
4JG1
9 400 612 297 
8973041230 
INJECTION-PUMP ASSEMBLY
4BG1-T
9 400 612 353 
8973041231 
INJECTION-PUMP ASSEMBLY
4BG1-T
9 400 612 487 
8973058070 
INJECTION-PUMP ASSEMBLY
4BG1
9 400 612 354 
8973112500 
INJECTION-PUMP ASSEMBLY
4BG1-T
101402-7970  
9 400 612 452 
8973137010 
INJECTION-PUMP ASSEMBLY
4BG1-T
9 400 613 982 
8973133020 
INJECTION-PUMP ASSEMBLY
4JG1-T
9 400 613 983 
8973138890 
INJECTION-PUMP ASSEMBLY
4BG1-T
Back to top