Information injection-pump assembly
ZEXEL
101402-7920
1014027920
ISUZU
8972611770
8972611770

Rating:
Service parts 101402-7920 INJECTION-PUMP ASSEMBLY:
1.
_
5.
AUTOM. ADVANCE MECHANIS
6.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
12.
Open Pre:MPa(Kqf/cm2)
15.
NOZZLE SET
Cross reference number
ZEXEL
101402-7920
1014027920
ISUZU
8972611770
8972611770
Zexel num
Bosch num
Firm num
Name
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 6-2-600
Outer diameter - inner diameter - length (mm) mm 6-2-600
Overflow valve
134424-4120
Overflow valve opening pressure
kPa
255
221
289
Overflow valve opening pressure
kgf/cm2
2.6
2.25
2.95
Tester oil delivery pressure
kPa
255
255
255
Tester oil delivery pressure
kgf/cm2
2.6
2.6
2.6
Direction of rotation (viewed from drive side)
Right R
Right R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right R
Right R
Injection order
1-3-4-2
Pre-stroke
mm
4.2
4.15
4.25
Beginning of injection position
Drive side NO.1
Drive side NO.1
Difference between angles 1
Cal 1-3 deg. 90 89.5 90.5
Cal 1-3 deg. 90 89.5 90.5
Difference between angles 2
Cal 1-4 deg. 180 179.5 180.5
Cal 1-4 deg. 180 179.5 180.5
Difference between angles 3
Cyl.1-2 deg. 270 269.5 270.5
Cyl.1-2 deg. 270 269.5 270.5
Injection quantity adjustment
Adjusting point
A
Rack position
10.6
Pump speed
r/min
1100
1100
1100
Average injection quantity
mm3/st.
95.5
94.4
96.6
Max. variation between cylinders
%
0
-2
2
Basic
*
Fixing the lever
*
Boost pressure
kPa
81.3
81.3
Boost pressure
mmHg
610
610
Injection quantity adjustment_02
Adjusting point
-
Rack position
7.7+-0.5
Pump speed
r/min
500
500
500
Average injection quantity
mm3/st.
8.8
7.4
10.2
Max. variation between cylinders
%
0
-14
14
Fixing the rack
*
Boost pressure
kPa
0
0
0
Boost pressure
mmHg
0
0
0
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
Adjust only variation between cylinders; adjust governor according to governor specifications.
Injection quantity adjustment_03
Adjusting point
E
Rack position
10.8++
Pump speed
r/min
100
100
100
Average injection quantity
mm3/st.
120
115
125
Fixing the lever
*
Boost pressure
kPa
0
0
0
Boost pressure
mmHg
0
0
0
Rack limit
*
Boost compensator adjustment
Pump speed
r/min
500
500
500
Rack position
R1-1
Boost pressure
kPa
20
16
24
Boost pressure
mmHg
150
120
180
Boost compensator adjustment_02
Pump speed
r/min
500
500
500
Rack position
R1(10.6)
Boost pressure
kPa
68
61.3
74.7
Boost pressure
mmHg
510
460
560
Test data Ex:
Governor adjustment

N:Pump speed
R:Rack position (mm)
(1)Target notch: K
(2)Tolerance for racks not indicated: +-0.05
(3)RACK LIMIT
(4)Boost compensator stroke: BCL
(5)Set idle sub-spring
(6)Main spring setting
----------
K=12 BCL=1+-0.1mm
----------
----------
K=12 BCL=1+-0.1mm
----------
Speed control lever angle

F:Full speed
I:Idle
S:Stop
(1)Use the hole at R = aa
(2)Stopper bolt setting
----------
aa=94mm
----------
a=20deg+-5deg b=11deg+-5deg c=35deg+-3deg
----------
aa=94mm
----------
a=20deg+-5deg b=11deg+-5deg c=35deg+-3deg
Stop lever angle

N:Pump normal
S:Stop the pump.
(1)Pump speed aa and rack position bb (to be sealed at delivery)
(2)Normal
----------
aa=0r/min bb=1-0.5mm
----------
a=32deg+-5deg b=(55deg)
----------
aa=0r/min bb=1-0.5mm
----------
a=32deg+-5deg b=(55deg)
0000001501 TAMPER PROOF

Tamperproofing-equipped boost compensator cover installation procedure
(A) After adjusting the boost compensator, tighten the bolts to remove the heads.
(1)Before adjusting the governor and the boost compensator, tighten the screw to the specified torque.
(Tightening torque T = T1 maximum)
(2)After adjusting the governor and the boost compensator, tighten to the specified torque to break off the bolt heads.
(Tightening torque T = T2)
----------
T1=2.5N-m(0.25kgf-m) T2=2.9~4.4N-m(0.3~0.45kgf-m)
----------
----------
T1=2.5N-m(0.25kgf-m) T2=2.9~4.4N-m(0.3~0.45kgf-m)
----------
Timing setting

(1)Pump vertical direction
(2)Position of gear mark 'CC' at No 1 cylinder's beginning of injection
(3)B.T.D.C.: aa
(4)-
----------
aa=7deg
----------
a=(100deg)
----------
aa=7deg
----------
a=(100deg)
Information:
Illustration 2 g01132938
(1) HEUI pump (2) Fuel transfer pump (4) Drive gear (5) 227-5904 O-Ring Seal (6) Tie Bolt (7) Bolts for the fuel transfer pump (8) Tie Bolts (9) Location for temporary bolt (12) 185-3241 O-Ring Seal
Remove the single tie bolt (6) that is located in the top left corner of the pump by using Tooling (B). Refer to Illustration 2. Only remove the single tie bolt (6). Removing more bolts will result in damage to the pump.
Replace tie bolt (6) with the temporary bolt (9) that is provided in the service kit.Note: The temporary bolt that is provided in the kit has an undersized bolt head. The temporary bolt prevents the body of the HEUI pump from separating during service. Do not remove the temporary bolt until the fuel transfer pump has been completely reinstalled.
Tighten the temporary bolt (9) to 10 N m (7.4 lb ft) by using Tooling (C) .Note: Do not place an excessive torque on the temporary bolt. The aluminum housing of the pump could be damaged.
After installing the temporary bolt (9) in the top left location, remove the three bolts (7) that fasten the fuel transfer pump to the HEUI pump by using Tooling (A) .
Proceed by removing the remaining three tie bolts (8) by using Tooling (B) .
Illustration 3 g01132944
(1) HEUI pump (2) Fuel transfer pump (9) Temporary bolt (10) Seals (11) Seal
Separate the fuel transfer pump from the HEUI pump. Refer to Illustration 3.Installing the Fuel Transfer Pump onto the HEUI Pump
Illustration 4 g01458639
(1) HEUI pump (10) 239-2402 Seals
Install the three new 239-2402 Seals (10) on the back face of the HEUI pump (1). Refer to Illustration 4.
Illustration 5 g01470031
(2) Fuel transfer pump (11) 179-8128 Seal
Install a new 179-8128 Seal (11) on the fuel transfer pump (2). Refer to Illustration 5. Use 1U-6396 O-Ring Assembly Compound in order to hold the seal in place during assembly. Ensure that the seal is completely seated.
Illustration 6 g01132969
Do not remove the temporary bolt. Position the fuel transfer pump on the HEUI pump. Be sure to properly align the drive tang on the fuel transfer pump with the drive slot on the HEUI pump.Note: Align the drive tang of the fuel transfer pump so that the flat end is vertical. Refer to Illustration 5. Align the drive slot in the HEUI pump to a similar vertical orientation by using a flat head screwdriver. Refer to Illustration 6.Note: Once the fuel transfer pump has been placed onto the HEUI pump, ensure that the face of the fuel transfer pump is flush with the face of the HEUI pump. If the pump faces are not flush, verify the alignment of the drive tang.
Illustration 7 g01132938
(1) HEUI pump (2) Fuel transfer pump (4) Drive gear (5) 227-5904 O-Ring Seal (6) Tie Bolt (7) Bolts for the fuel transfer pump (8) Tie Bolts (9) Location for temporary bolt (12) 185-3241 O-Ring Seal
Install the three mounting bolts (7) for the fuel transfer pump (2).