Information injection-pump assembly
ZEXEL
101402-7350
1014027350

Rating:
Service parts 101402-7350 INJECTION-PUMP ASSEMBLY:
1.
_
5.
AUTOM. ADVANCE MECHANIS
6.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
1-15300-331-0
12.
Open Pre:MPa(Kqf/cm2)
18.1{185}
15.
NOZZLE SET
Cross reference number
ZEXEL
101402-7350
1014027350
Zexel num
Bosch num
Firm num
Name
101402-7350
INJECTION-PUMP ASSEMBLY
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 6-2-600
Outer diameter - inner diameter - length (mm) mm 6-2-600
Overflow valve
131424-4920
Overflow valve opening pressure
kPa
127
107
147
Overflow valve opening pressure
kgf/cm2
1.3
1.1
1.5
Tester oil delivery pressure
kPa
157
157
157
Tester oil delivery pressure
kgf/cm2
1.6
1.6
1.6
Direction of rotation (viewed from drive side)
Right R
Right R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right R
Right R
Injection order
1-3-4-2
Pre-stroke
mm
3.4
3.35
3.45
Beginning of injection position
Drive side NO.1
Drive side NO.1
Difference between angles 1
Cal 1-3 deg. 90 89.5 90.5
Cal 1-3 deg. 90 89.5 90.5
Difference between angles 2
Cal 1-4 deg. 180 179.5 180.5
Cal 1-4 deg. 180 179.5 180.5
Difference between angles 3
Cyl.1-2 deg. 270 269.5 270.5
Cyl.1-2 deg. 270 269.5 270.5
Injection quantity adjustment
Adjusting point
A
Rack position
8.7
Pump speed
r/min
1025
1025
1025
Average injection quantity
mm3/st.
87
85.9
88.1
Max. variation between cylinders
%
0
-2
2
Basic
*
Fixing the lever
*
Injection quantity adjustment_02
Adjusting point
-
Rack position
6.2+-0.5
Pump speed
r/min
425
425
425
Average injection quantity
mm3/st.
8.8
7.4
10.2
Max. variation between cylinders
%
0
-14
14
Fixing the rack
*
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
Adjust only variation between cylinders; adjust governor according to governor specifications.
Test data Ex:
Governor adjustment

N:Pump speed
R:Rack position (mm)
(1)Target notch: K
(2)Tolerance for racks not indicated: +-0.05mm.
(3)Set idle sub-spring
(4)Main spring setting
----------
K=10
----------
----------
K=10
----------
Speed control lever angle

F:Full speed
I:Idle
D:Dead point
(1)With variable lever
----------
----------
a=(21deg)+-5deg b=(19deg)+-5deg c=(10deg)+-3deg
----------
----------
a=(21deg)+-5deg b=(19deg)+-5deg c=(10deg)+-3deg
Stop lever angle

N:Pump normal
S:Stop the pump.
----------
----------
a=6deg+-5deg b=46deg+-5deg
----------
----------
a=6deg+-5deg b=46deg+-5deg
Timing setting

(1)Pump vertical direction
(2)Position of gear mark 'CC' at No 1 cylinder's beginning of injection
(3)B.T.D.C.: aa
(4)-
----------
aa=14deg
----------
a=(100deg)
----------
aa=14deg
----------
a=(100deg)
Information:
Cylinder Head Removal And Installation
Refer to SERVICE GUIDE for Preliminary Information.
1-Water pipe. 2-Fan and pulley mounting bracket assembly. 3-Water bypass line. 4-Air compressor water return line.
5-Turbocharger-to-inlet manifold air pipe. 6-Turbocharger lubrication oil supply line. 7-Turbocharger oil drain line. 8-Exhaust elbow. 9-Turbocharger. 10-Fuel lines (six). 11-Valve cover. 12-Cylinder head.Cylinder Head Disassembly And Assembly
Refer to SERVICE GUIDE for Preliminary Information.5F8353 Wrench5S1330 Valve Spring Compressor Group7S8858 Valve Guide Driver Bushing7S8859 Valve Guide DriverFT192 Driver9M3710 Anti-Seize Compound8S3080 Tool Group9S3084 Extractor Head9S3087 Extractor HeadApply 9M3710 Anti-Seize Compound to threads. Tighten all head bolts (1, 2 and 3) in Step sequence shown. Use gaskets (6) to position precombustion chambers (4) to prevent wiring interference. Install thinnest gasket (6) first. Install precombustion chamber and tighten to specified torque. If the glow plug opening is not positioned in the "go" range, remove the chamber and replace gasket with that called for in the diagram.4 Use 5F8353 Wrench to remove and install chamber. Coat threads with 9M3710 Anti-Seize Compound.5 Coat seal and mating surface in bore with liquid soap.7 Align opening in water director with "V" mark on head.8 Gasket to be clean and dry at installation.9, 10 Tool required: 5S1330 Valve Spring Compressor Group. Assemble spring with painted end up.11 Tool required to remove valve guide: 7S8859 Valve Guide Driver. Tools required to install valve guide: 7S8859 Valve Guide Driver, 7S8858 Valve Guide Driver Bushing.12 Valve seat inserts can be removed and new inserts installed in the cylinder heads. Tools required to remove inserts: 9S3080 Tool Group, 9S3084 Extractor Head, 9S3087 Extractor Head.13 Tool required to install bearing: FT192 Driver. Align hole in bearing with hole in rocker arm.
Refer to SERVICE GUIDE for Preliminary Information.
1-Water pipe. 2-Fan and pulley mounting bracket assembly. 3-Water bypass line. 4-Air compressor water return line.
5-Turbocharger-to-inlet manifold air pipe. 6-Turbocharger lubrication oil supply line. 7-Turbocharger oil drain line. 8-Exhaust elbow. 9-Turbocharger. 10-Fuel lines (six). 11-Valve cover. 12-Cylinder head.Cylinder Head Disassembly And Assembly
Refer to SERVICE GUIDE for Preliminary Information.5F8353 Wrench5S1330 Valve Spring Compressor Group7S8858 Valve Guide Driver Bushing7S8859 Valve Guide DriverFT192 Driver9M3710 Anti-Seize Compound8S3080 Tool Group9S3084 Extractor Head9S3087 Extractor HeadApply 9M3710 Anti-Seize Compound to threads. Tighten all head bolts (1, 2 and 3) in Step sequence shown. Use gaskets (6) to position precombustion chambers (4) to prevent wiring interference. Install thinnest gasket (6) first. Install precombustion chamber and tighten to specified torque. If the glow plug opening is not positioned in the "go" range, remove the chamber and replace gasket with that called for in the diagram.4 Use 5F8353 Wrench to remove and install chamber. Coat threads with 9M3710 Anti-Seize Compound.5 Coat seal and mating surface in bore with liquid soap.7 Align opening in water director with "V" mark on head.8 Gasket to be clean and dry at installation.9, 10 Tool required: 5S1330 Valve Spring Compressor Group. Assemble spring with painted end up.11 Tool required to remove valve guide: 7S8859 Valve Guide Driver. Tools required to install valve guide: 7S8859 Valve Guide Driver, 7S8858 Valve Guide Driver Bushing.12 Valve seat inserts can be removed and new inserts installed in the cylinder heads. Tools required to remove inserts: 9S3080 Tool Group, 9S3084 Extractor Head, 9S3087 Extractor Head.13 Tool required to install bearing: FT192 Driver. Align hole in bearing with hole in rocker arm.
Have questions with 101402-7350?
Group cross 101402-7350 ZEXEL
Isuzu
101402-7350
INJECTION-PUMP ASSEMBLY