Information injection-pump assembly
BOSCH
9 400 613 958
9400613958
ZEXEL
101402-7290
1014027290
ISUZU
8971895830
8971895830

Rating:
Service parts 101402-7290 INJECTION-PUMP ASSEMBLY:
1.
_
5.
AUTOM. ADVANCE MECHANIS
6.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
1-15300-291-2
12.
Open Pre:MPa(Kqf/cm2)
18.1{185}
15.
NOZZLE SET
Cross reference number
BOSCH
9 400 613 958
9400613958
ZEXEL
101402-7290
1014027290
ISUZU
8971895830
8971895830
Zexel num
Bosch num
Firm num
Name
101402-7290
9 400 613 958
8971895830 ISUZU
INJECTION-PUMP ASSEMBLY
4BG1 K 14BC INJECTION PUMP ASSY PE4A,5A, PE
4BG1 K 14BC INJECTION PUMP ASSY PE4A,5A, PE
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 6-2-600
Outer diameter - inner diameter - length (mm) mm 6-2-600
Overflow valve
131424-4920
Overflow valve opening pressure
kPa
127
107
147
Overflow valve opening pressure
kgf/cm2
1.3
1.1
1.5
Tester oil delivery pressure
kPa
157
157
157
Tester oil delivery pressure
kgf/cm2
1.6
1.6
1.6
Direction of rotation (viewed from drive side)
Right R
Right R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right R
Right R
Injection order
1-3-4-2
Pre-stroke
mm
3.6
3.55
3.65
Beginning of injection position
Drive side NO.1
Drive side NO.1
Difference between angles 1
Cal 1-3 deg. 90 89.5 90.5
Cal 1-3 deg. 90 89.5 90.5
Difference between angles 2
Cal 1-4 deg. 180 179.5 180.5
Cal 1-4 deg. 180 179.5 180.5
Difference between angles 3
Cyl.1-2 deg. 270 269.5 270.5
Cyl.1-2 deg. 270 269.5 270.5
Injection quantity adjustment
Adjusting point
A
Rack position
10.5
Pump speed
r/min
875
875
875
Average injection quantity
mm3/st.
70
68.9
71.1
Max. variation between cylinders
%
0
-2
2
Basic
*
Fixing the lever
*
Injection quantity adjustment_02
Adjusting point
-
Rack position
8.8+-0.5
Pump speed
r/min
425
425
425
Average injection quantity
mm3/st.
12.5
11.1
13.9
Max. variation between cylinders
%
0
-14
14
Fixing the rack
*
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
Adjust only variation between cylinders; adjust governor according to governor specifications.
Injection quantity adjustment_03
Adjusting point
C
Rack position
-
Pump speed
r/min
100
100
100
Average injection quantity
mm3/st.
155
150
160
Fixing the lever
*
Rack limit
*
Test data Ex:
Governor adjustment

N:Pump speed
R:Rack position (mm)
(1)Target notch: K
(2)Tolerance for racks not indicated: +-0.05mm.
(3)RACK LIMIT
(4)Set idle sub-spring
(5)Main spring setting
----------
K=8
----------
----------
K=8
----------
Speed control lever angle

F:Full speed
I:Idle
(1)Stopper bolt setting
----------
----------
a=0deg+-5deg b=16deg+-5deg
----------
----------
a=0deg+-5deg b=16deg+-5deg
Stop lever angle

N:Pump normal
S:Stop the pump.
----------
----------
a=4.5deg+-5deg b=53deg+-5deg
----------
----------
a=4.5deg+-5deg b=53deg+-5deg
Timing setting

(1)Pump vertical direction
(2)Position of gear mark 'CC' at No 1 cylinder's beginning of injection
(3)B.T.D.C.: aa
(4)-
----------
aa=14deg
----------
a=(100deg)
----------
aa=14deg
----------
a=(100deg)
Information:
Remove Brakesaver Control Valve
1. Drain the oil from the oil pan. 2. Remove two short bolts (1) and two longer bolts (3) from manifold (2) and BrakeSaver housing. Remove manifold (2). Remove the O-ring seals from the manifold. 3. Remove oil temperature sensing unit (4) from the BrakeSaver control valve.4. Disconnect air line (5) and hose assembly (6) from the BrakeSaver control valve. 5. Remove bolt (7) and retainer (8) that hold the oil lines in the BrakeSaver control valve. 6. Disconnect oil lines (9) and (10) from the oil cooler. Remove oil lines (9) and (10) from the BrakeSaver control valve. 7. Remove bolts (12) and BrakeSaver control valve (11) from under the oil pan. The weight is 48 lb. (22 kg).8. Remove elbow (13) from the BrakeSaver control valve. Remove the O-ring seals.Install Brakesaver Control Valve
1. Inspect the O-ring seals for damage and make replacements if needed. Put clean oil on the O-ring seals. 2. Install the O-ring seals and elbow (3) on the BrakeSaver control valve.3. Make sure the O-ring seals are in position on the face of the BrakeSaver control valve. Put BrakeSaver control valve (1) in position under the oil pan. Install bolts (2) that hold the BrakeSaver control valve to the oil pan. 4. Install oil temperature sensing unit (4) in the BrakeSaver control valve.5. Connect air line (5) and hose assembly (6) to the BrakeSaver control valve. 6. Install O-ring seals (7) and (8) on manifold (9). Install manifold (9) in the BrakeSaver control valve. Install the four bolts that hold the manifold to the BrakeSaver housing. 7. Make sure the O-ring seals are in place on the oil lines and install oil lines (10) and (11). 8. Install retainer (12) to hold the oil lines in the BrakeSaver control valve. If the bottom plug in the oil pan was removed, put the split (seam) of the gasket for the plug against the oil pan. If either plug on the side of the oil pan was removed, put 5P3413 Pipe Sealant on the threads and tighten the plug to a torque of 60 8 lb. ft. (80 11 N m).9. Fill the engine with oil. See LUBRICATION AND MAINTENANCE GUIDE.Disassemble Brakesaver Control Valve
start by:a) remove BrakeSaver control valve 1. Remove O-ring seals (1) from the valve body.
Spring force is behind the cover at removal.
2. Remove four bolts (2) slowly and evenly from cover (4). Remove the cover.3. Remove cover (3) and the seal from the opposite end of the valve body. 4. Remove spool (8) as an assembly.5. Remove spring (7), stop (10), spring (6) and slug (9).6. Remove the O-ring seals and sleeve (5). 7. Remove bolt (11), plate (13) and diaphragm (12) from the spool. Make an inspection of the pin on the spool, and make a replacement of the pin if there is damage or wear.Assemble Brakesaver Control Valve
1. Install diaphragm (4) and plate (8) on valve spool (3). Make alignment of the hole in the
1. Drain the oil from the oil pan. 2. Remove two short bolts (1) and two longer bolts (3) from manifold (2) and BrakeSaver housing. Remove manifold (2). Remove the O-ring seals from the manifold. 3. Remove oil temperature sensing unit (4) from the BrakeSaver control valve.4. Disconnect air line (5) and hose assembly (6) from the BrakeSaver control valve. 5. Remove bolt (7) and retainer (8) that hold the oil lines in the BrakeSaver control valve. 6. Disconnect oil lines (9) and (10) from the oil cooler. Remove oil lines (9) and (10) from the BrakeSaver control valve. 7. Remove bolts (12) and BrakeSaver control valve (11) from under the oil pan. The weight is 48 lb. (22 kg).8. Remove elbow (13) from the BrakeSaver control valve. Remove the O-ring seals.Install Brakesaver Control Valve
1. Inspect the O-ring seals for damage and make replacements if needed. Put clean oil on the O-ring seals. 2. Install the O-ring seals and elbow (3) on the BrakeSaver control valve.3. Make sure the O-ring seals are in position on the face of the BrakeSaver control valve. Put BrakeSaver control valve (1) in position under the oil pan. Install bolts (2) that hold the BrakeSaver control valve to the oil pan. 4. Install oil temperature sensing unit (4) in the BrakeSaver control valve.5. Connect air line (5) and hose assembly (6) to the BrakeSaver control valve. 6. Install O-ring seals (7) and (8) on manifold (9). Install manifold (9) in the BrakeSaver control valve. Install the four bolts that hold the manifold to the BrakeSaver housing. 7. Make sure the O-ring seals are in place on the oil lines and install oil lines (10) and (11). 8. Install retainer (12) to hold the oil lines in the BrakeSaver control valve. If the bottom plug in the oil pan was removed, put the split (seam) of the gasket for the plug against the oil pan. If either plug on the side of the oil pan was removed, put 5P3413 Pipe Sealant on the threads and tighten the plug to a torque of 60 8 lb. ft. (80 11 N m).9. Fill the engine with oil. See LUBRICATION AND MAINTENANCE GUIDE.Disassemble Brakesaver Control Valve
start by:a) remove BrakeSaver control valve 1. Remove O-ring seals (1) from the valve body.
Spring force is behind the cover at removal.
2. Remove four bolts (2) slowly and evenly from cover (4). Remove the cover.3. Remove cover (3) and the seal from the opposite end of the valve body. 4. Remove spool (8) as an assembly.5. Remove spring (7), stop (10), spring (6) and slug (9).6. Remove the O-ring seals and sleeve (5). 7. Remove bolt (11), plate (13) and diaphragm (12) from the spool. Make an inspection of the pin on the spool, and make a replacement of the pin if there is damage or wear.Assemble Brakesaver Control Valve
1. Install diaphragm (4) and plate (8) on valve spool (3). Make alignment of the hole in the
Have questions with 101402-7290?
Group cross 101402-7290 ZEXEL
Isuzu
Isuzu
Isuzu
101402-7290
9 400 613 958
8971895830
INJECTION-PUMP ASSEMBLY
4BG1
4BG1