101402-7090 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1014027090 8971660770


 

Information injection-pump assembly

ZEXEL 101402-7090 1014027090
ISUZU 8971660770 8971660770
101402-7090 INJECTION-PUMP ASSEMBLY
Rating:
76
Buy INJECTION-PUMP ASSEMBLY 101402-7090 zexel genuine, new aftermarket engine parts with delivery

Service parts 101402-7090 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101041-8311
3. GOVERNOR 105419-2670
4. SUPPLY PUMP 105220-6250
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE 156638-8621
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-6521
11. Nozzle and Holder 8-97030-285-1
12. Open Pre:MPa(Kqf/cm2) 14.7{150}
13. NOZZLE-HOLDER 105030-4361
14. NOZZLE 105015-3930
15. NOZZLE SET

Include in #1:

101402-7090 as INJECTION-PUMP ASSEMBLY

Include in #2:

Cross reference number

ZEXEL 101402-7090 1014027090
ISUZU 8971660770 8971660770


Zexel num
Bosch num
Firm num
Name
101402-7090 
101402-7091 
 
8971660770  ISUZU
INJECTION-PUMP ASSEMBLY
4BG1 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-4920
Overflow valve opening pressure kPa   127 107 147
Overflow valve opening pressure kgf/cm2   1.3 1.1 1.5
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-3-4-2
Pre-stroke mm   3.4 3.35 3.45
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   A
Rack position   8.8
Pump speed r/min   1250 1250 1250
Average injection quantity mm3/st.   83.5 82.4 84.6
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   6+-0.5
Pump speed r/min   425 425 425
Average injection quantity mm3/st.   8.5 7.1 9.9
Max. variation between cylinders %   0 -14 14
Fixing the rack   *

Test data Ex:

Governor adjustment

Test data 101402-7090
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)Set idle sub spring. (4)Main spring setting
----------
K=12
----------

Speed control lever angle

Test data 101402-7090
F:Full speed I:Idle S:Stop
----------

----------
a=18deg+-5deg b=30deg+-5deg c=35deg+-3deg

Stop lever angle

Test data 101402-7090
N:Pump normal S:Stop the pump. (1)Without return spring
----------

----------
a=66.5deg+-5deg b=53deg+-5deg

Timing setting

Test data 101402-7090
(1)Pump vertical direction (2)Position of gear mark 'CC' at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=14deg
----------
a=(90deg)




Information:

start by:a) remove air compressor 1. Remove elbow (1) and adapter. Remove the gasket, screen and gasket from behind the flange.2. Remove air compressor governor (2).3. Put a mark on the head assembly and block for correct assembly. 4. Remove six bolts (3). Remove head assembly (4). 5. Remove inlet valve springs (5) from the head assembly.6. Remove discharge valve seats (6). 7. Remove discharge valves (7). Remove springs from behind the valves. Check the discharge valve stops for wear or damage. If the discharge valve travel exceeds .057 in. (1.45 mm), make a replacement of the head assembly. 8. Remove inlet valves (8) from guides. Remove guides (9) from around the inlet valve seats. 9. Remove unloader spring (10), spring seat and spring saddle (12).10. Remove unloader plungers (11) and guides. 11. To remove unloader pistons (13) from the bore, put a cover over the inlet port, then blow air pressure in the governor mounting pad unloader port (14). 12. Check inlet valve seats (15) and unloader bore bushings (16) for damage or wear. If necessary, make a replacement. 13. Remove bolts (17). Remove cover (18) and gasket from the crankcase assembly.14. Put marks on the rod bearing caps and rods for correct assembly. 15. Remove bolts (19) and locks. Remove rod bearing caps (20). Push the pistons and rods through the top of the crankcase assembly. 16. Remove rod pin (21) from the piston. Remove rod (23).17. Remove bearings (22) from the rods and caps. 18. Use tooling (A) to remove bushing (24) from the rod. 19. Remove buttons (25) from each end of the rod pins. 20. Remove piston rings (26) from piston (27) with an approved ring expander. 21. Remove O-ring seal (29) from the crankshaft.22. Remove bolts (28). Remove adapter (30) from the crankcase assembly. 23. Remove three O-ring seals (32) from the adapter.24. Remove thrust bearing (31). 25. Use tooling (A) and a press to remove the bearing from the adapter.
Do not cause damage to the bearing surfaces of the crankshaft when it is removed from the crankcase assembly.
26. Remove crankshaft (33) from the crankcase assembly. 27. Remove bolts (34). Remove cover (35). Remove two O-ring seals from the crankcase assembly. 28. Remove O-ring seal (37) from the cover.29. Remove thrust bearing (36). 30. Remove bearing (38) from the cover.Assemble Air Compressor
1. Check all parts for damage or wear. If necessary, make a replacement with a new part.2. Make sure all parts are clean and free of dirt and foreign material. 3. Use tool (A) and a press to install the bearing in cover (1). 4. Install O-ring seal (3) on the cover.5. Install thrust bearing (2). 6. Install O-ring seals (4) in the crankcase assembly.7. Put a small amount of SAE 30 oil on the O-ring seal and install the cover on crankcase assembly (5). Tighten the bolts to a torque of 25 to 35 lb.ft. (35 to 45 N m). 8. Put crankshaft (6) in position in the crankcase assembly.

Have questions with 101402-7090?





Group cross 101402-7090 ZEXEL

Isuzu 

 
8971612100 
INJECTION-PUMP ASSEMBLY
4BG1
9 400 613 946 
8971612101 
INJECTION-PUMP ASSEMBLY
4BG1
9 400 610 475 
8971620190 
INJECTION-PUMP ASSEMBLY
4BG1
9 400 610 476 
8971619770 
INJECTION-PUMP ASSEMBLY
4BG1
 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

9 400 613 947 
8971619771 
INJECTION-PUMP ASSEMBLY
4BG1
9 400 610 477 
8971619780 
INJECTION-PUMP ASSEMBLY
4BG1
9 400 610 478 
8971660730 
INJECTION-PUMP ASSEMBLY
4BG1
9 400 610 479 
8971660740 
INJECTION-PUMP ASSEMBLY
4BG1-T
9 400 610 480 
8971660720 
INJECTION-PUMP ASSEMBLY
4BG1-T
 
8971660760 
INJECTION-PUMP ASSEMBLY
4BG1-T
 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

 
8971660761 
INJECTION-PUMP ASSEMBLY
4BG1-T
9 400 613 948 
8971660762 
INJECTION-PUMP ASSEMBLY
4BG1-T
9 400 610 481 
8971638500 
INJECTION-PUMP ASSEMBLY
4BG1
101402-7090  

101402-7091 
 
8971660770 
INJECTION-PUMP ASSEMBLY
4BG1
 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

9 400 613 949 
8971660771 
INJECTION-PUMP ASSEMBLY
4BG1
Back to top