101402-4990 ZEXEL 9 400 610 474 BOSCH INJECTION-PUMP ASSEMBLY 9400610474 1014024990 8971612090


 

Information injection-pump assembly

BOSCH 9 400 610 474 9400610474
ZEXEL 101402-4990 1014024990
ISUZU 8971612090 8971612090
101402-4990 INJECTION-PUMP ASSEMBLY
Rating:
60
Buy INJECTION-PUMP ASSEMBLY 101402-4990 zexel genuine, new aftermarket engine parts with delivery

Service parts 101402-4990 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101041-8590
3. GOVERNOR 105419-2330
4. SUPPLY PUMP 105220-6250
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE 156638-8621
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-6521
11. Nozzle and Holder 8-97030-285-1
12. Open Pre:MPa(Kqf/cm2) 14.7{150}
13. NOZZLE-HOLDER 105030-4361
14. NOZZLE 105015-3930
15. NOZZLE SET

Include in #1:

101402-4990 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 610 474 9400610474
ZEXEL 101402-4990 1014024990
ISUZU 8971612090 8971612090


Zexel num
Bosch num
Firm num
Name
101402-4990 
9 400 610 474 
8971612090  ISUZU
INJECTION-PUMP ASSEMBLY
4BG1 K 14BC INJECTION PUMP ASSY PE4A,5A, PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-4920
Overflow valve opening pressure kPa   127 107 147
Overflow valve opening pressure kgf/cm2   1.3 1.1 1.5
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-3-4-2
Pre-stroke mm   3.4 3.35 3.45
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   A
Rack position   9.3
Pump speed r/min   1050 1050 1050
Average injection quantity mm3/st.   85 83.9 86.1
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   6.3+-0.5
Pump speed r/min   440 440 440
Average injection quantity mm3/st.   8 6.6 9.4
Max. variation between cylinders %   0 -14 14
Fixing the rack   *
Injection quantity adjustment_03
Adjusting point   D
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   100 100 110
Fixing the lever   *
Rack limit   *

Test data Ex:

Governor adjustment

Test data 101402-4990
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05 (3)RACK LIMIT (4)Set idle sub-spring (5)Main spring setting
----------
K=12
----------

Speed control lever angle

Test data 101402-4990
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=8deg+-5deg b=22deg+-5deg

Stop lever angle

Test data 101402-4990
N:Pump normal S:Stop the pump.
----------

----------
a=4.5deg+-5deg b=53deg+-5deg

Timing setting

Test data 101402-4990
(1)Pump vertical direction (2)Position of gear mark 'CC' at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=14deg
----------
a=(100deg)




Information:

Charging System
5P300 Electrical Tester. Make reference to Special Instruction Form No. GEG02276, and to the instructions inside of the cover of the tester, when testing with the 5P300 Electrical Tester.The condition of charge in the battery at each regular inspection will show if the charging system operates correctly. An adjustment is necessary when the battery is constantly in a low condition of charge or a large amount of water is needed (more than one ounce of water per cell per week or per every 50 service hours).Make a test of the charging unit and voltage regulator on the engine, when possible, using wiring and components that are a permanent part of the system. Off-engine (bench) testing will give a test of the charging unit and voltage regulator operation. This testing will give an indication of needed repair. After repairs are made, again make a test to give proof that the units are repaired to their original condition of operation.Before the start of on-engine testing, the charging system and battery must be checked as shown in the Steps that follow:1. Battery must be at least 75% (1.240 Sp. Gr.) fully charged and held tightly in place. The battery holder must not put too much stress on the battery.2. Cables between the battery, starter and engine ground must be the correct size. Wires and cables must be free of corrosion and have cable support clamps to prevent stress on battery connections (terminals).3. Leads, junctions, switches and panel instruments that have direct relation to the charging circuit must give correct circuit control.4. Inspect the drive components for the charging unit to be sure they are free of grease and oil and have the ability to operate the charging unit.Alternator Regulator Adjustment
When an alternator is charging the battery too much or not enough, an adjustment can be made to the charging rate of the alternator.To make an adjustment to the voltage output on these alternators, remove the voltage adjustment cap (1) from the alternator, turn the cap 90°, and install it again into the alternator. The voltage adjustment cap has four positions: HI, LO, and two positions between the high and the low setting.
ALTERNATOR REGULATOR ADJUSTMENT
1. Voltage adjustment cap.Delco-Remy Alternator; Pulley Nut Tightening
Tighten nut that holds the pulley to a torque of 75 5 lb. ft. (100 7 N m) with the tools shown.
ALTERNATOR PULLEY INSTALLATION
1. 8S1588 Adapter (1/2" female to 3/8" male). 2. 8S1590 Socket (5/16" with 3/8" drive). 3. 1P2977 Tool Group. 8H8555 Socket (15/16" with 1/2" drive) not shown.Starting System
5P300 Electrical Tester. Make reference to Special Instruction Form No. GEG02276, and to the instructions inside of the cover of the tester, when the 5P300 Electrical Tester is used.Use a D.C. Voltmeter to find starting system components which do not function.Move the start control switch to activate the starter solenoid. Starter solenoid operation can be heard as the pinion of the starter motor is engaged with the ring gear on the engine flywheel.If the solenoid for the starter

Have questions with 101402-4990?





Group cross 101402-4990 ZEXEL

Isuzu 

 
8971385850 
INJECTION-PUMP ASSEMBLY
4BD1
9 400 613 943 
8971385870 
INJECTION-PUMP ASSEMBLY
4BD1
9 400 611 173 
8971385990 
INJECTION-PUMP ASSEMBLY
4BD1
 
8971447050 
INJECTION-PUMP ASSEMBLY
4BG1-T
9 400 610 470 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

9 400 613 944 
8971447051 
INJECTION-PUMP ASSEMBLY
4BG1-T
9 400 610 471 
8971459140 
INJECTION-PUMP ASSEMBLY
4BD1
9 400 610 472 
8971470050 
INJECTION-PUMP ASSEMBLY
4BG1-T
 
8971483480 
INJECTION-PUMP ASSEMBLY
4BG1-T
9 400 610 473 
8971483481 
INJECTION-PUMP ASSEMBLY
4BG1-T
 
8971605830 
INJECTION-PUMP ASSEMBLY
4BG1-T
9 400 611 655 
8971605831 
INJECTION-PUMP ASSEMBLY
4BG1-T
 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

9 400 613 945 
8971605820 
INJECTION-PUMP ASSEMBLY
4BG1-T
101402-4990  
9 400 610 474 
8971612090 
INJECTION-PUMP ASSEMBLY
4BG1
Back to top