101402-4720 ZEXEL 9 400 613 929 BOSCH INJECTION-PUMP ASSEMBLY 9400613929 1014024720 8971385740


 

Information injection-pump assembly

BOSCH 9 400 613 929 9400613929
ZEXEL 101402-4720 1014024720
ISUZU 8971385740 8971385740
101402-4720 INJECTION-PUMP ASSEMBLY
Rating:
28
Buy INJECTION-PUMP ASSEMBLY 101402-4720 zexel genuine, new aftermarket engine parts with delivery

Service parts 101402-4720 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101041-8030
3. GOVERNOR 105410-8301
4. SUPPLY PUMP 105220-7380
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE 156639-2420
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-5762
11. Nozzle and Holder 1-15300-120-2
12. Open Pre:MPa(Kqf/cm2) 18.1{185}
13. NOZZLE-HOLDER 105031-3862
14. NOZZLE 105015-4190
15. NOZZLE SET

Include in #1:

101402-4720 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
101402-4720 
9 400 613 929 
8971385740  ISUZU
INJECTION-PUMP ASSEMBLY
4BD1-PTA K 14BC INJECTION PUMP ASSY PE4A,5A, PE




Information:

2. Remove the turbocharger outlet pipe (1) and elbow from the aftercooler and turbocharger as a unit. Cover the openings to keep dirt and foreign material out of the engine.3. Remove breather tube (2) from the engine.4. Disconnect tube assembly (3) from the aftercooler. 5. Remove vent tube (4) from the engine.6. Remove cover (5) from the aftercooler and remove the two O-ring seals from the cover.7. Loosen the clamps on hose (7) and remove tube assembly (6) from the hose and aftercooler. Remove the O-ring seal from the tube assembly. 8. Remove collar (10) and the gasket. Remove the O-ring seal from the collar.9. Remove bolts (9) and remove cover (8). 10. Remove elbow (12) and the gaskets from the engine. Remove aftercooler core assembly (11). Remove the O-ring seals from the core assembly. 11. Remove bolts (13), housing (14) and the gasket from the cylinder head.Install Aftercooler
1. Put the gasket and housing (1) in position on the cylinder head and install the bolts that hold it. 2. Install the gaskets, adapter and elbow (3).3. Put the O-ring seals on core assembly (2) and install core assembly (2) and the gaskets in the housing. 4. Put the O-ring seal on collar (5) and install the gasket and collar in the housing.5. Put the gasket and cover (4) in position on the housing and install the bolts that hold it. 6. Put the O-ring seals on cover (6) and install the gasket and cover. Install vent tube (7).7. Install the O-ring seal on tube assembly (8) and install the gasket and tube assembly (8). 8. Connect tube assembly (11) to the aftercooler housing.9. Install breather tube (10).10. Put the O-ring seals on pipe (9) and install the pipe, elbow and gasket.11. Fill the cooling system with coolant to the correct level.

Have questions with 101402-4720?





Group cross 101402-4720 ZEXEL

Isuzu 

9 400 613 927 
8971385720 
INJECTION-PUMP ASSEMBLY
4BD1PTA
9 400 613 928 
8971385730 
INJECTION-PUMP ASSEMBLY
4BD1-PTY
101402-4720  
9 400 613 929 
8971385740 
INJECTION-PUMP ASSEMBLY
4BD1-PTA
9 400 610 467 
8971385750 
INJECTION-PUMP ASSEMBLY
4BD1PTA
9 400 613 930 
8971395360 
INJECTION-PUMP ASSEMBLY
4BD1PTA
9 400 613 041 
8971385760 
INJECTION-PUMP ASSEMBLY
4BD1PTA
9 400 610 468 
8971385780 
INJECTION-PUMP ASSEMBLY
4BD1
9 400 610 469 
8971395350 
INJECTION-PUMP ASSEMBLY
4BD1
9 400 613 931 
8971384630 
INJECTION-PUMP ASSEMBLY
4BD1
9 400 613 932 
8971384640 
INJECTION-PUMP ASSEMBLY
4BD1
Back to top