101402-4440 ZEXEL 9 400 610 462 BOSCH INJECTION-PUMP ASSEMBLY 9400610462 1014024440 8971332270


 

Information injection-pump assembly

BOSCH 9 400 610 462 9400610462
ZEXEL 101402-4440 1014024440
ISUZU 8971332270 8971332270
101402-4440 INJECTION-PUMP ASSEMBLY
Rating:
19
Buy INJECTION-PUMP ASSEMBLY 101402-4440 zexel genuine, new aftermarket engine parts with delivery

Service parts 101402-4440 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101041-8311
3. GOVERNOR 105419-1960
4. SUPPLY PUMP 105220-6260
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE 156638-8621
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-6521
11. Nozzle and Holder 8-97030-285-1
12. Open Pre:MPa(Kqf/cm2) 14.7{150}
13. NOZZLE-HOLDER 105030-4361
14. NOZZLE 105015-3930
15. NOZZLE SET

Include in #1:

101402-4440 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 610 462 9400610462
ZEXEL 101402-4440 1014024440
ISUZU 8971332270 8971332270


Zexel num
Bosch num
Firm num
Name
101402-4440 
9 400 610 462 
8971332270  ISUZU
INJECTION-PUMP ASSEMBLY
4BG1-T K 14BC INJECTION PUMP ASSY PE4A,5A, PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-4920
Overflow valve opening pressure kPa   127 107 147
Overflow valve opening pressure kgf/cm2   1.3 1.1 1.5
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-3-4-2
Pre-stroke mm   3.4 3.35 3.45
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   A
Rack position   9.1
Pump speed r/min   1200 1200 1200
Average injection quantity mm3/st.   86.5 85.4 87.6
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   6+-0.5
Pump speed r/min   475 475 475
Average injection quantity mm3/st.   9 7.6 10.4
Max. variation between cylinders %   0 -14 14
Fixing the rack   *
Injection quantity adjustment_03
Adjusting point   D
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   130 125 135
Fixing the lever   *
Rack limit   *

Test data Ex:

Governor adjustment

Test data 101402-4440
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT (4)Set idle sub-spring (5)Main spring setting
----------
K=6
----------

Speed control lever angle

Test data 101402-4440
F:Full speed I:Idle D:Dead point S:Stop
----------

----------
a=(29deg)+-5deg b=(13deg)+-5deg c=(22deg)+-5deg d=(13deg)+-3deg

Stop lever angle

Test data 101402-4440
N:Pump normal S:Stop the pump.
----------

----------
a=6deg+-5deg b=46deg+-5deg

0000001501 LEVER

Test data 101402-4440
1. Variable lever adjustment (1)Fix lever B in the idle position using the bolts C and D. (2)Temporarily fix lever A in center of long hole. (3)Set the dead point position temporarily and measure the lever angle. (4)After idle adjustment, loosen the full side stopper bolt D. (5)Move lever A in full speed direction. (6)Fix the bolt D at the full speed position. (7)Fix lever A using bolt E. (8)(G) Lock using bolt. (9)Finally, measure the lever angle and set the idle stopper bolt (C) stop position.
----------

----------

Timing setting

Test data 101402-4440
(1)Pump vertical direction (2)Position of gear mark 'CC' at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=14deg
----------
a=(100deg)




Information:

start by: a) remove fuel injection pump housing and governor1. Put the fuel injection pump housing on tool (A). 2. Remove bolts (1). 3. Remove bolt (2). Remove adapter housing (3) from the pump housing. 4. Remove bolts (4) and (5). Loosen bolt (6). 5. Remove governor housing (7) from the pump housing. 6. Remove spring (12), wave washer (11) and guide (10). Remove seat (8) and over fueling spring (9). 7. Pull shaft (13) up and remove it. Remove lever (14) from the housing. 8. Remove riser (follower) (17) from the shaft. Remove ring (15) and lever (16). 9. Remove cover (18) with tool (B). Tool (B) can cause damage to the cover. Always inspect the cover and install a new cover if needed.10. Install the timing pin to prevent the camshaft from turning. 11. Remove three bolts (19) that hold the flyweight assembly to the camshaft. Remove the flyweight assembly from the pump housing.12. Remove the timing pin.Connection Of Governor To Fuel Injection Pump Housing
1. Put the fuel injection pump housing on tool (A).2. Install the timing pin to prevent the camshaft from turning. 3. Put flyweight assembly (1) in position on the camshaft.
Be sure pin (2) that holds the shaft is in the correct position on back of the flyweight assembly.
4. Install new bolts for the flyweight assembly. The bolts for the flyweight assembly have a locking material on the threads and must not be used more than one time. 5. Install the cover over the flyweight assembly with tool (B). 6. Grind a taper on the bottom edge of a 1/8" screwdriver (3). Install the screwdriver through the bolt hole in the governor housing. The screwdriver must fit evenly against the flyweight assembly cover. Make a mark (stake) in four places around the cover in line with the groove in the camshaft.
Never install a used flyweight cover that is bent.
7. Install lever (4) on the dowel. Install ring (5). 8. Put riser (follower) (6) in position between the flyweights. Lift the flyweight up with a piece of wire and push the riser (follower) forward. 9. Put lever (10) in position. Lever (10) will be in the correct position when the lever end is in the groove of riser (follower) (6) and the ball end is engaged in sleeve shaft lever (9).
If lever (10) is not installed correctly, the governor can not operate and can cause the engine to over speed.
10. Install O-ring (7). Install shaft (8) to hold lever (10) in place. 11. Install over fueling spring (12) and seat (11) on the shaft. 12. Install guide (13), (wave) washer (14) and spring (15) in the governor housing.13. Put the governor housing on the fuel injection pump housing and install the bolts.end by: a) install adapter housing and leversb) install fuel injection pump housing and governorc) make adjustment of fuel system setting (See Fuel System Setting in Testing and Adjusting)

Have questions with 101402-4440?





Group cross 101402-4440 ZEXEL

Isuzu 

9 400 610 458 
8971302790 
INJECTION-PUMP ASSEMBLY
4BD1PTA
9 400 610 459 
8971302770 
INJECTION-PUMP ASSEMBLY
4BG1-T
 
8971332280 
INJECTION-PUMP ASSEMBLY
4BG1-T
9 400 610 460 
8971332281 
INJECTION-PUMP ASSEMBLY
4BG1-T
9 400 610 461 
8971332310 
INJECTION-PUMP ASSEMBLY
4BG1-T
101402-4440  
9 400 610 462 
8971332270 
INJECTION-PUMP ASSEMBLY
4BG1-T
 
8971379250 
INJECTION-PUMP ASSEMBLY
4BG1-T
9 400 610 463 
8971379251 
INJECTION-PUMP ASSEMBLY
4BG1-T
9 400 611 243 
8971384580 
INJECTION-PUMP ASSEMBLY
4BD1
9 400 611 677 
8971384260 
INJECTION-PUMP ASSEMBLY
4BD1
9 400 612 935 
8971384670 
INJECTION-PUMP ASSEMBLY
4BD1
9 400 613 913 
8971384680 
INJECTION-PUMP ASSEMBLY
4BD1
Back to top