101402-4210 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1014024210 8970486830


 

Information injection-pump assembly

ZEXEL 101402-4210 1014024210
ISUZU 8970486830 8970486830
101402-4210 INJECTION-PUMP ASSEMBLY
Rating:
64
Buy INJECTION-PUMP ASSEMBLY 101402-4210 zexel genuine, new aftermarket engine parts with delivery

Service parts 101402-4210 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101040-8990
3. GOVERNOR 105419-0561
4. SUPPLY PUMP 105220-4932
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE 156637-2721
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-6521
11. Nozzle and Holder 8-97030-285-1
12. Open Pre:MPa(Kqf/cm2) 14.7{150}
13. NOZZLE-HOLDER 105030-4361
14. NOZZLE 105015-3930
15. NOZZLE SET

Include in #1:

101402-4210 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 101402-4210 1014024210
ISUZU 8970486830 8970486830


Zexel num
Bosch num
Firm num
Name
101402-4210 
101402-4211 
 
8970486830  ISUZU
INJECTION-PUMP ASSEMBLY
4BD1 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-4920
Overflow valve opening pressure kPa   127 107 147
Overflow valve opening pressure kgf/cm2   1.3 1.1 1.5
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-3-4-2
Pre-stroke mm   3.6 3.55 3.65
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   A
Rack position   9.6
Pump speed r/min   1050 1050 1050
Average injection quantity mm3/st.   59.1 58 60.2
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   -
Rack position   7.5+-0.5
Pump speed r/min   440 440 440
Average injection quantity mm3/st.   10 8.6 11.4
Max. variation between cylinders %   0 -14 14
Fixing the rack   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 

Test data Ex:

Governor adjustment

Test data 101402-4210
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Set idle sub-spring (3)Main spring setting
----------
K=8
----------

Speed control lever angle

Test data 101402-4210
F:Full speed I:Idle D:Dead point S:Stop
----------

----------
a=(18deg)+-5deg b=(14deg)+-5deg c=(18deg)+-5deg d=13deg+-3deg

Stop lever angle

Test data 101402-4210
N:Pump normal S:Stop the pump.
----------

----------
a=6deg+-5deg b=46deg+-5deg

0000001501 LEVER

Test data 101402-4210
1. Variable lever adjustment (1)Fix lever B in the idle position using the bolts C and D. (2)Temporarily fix lever A in center of long hole. (3)Set the dead point position temporarily and measure the lever angle. (4)After idle adjustment, loosen the full side stopper bolt D. (5)Move lever A in full speed direction. (6)Fix the bolt D at the full speed position. (7)Fix lever A using bolt E. (8)(G) Lock using bolt. (9)Finally, measure the lever angle and set the idle stopper bolt (C) stop position.
----------

----------

Timing setting

Test data 101402-4210
(1)Pump vertical direction (2)Position of gear mark 'CC' at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=16deg
----------
a=(90deg)




Information:

1. Remove five bolts (1) that hold oil lines bracket and supports to the engine.2. Remove three bolts (2) that hold oil pump to the engine.3. Remove the oil pump with the lines as a unit from under the engine. 4. Remove oil lines (3) from the oil pump.Install Oil Pump (Brakesaver)
1. Put clean SAE 30 engine oil on the O-ring seals. Connect the oil lines in the oil pump. Install the bolt and washer that holds the line in the pump.2. Put the oil pump and the oil lines as a unit in position under the engine.3. Install the three bolts that hold the pump to the engine. Make sure the oil pump gear is engaged with crankshaft gear.4. Install the five bolts that hold the oil lines bracket and support to the engine.end by:a) install oil panDisassemble Oil Pump (Brakesaver)
start by:a) remove oil pump1. Remove bolt and washer that hold gear on the shaft. 2. Use tooling (A) to remove drive gear (1) from shaft. Remove the key from shaft. Put marks on the pump bodies so they can be assembled in the correct position.3. Remove retainer (3) for bypass valve. Remove spring and bypass valve. 4. Remove bolts (4) that hold pump body (2) to the main pump body. Remove the pump body (2).5. Use tooling (B) to remove the bearings from pump body (2). 6. Remove the gears (7). Put marks on the gears so they can be assembled in the same position.7. Remove the spacer (6) from the main oil pump body (5). Use tooling (C) to remove the bearings from spacer (6).8. Remove the gears from main pump body (5). 9. Use tooling (C) to remove the bearings from the main pump body.Assemble Oil Pump (Brakesaver)
1. Use tooling (A) to install the bearings (2) until they are even with the outside surface of the main pump body (1). Install the bearings (2) so the junctions in the bearings are 30° 15° from the center of the bearing bores and toward the oil pump outlet passage as shown. 2. Use tooling (A) to install the bearings (3) in the spacer. Install the bearings until they are in position an equal distance in from each side of the spacer. Install the bearings with the oil holes in the bearings in alignment with the oil holes in the spacer and the junctions in the bearings in alignment with the cavity in the spacer as shown. 3. Put clean engine oil on all gears and bearings before they are assembled in the oil pump. Install the idler and drive gears (5) in the main pump body.4. Install the spacer (4) on the gear shafts with the smaller cavity out and the oil holes in the spacer toward the pump outlet passage as shown. 5. Use tooling (B) to install the bearings (6) in the pump body (7) until they are .060 .010 in. (1.52 0.25 mm) from the inside edge of the bearing

Have questions with 101402-4210?





Group cross 101402-4210 ZEXEL

F 019 Z10 574 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

 
8970486851 
INJECTION-PUMP ASSEMBLY
4BD1-T
9 400 613 899 
8970486852 
INJECTION-PUMP ASSEMBLY
4BD1-T
101402-4210  

101402-4211 
 
8970486830 
INJECTION-PUMP ASSEMBLY
4BD1
9 400 613 900 
8970486831 
INJECTION-PUMP ASSEMBLY
4BD1
F 019 Z10 476 
8970497810 
INJECTION-PUMP ASSEMBLY
4BD1
 
8970497811 
INJECTION-PUMP ASSEMBLY
4BD1
9 400 613 901 
8970497812 
INJECTION-PUMP ASSEMBLY
4BD1
 
8970703440 
INJECTION-PUMP ASSEMBLY
4BD1TPD
 
8970703441 
INJECTION-PUMP ASSEMBLY
4BD1TPD
9 400 612 407 
8970703442 
INJECTION-PUMP ASSEMBLY
4BD1TPD
9 400 613 902 
8970734770 
INJECTION-PUMP ASSEMBLY
4BD1PTA
F 019 Z10 477 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

 
8970781570 
INJECTION-PUMP ASSEMBLY
4BD1
9 400 613 903 
8971261920 
INJECTION-PUMP ASSEMBLY
4BD1
9 400 613 904 
8970816450 
INJECTION-PUMP ASSEMBLY
4BD1PTA
9 400 613 905 
8970845550 
INJECTION-PUMP ASSEMBLY
4BD1-PTY
9 400 613 906 
8970845560 
INJECTION-PUMP ASSEMBLY
4BD1-PTY
9 400 613 907 
8970870930 
INJECTION-PUMP ASSEMBLY
4BD1-PTA
Back to top