101402-4200 ZEXEL F 019 Z10 574 BOSCH INJECTION-PUMP ASSEMBLY f019z10574 1014024200


 

Information injection-pump assembly

BOSCH F 019 Z10 574 f019z10574
ZEXEL 101402-4200 1014024200
101402-4200 INJECTION-PUMP ASSEMBLY
Rating:
61
Buy INJECTION-PUMP ASSEMBLY 101402-4200 zexel genuine, new aftermarket engine parts with delivery

Service parts 101402-4200 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101040-8872
3. GOVERNOR 105419-0860
4. SUPPLY PUMP 105220-5940
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE 156637-1521
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-6541
11. Nozzle and Holder 8-97013-319-1
12. Open Pre:MPa(Kqf/cm2) 18.1(185)
13. NOZZLE-HOLDER 105030-4361
14. NOZZLE 105015-4190
15. NOZZLE SET

Include in #1:

101402-4200 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH F 019 Z10 574 f019z10574
ZEXEL 101402-4200 1014024200


Zexel num
Bosch num
Firm num
Name
101402-4200 
101402-4201 
F 019 Z10 574 
   
INJECTION-PUMP ASSEMBLY
* K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-4920
Overflow valve opening pressure kPa   127 107 147
Overflow valve opening pressure kgf/cm2   1.3 1.1 1.5
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-3-4-2
Pre-stroke mm   3.4 3.35 3.45
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   A
Rack position   9.4
Pump speed r/min   1150 1150 1150
Average injection quantity mm3/st.   71.3 70.2 72.4
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   -
Rack position   6.6+-0.5
Pump speed r/min   475 475 475
Average injection quantity mm3/st.   8.8 7.4 10.2
Max. variation between cylinders %   0 -14 14
Fixing the rack   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 

Test data Ex:

Governor adjustment

Test data 101402-4200
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Set idle sub-spring (3)Main spring setting (4)Rack difference between N = N1 and N = N2
----------
K=13 N1=1150r/min N2=800r/min
----------

Speed control lever angle

Test data 101402-4200
F:Full speed I:Idle D:Dead point S:Stop
----------

----------
a=(18deg)+-5deg b=(16deg)+-5deg c=(16deg)+-5deg d=13deg+-3deg

Stop lever angle

Test data 101402-4200
N:Pump normal S:Stop the pump.
----------

----------
a=6deg+-5deg b=46deg+-5deg

0000001501 LEVER

Test data 101402-4200
1. Variable lever adjustment (1)Fix lever B in the idle position using the bolts C and D. (2)Temporarily fix lever A in center of long hole. (3)Set the dead point position temporarily and measure the lever angle. (4)After idle adjustment, loosen the full side stopper bolt D. (5)Move lever A in full speed direction. (6)Fix the bolt D at the full speed position. (7)Fix lever A using bolt E. (8)(G) Lock using bolt. (9)Finally, measure the lever angle and set the idle stopper bolt (C) stop position.
----------

----------

Timing setting

Test data 101402-4200
(1)Pump vertical direction (2)Position of gear mark 'CC' at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=18deg
----------
a=(90deg)




Information:

start by:a) remove timing gear coverb) remove valve lifters1. Remove the turbocharger drain tube from the flywheel housing. 2. Remove two studs (1) from the flywheel housing. 3. Turn the engine with tool (B). Remove the four bolts from rear camshaft gear (2).
Tooling (A) must be used to prevent the loss of timing of the rear balance weight gear and to keep the rear camshaft gear in place when the camshaft is removed.
4. Install tooling (A) in the flywheel housing. Turn the engine until bolts (3) of tooling (A) engage in the bolt hole of the gear. The two bolts in the rear camshaft gear keep correct timing with the rear balance weight gear.5. Evenly tighten the two bolts (3) to free the gear from the camshaft. 6. Remove two bolts (4) and the thrust plate from front of the engine and camshaft. If necessary, use a driver and hammer to give more impact load on the camshaft gear as follows:a) Loosen tooling (A) to release pressure from the rear camshaft and gear.b) Remove the thrust plate from the front engine block and camshaft.c) Evenly tighten tooling (A) again.d) Use the driver and hammer to free the rear gear from the camshaft taper. 7. Remove camshaft (5) from the front of the engine block.
Be careful not to cause damage to the camshaft bearings.
Install Camshaft
1. Put clean SAE 30 engine oil on the lobes and journals of the camshaft. 2. Install camshaft (1) in the cylinder block with front camshaft gear "V" mark (3) in alignment with the idler and balance weight gear "V" mark. 3. Install thrust plate (2) and the bolts to the front of the engine that hold the camshaft in position. 4. Loosen bolts (5) of tooling (A) from the rear camshaft gear (4) to make alignment of camshaft dowel with the dowel hole in the gear. Install the gear on the camshaft. 5. Install one bolt (6) to hold the gear to the camshaft. Remove tooling (A) from the camshaft gear and flywheel housing.6. Turn the engine with tool (B) and install the remainder of the bolts that hold the gear to the camshaft. Tighten the bolts to a torque of 20 3 lb.ft. (25 4 N m).7. Install the two studs and the turbocharger drain tube to the flywheel housing.end by:a) install valve liftersb) install timing gear cover

Have questions with 101402-4200?





Group cross 101402-4200 ZEXEL

101402-4200  

101402-4201 
F 019 Z10 574 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

 
8970486851 
INJECTION-PUMP ASSEMBLY
4BD1-T
9 400 613 899 
8970486852 
INJECTION-PUMP ASSEMBLY
4BD1-T
 
8970486830 
INJECTION-PUMP ASSEMBLY
4BD1
9 400 613 900 
8970486831 
INJECTION-PUMP ASSEMBLY
4BD1
F 019 Z10 476 
8970497810 
INJECTION-PUMP ASSEMBLY
4BD1
 
8970497811 
INJECTION-PUMP ASSEMBLY
4BD1
9 400 613 901 
8970497812 
INJECTION-PUMP ASSEMBLY
4BD1
 
8970703440 
INJECTION-PUMP ASSEMBLY
4BD1TPD
 
8970703441 
INJECTION-PUMP ASSEMBLY
4BD1TPD
9 400 612 407 
8970703442 
INJECTION-PUMP ASSEMBLY
4BD1TPD
9 400 613 902 
8970734770 
INJECTION-PUMP ASSEMBLY
4BD1PTA
F 019 Z10 477 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

 
8970781570 
INJECTION-PUMP ASSEMBLY
4BD1
9 400 613 903 
8971261920 
INJECTION-PUMP ASSEMBLY
4BD1
9 400 613 904 
8970816450 
INJECTION-PUMP ASSEMBLY
4BD1PTA
9 400 613 905 
8970845550 
INJECTION-PUMP ASSEMBLY
4BD1-PTY
9 400 613 906 
8970845560 
INJECTION-PUMP ASSEMBLY
4BD1-PTY
9 400 613 907 
8970870930 
INJECTION-PUMP ASSEMBLY
4BD1-PTA
Back to top