101402-4154 ZEXEL 9 400 613 895 BOSCH INJECTION-PUMP ASSEMBLY 9400613895 1014024154 8970314863


 

Information injection-pump assembly

BOSCH 9 400 613 895 9400613895
ZEXEL 101402-4154 1014024154
ISUZU 8970314863 8970314863
101402-4154 INJECTION-PUMP ASSEMBLY
Rating:
53
Buy INJECTION-PUMP ASSEMBLY 101402-4154 zexel genuine, new aftermarket engine parts with delivery

Service parts 101402-4154 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101040-8881
3. GOVERNOR 105419-0771
4. SUPPLY PUMP 105220-7300
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE 156637-1521
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-6541
11. Nozzle and Holder 8-97013-319-1
12. Open Pre:MPa(Kqf/cm2) 18.1{185}
13. NOZZLE-HOLDER 105030-4361
14. NOZZLE 105015-4190
15. NOZZLE SET

Include in #1:

101402-4154 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 613 895 9400613895
ZEXEL 101402-4154 1014024154
ISUZU 8970314863 8970314863


Zexel num
Bosch num
Firm num
Name
101402-4154 
101402-4650 
9 400 613 895 
8970314863  ISUZU
INJECTION-PUMP ASSEMBLY
4BD1-T * K 14BC PE4A,5A, PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-4920
Overflow valve opening pressure kPa   127 107 147
Overflow valve opening pressure kgf/cm2   1.3 1.1 1.5
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-3-4-2
Pre-stroke mm   3.4 3.35 3.45
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   A
Rack position   9.7
Pump speed r/min   1250 1250 1250
Average injection quantity mm3/st.   88.5 87.4 89.6
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   10.4
Pump speed r/min   500 500 500
Average injection quantity mm3/st.   86 84 88
Max. variation between cylinders %   0 -4 4
Fixing the lever   *
Injection quantity adjustment_03
Adjusting point   -
Rack position   6.6+-0.5
Pump speed r/min   440 440 440
Average injection quantity mm3/st.   8.8 7.4 10.2
Max. variation between cylinders %   0 -14 14
Fixing the rack   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 

Test data Ex:

Governor adjustment

Test data 101402-4154
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)Main spring setting (4)Set idle sub-spring
----------
K=9
----------

Speed control lever angle

Test data 101402-4154
F:Full speed I:Idle S:Stop D:Dead point
----------

----------
a=(26deg)+-5deg b=(17deg)+-5deg c=(18deg)+-5deg d=13deg+-3deg

Stop lever angle

Test data 101402-4154
N:Pump normal S:Stop the pump.
----------

----------
a=6deg+-5deg b=46deg+-5deg

0000001501 LEVER

Test data 101402-4154
1. Variable lever adjustment (1)Fix lever B in the idle position using the bolts C and D. (2)Temporarily fix lever A in center of long hole. (3)Set the dead point position temporarily and measure the lever angle. (4)After idle adjustment, loosen the full side stopper bolt D. (5)Move lever A in full speed direction. (6)Fix the bolt D at the full speed position. (7)Fix lever A using bolt E. (8)(G) Lock using bolt. (9)Finally, measure the lever angle and set the idle stopper bolt (C) stop position.
----------

----------

Timing setting

Test data 101402-4154
(1)Pump vertical direction (2)Position of gear mark 'CC' at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=18deg
----------
a=(90deg)




Information:

start by:a) remove automatic timing advanceb) remove vibration damper and pulleyc) remove water pumpd) remove belt tightener idler pulleye) remove water temperature regulator (left cylinder head)1. Remove the tube assembly from the oil cooler elbow to the oil pan.2. Loosen the bolts that hold the oil pan to the cylinder block approximately 1/4" (6.4 mm). Remove the bolts that hold the oil pan to the timing gear cover.3. Fasten a hoist to the engine and lift it off tool (A). Weight of the engine is 3200 lb. (1452 kg). Make a separation of the oil pan from the cylinder block and timing gear cover. Do not damage the pan gasket.4. Put 1/4" (6.4 mm) pieces of bar stock between the pan and cylinder block at the positions the oil pan makes contact with tool (A). Lower the engine on tool (A).5. Remove the bolts from the belt tightener bracket. Remove the block and gasket. 6. Remove fumes disposal tube (1).7. Remove the bolts (4) that hold the timing gear cover to the cylinder block.8. Remove water bonnet (2).9. Remove timing gear cover (3).
Do not cause damage to the crankshaft front seal when the cover is removed.
10. Check the condition of the O-ring seal on the fuel injection pump housing.Install Timing Gear Cover
1. Put clean engine oil on the O-ring seal for the fuel injection pump housing, the crankshaft front seal and wear sleeve.2. Install tool (B) in the crankshaft front seal.3. Install a new gasket on the timing gear cover. Put timing gear cover (1) in position on the dowels in the cylinder block. Make sure it is against the cylinder block all around.4. Install the bolts that hold the cover in position. Remove tool (B) from the crankshaft front seal.5. Install the water bonnet, the fumes disposal tube and the block for the belt tightener bracket.6. Fasten a hoist to the engine and lift it off tool (A). Remove the bar stock from between the cylinder block and oil pan. Tighten the bolts that hold the oil pan to the cylinder block.7. Install the bolts that hold the oil pan to the timing gear cover. Put the engine back on tool (A).8. Install the tube assembly between the oil pan and oil cooler.end by:a) install water temperature regulator (left cylinder head)b) install belt tightener idler pulleyc) install water pumpd) install vibration damper and pulleye) install automatic timing advance

Have questions with 101402-4154?





Group cross 101402-4154 ZEXEL

Isuzu 

F 019 Z10 324 
8970314860 
INJECTION-PUMP ASSEMBLY
4BD1-T
F 019 Z10 325 
8970314861 
INJECTION-PUMP ASSEMBLY
4BD1-T
F 019 Z10 326 
8970314862 
INJECTION-PUMP ASSEMBLY
4BD1-T
F 019 Z10 327 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

101402-4154  

101402-4650 
9 400 613 895 
8970314863 
INJECTION-PUMP ASSEMBLY
4BD1-T
Back to top