101402-2380 ZEXEL 9 400 612 449 BOSCH INJECTION-PUMP ASSEMBLY 9400612449 1014022380 220206270a


 

Information injection-pump assembly

BOSCH 9 400 612 449 9400612449
ZEXEL 101402-2380 1014022380
HINO 220206270A 220206270a
101402-2380 INJECTION-PUMP ASSEMBLY
Rating:
38
Buy INJECTION-PUMP ASSEMBLY 101402-2380 zexel genuine, new aftermarket engine parts with delivery

Service parts 101402-2380 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101041-9640
3. GOVERNOR 105401-1280
4. SUPPLY PUMP 105220-6740
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE 156637-9520
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105110-5310
11. Nozzle and Holder 23600-3520A
12. Open Pre:MPa(Kqf/cm2) 21.6{220}
13. NOZZLE-HOLDER 105041-5160
14. NOZZLE 105025-3790
15. NOZZLE SET

Include in #1:

101402-2380 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 612 449 9400612449
ZEXEL 101402-2380 1014022380
HINO 220206270A 220206270a


Zexel num
Bosch num
Firm num
Name
101402-2380 
101402-2381 
9 400 612 449 
220206270A  HINO
INJECTION-PUMP ASSEMBLY
W04D-T * K 14BD PE4AD PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-5720
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   255 255 255
Tester oil delivery pressure kgf/cm2   2.6 2.6 2.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-3-4-2
Pre-stroke mm   4.8 4.75 4.85
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   A
Rack position   8.8
Pump speed r/min   900 900 900
Average injection quantity mm3/st.   77 75 79
Max. variation between cylinders %   0 -3 3
Basic   *
Fixing the rack   *
Boost pressure kPa   32 32
Boost pressure mmHg   240 240
Injection quantity adjustment_02
Adjusting point   -
Rack position   6.7+-0.5
Pump speed r/min   485 485 485
Average injection quantity mm3/st.   9 7.5 10.5
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 
Injection quantity adjustment_03
Adjusting point   E
Rack position   10.7++
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   100 100 110
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Rack limit   *
Boost compensator adjustment
Pump speed r/min   600 600 600
Rack position   R1-0.5
Boost pressure kPa   6.7 4 9.4
Boost pressure mmHg   50 30 70
Boost compensator adjustment_02
Pump speed r/min   600 600 600
Rack position   R1(9.4)
Boost pressure kPa   20 14.7 25.3
Boost pressure mmHg   150 110 190

Test data Ex:

Governor adjustment

Test data 101402-2380
N:Pump speed R:Rack position (mm) (1)Notch fixed: K (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT (4)Boost compensator stroke (5)Rack difference between N = N1 and N = N2 (6)Idle sub spring setting: L1.
----------
K=13 N1=750r/min N2=350r/min L1=5+-0.2mm
----------

Speed control lever angle

Test data 101402-2380
F:Full speed I:Idle (1)Set the pump speed at aa (2)Use the hole at R = bb (3)When speed is set at cc. (4)Stopper bolt setting
----------
aa=900r/min bb=100mm cc=750r/min
----------
a=(5deg)+-5deg b=(6deg)+-5deg c=(16deg)+-5deg

Stop lever angle

Test data 101402-2380
N:Pump normal S:Stop the pump. (1)Pump speed aa and rack position bb (to be sealed at delivery) (2)Normal stop (3)Stopper bolt setting (4)Use the hole above R = cc (5)Stopper bolt setting
----------
aa=0r/min bb=1-0.5mm cc=25mm
----------
a=13deg+-5deg b=50deg+-5deg

Timing setting

Test data 101402-2380
(1)Pump vertical direction (2)Position of gear's standard threaded hole at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(70deg)




Information:

Illustration 21 shows the direction the rack moves when the fuel injector is receiving fuel.
Illustration 22 g01455811
Illustration 1 - Flowchart for the Air in Fuel Test (Test F)
Illustration 23 g01455812
Illustration 2 - Flowchart for the Air in Fuel Test (Test F)Fuel Injector Cranking Test (Test G)
Note: The fuel injector cranking test checks for worn out injectors by measuring the cranking rack.
Illustration 24 g01412134
(3) The rack control (4) The number one fuel injectorNote: Refer to Illustration 24 for the location of the rack control and the location of the number one injector.
Illustration 25 g01412115
Flowchart for the Fuel Injector Cranking Test (Test G)Fuel Shutoff Solenoid Test (Test H)
Note: The fuel shutoff solenoid test determines if the fuel shutoff solenoid and wiring harness are operating properly.
Illustration 26 g01412143
Flowchart for the Fuel Shutoff Solenoid Test (Test H)Fuel Ratio Control (FRC) Setting Test (Test I)
Note: The FRC setting test checks the FRC setting.
Illustration 27 g01412145
Flowchart for the Fuel Ratio Control (FRC) Setting Test (Test I)Governor Servo Retaining Ring Test (Test J)
Note: Do not run the engine during this test.Note: The governor servo retaining ring test checks for faulty internal parts of the governor.
Illustration 28 g01422811
(1) Paddle
Illustration 29 g01422821
(2) Clevis pin
Illustration 30 g01412147
Flowchart for the Governor Servo Retaining Ring Test (Test J)Fuel Transfer Pump Test (Test K)
Note: The fuel transfer pump test is a visual inspection of the fuel transfer pump components.
Illustration 31 g01412150
(1) Screen (2) Inlet check valve (3) Spring (4) Bolt (5) Piston (6) Outlet check valve (7) Freeze plug (8) Piston check valve (9) Passage (10) Tappet Assembly (11) CamNote: Refer to Illustration 31 for the location of the components for the fuel transfer pump.
Illustration 32 g01412149
Flowchart for the Fuel Transfer Pump Test (Test K)Fuel Ratio Control (FRC) Diaphragm Leak Test (Test L)
Note: The FRC diaphragm leak test checks for a leaking FRC diaphragm.
Illustration 33 g01412154
Flowchart for the Fuel Ratio Control (FRC) Diaphragm Leak Test (Test L)

Have questions with 101402-2380?





Group cross 101402-2380 ZEXEL

Hino 

101402-2380  

101402-2381 
9 400 612 449 
220206270A 
INJECTION-PUMP ASSEMBLY
W04D-T
F 019 Z10 934 
220206270B 
INJECTION-PUMP ASSEMBLY
W04D-T
F 019 Z10 793 
220206520A 
INJECTION-PUMP ASSEMBLY
W04D-T
F 019 Z20 415 
220206520B 
INJECTION-PUMP ASSEMBLY
W04D-T
 
22010E0580 
INJECTION-PUMP ASSEMBLY
W04D-T
Back to top