101402-1004 ZEXEL 9 400 613 844 BOSCH INJECTION-PUMP ASSEMBLY 9400613844 1014021004 me080749


 

Information injection-pump assembly

BOSCH 9 400 613 844 9400613844
ZEXEL 101402-1004 1014021004
MITSUBISHI ME080749 me080749
101402-1004 INJECTION-PUMP ASSEMBLY
Rating:
38
Buy INJECTION-PUMP ASSEMBLY 101402-1004 zexel genuine, new aftermarket engine parts with delivery

Service parts 101402-1004 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101040-9930
3. GOVERNOR 105402-2680
4. SUPPLY PUMP 105220-5130
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE 156638-7320
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105118-5830
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 17.7(180)
13. NOZZLE-HOLDER 105048-3501
14. NOZZLE 105017-1000
15. NOZZLE SET

Include in #1:

101402-1004 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 613 844 9400613844
ZEXEL 101402-1004 1014021004
MITSUBISHI ME080749 me080749


Zexel num
Bosch num
Firm num
Name
101402-1004 
9 400 613 844 
ME080749  MITSUBISHI
INJECTION-PUMP ASSEMBLY
4D34T K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-6220
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-3-4-2
Pre-stroke mm   3.5 3.45 3.55
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   A
Rack position   10.4
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   73.5 72.5 74.5
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   -
Rack position   7.7+-0.5
Pump speed r/min   375 375 375
Average injection quantity mm3/st.   8 6.7 9.3
Max. variation between cylinders %   0 -14 14
Fixing the rack   *
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
 
Injection quantity adjustment_03
Adjusting point   C
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   130 130 135
Fixing the lever   *
Rack limit   *

Test data Ex:

Governor adjustment

Test data 101402-1004
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)Torque spring does not operate. (4)RACK LIMIT (5)Main spring setting (6)Set idle sub-spring
----------
K=19
----------

Speed control lever angle

Test data 101402-1004
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=15deg+-5deg b=25deg+-5deg

Stop lever angle

Test data 101402-1004
N:Pump normal S:Stop the pump. (1)No return spring
----------

----------
a=27deg+-5deg b=53deg+-5deg

Timing setting

Test data 101402-1004
(1)Pump vertical direction (2)Position of gear mark '3' at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=12deg
----------
a=(130deg)




Information:


Parts Required For 4C-8180 Timing Tool Group
Refer to Chart A for item identification.Assemble and Set the 4C-8180 Timing Tool Group
1. Obtain a 108-2104 Plunger and Barrel Assembly. This part can be new or used. If the part is used, make sure it is in good working condition. The plunger should move freely in the barrel.
4C-8181 Timing Tool Assembly
(9) 8J-3819 Spring. (10) 1N-3257 Retainer Ring. (11) Plunger and barrel from 108-2104 Plunger and Barrel Assembly. (12) 4C-8178 Indicator Mount Bonnet. (14) 4C-8179 Bonnet Nut. (16) 2W-3429 Gear Segment (part of 108-2104). (17) 8N-0669 Bolt (part of 108-2104). (18) 4P-8704 Spring (part of 108-2104). (19) 9Y-2088 Washer.2. Make a 4C-8181 Timing Tool Assembly out of the 108-2104 Plunger and Barrel Assembly. The 4C-8181 Timing Tool Assembly is not a serviceable part. a. Remove and discard 8N-0669 Bolt (17), 2W-3429 Gear Segment (16), and 4P-8704 Spring (18) from the 108-2104 Plunger and Barrel Assembly.b. Assemble 8J-3819 Spring (9) and 9Y-2088 Washer (19) onto plunger. The 9Y-2088 Washer is part of the 108-2104 Plunger and Barrel Assembly.c. Install the 4C-8178 Indicator Mount Bonnet (12) onto the barrel using a 1N-3257 Retainer Ring (10).d. Slip 4C-8179 Bonnet Nut (14) over indicator mount bonnet (12).e. This tool is now a 4C-8181 Timing Tool Assembly (11).3. Assemble knurled gauge collar (3) onto gauge (5) by threading them together. Hand tighten the two parts. Make sure the gauging surfaces are clean and free of all debris, nicks, etc.4. Install 4C-8181 Timing Tool Assembly (11) into gauge collar (3).5. Thread bonnet nut (14) into gauge collar (3) and hand tighten with 9U-5120 Spanner Wrench (13). This will secure timing tool assembly (11) into gauge collar (3).6. Spring (9) on the timing tool assembly should make the end of the plunger extend approximately 30 mm (1.2 in) past the end of gauge (5).7. Push on the end of the plunger and make sure it travels freely (under spring force) in and out of the gauge block bore. If there is binding, disassemble and correct the problem.8. Install either a 5P-4814 Collet (6) or 4C-2982 Collet Assembly (7) into indicator mount bonnet (12).9. Install an indicator with a 5P-7262 Contact Point into collet (6 or 7). Use either a 6V-6106 Dial Indicator or an 8T-1002 Probe connected to an 8T-1001 Electronic Position Indicator.
Do not over tighten collet (6 or 7) holding the indicator. Over-tightening can result in damage to the indicator or the electronic position indicator probe.
10. Tighten collet (6 or 7) just enough to make sure the indicator or electronic position indicator probe will not move in collet.11. Zero the indicator by following this procedure. a. Place the 4C-8183 Gauge Plate (8) onto a flat surface.b. Carefully hold the entire 4C-8180 Timing Tool Group and place it on the gauge plate, with the end of the plunger contacting the plate.c. Push down on the entire assembly, compressing the spring, until the bottom of gauge (5) is in complete contact with gauge plate (8).
Zero The Timing Tool Assembly With

Have questions with 101402-1004?





Group cross 101402-1004 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

101402-1004  
9 400 613 844 
ME080749 
INJECTION-PUMP ASSEMBLY
4D34T
Back to top