101402-0902 ZEXEL 9 400 613 837 BOSCH INJECTION-PUMP ASSEMBLY 9400613837 1014020902 8943128951


 

Information injection-pump assembly

BOSCH 9 400 613 837 9400613837
ZEXEL 101402-0902 1014020902
ISUZU 8943128951 8943128951
101402-0902 INJECTION-PUMP ASSEMBLY
Rating:
18
Buy INJECTION-PUMP ASSEMBLY 101402-0902 zexel genuine, new aftermarket engine parts with delivery

Service parts 101402-0902 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101040-8541
3. GOVERNOR 105410-9441
4. SUPPLY PUMP 105210-4820
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE 156635-5321
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-5792
11. Nozzle and Holder 8-94130-074-3
12. Open Pre:MPa(Kqf/cm2) 14.7{150}
13. NOZZLE-HOLDER 105030-3391
14. NOZZLE 105015-4740
15. NOZZLE SET

Include in #1:

101402-0902 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
101402-0902 
9 400 613 837 
8943128951  ISUZU
INJECTION-PUMP ASSEMBLY
4BD1 * K 14BC PE4A,5A, PE




Information:

General Instructions
These instructions are a review of many items which a serviceman encounters in servicing and maintaining a truck engine.PROBLEM ANALYZING: In analyzing a system malfunction, use this systematic procedure to locate and correct the problem.1. Determine problem.2. List possible causes.3. Devise checks.4. Conduct checks in logical order to determine cause.5. Consider remaining service life against cost of parts and labor.6. Make necessary repair.7. Recheck.SAFETY: Your safety and that of others is always the number one consideration when servicing or maintaining trucks and truck engines. Safety is a matter of thoroughly understanding the job to be done and the application of good common sense. It is not just a matter of "do's" and "don'ts".CLEANLINESS: The most important single item in assuring long engine life is to keep dirt out of vital working parts. Precautions have been taken to safeguard against this. Enclosed compartments, seals and filters have been provided to keep the supply of air, fuel, coolant and lubricants clean. It is important that these safeguards be maintained.Whenever fuel, lubricating oil, coolant lines or air lines are disconnected, clean the point of disconnection as well as the adjacent area. As soon as the disconnection is made, cap, plug or tape the line or opening to prevent entry of foreign material. The same recommendations for cleaning and covering apply when access covers or inspection plates are removed.Clean and inspect all parts. Be sure all passages and holes are open. Cover all parts to keep them clean. Be sure parts are clean when they are installed. Leave new parts in their containers until ready for assembly.REMOVAL AND INSTALLATION: Use a hoist to remove heavy components. Engine removal should be accomplished by using an adjustable lifting beam. All supporting members (chains and cables) should be parallel to each other and as near perpendicular as possible to the top of the object being lifted. When it is necessary to remove a component on an angle, remember that the capacity of an eyebolt diminishes as the angle between the supporting members and the object becomes less than 90°. Eyebolts and brackets should never be bent and should only have stress in tension.Some removals require the use of lifting fixtures to obtain proper balance and to provide safe handling.If a part resists removal, check to be certain all nuts and bolts have been removed and that an adjacent part is not interfering.DISASSEMBLY AND ASSEMBLY: When servicing or repairing the engine, complete each step in turn. Do not partially assemble one part and start assembling some other part. Make all adjustments as recommended. Always check the job after it is completed to see nothing has been overlooked.BOLTS AND BOLT TORQUE: Use bolts of the correct length. A bolt which is too long may "bottom" before the head is tight against the part it is to hold and cause failure. The threads in the assembly can also become damaged when a "long" bolt is used.If a bolt is too short, there may not be enough threads

Have questions with 101402-0902?





Group cross 101402-0902 ZEXEL

Isuzu 

 
8943128950 
INJECTION-PUMP ASSEMBLY
4BD1
101402-0902  
9 400 613 837 
8943128951 
INJECTION-PUMP ASSEMBLY
4BD1
 
8943128930 
INJECTION-PUMP ASSEMBLY
4BD1T
9 400 613 838 
8943128931 
INJECTION-PUMP ASSEMBLY
4BD1-T
 
8944533640 
INJECTION-PUMP ASSEMBLY
4BD1T
 
8943649500 
INJECTION-PUMP ASSEMBLY
4BD1PTV
 
8943162250 
INJECTION-PUMP ASSEMBLY
4BD1
9 400 613 839 
8943162251 
INJECTION-PUMP ASSEMBLY
4BD1
 
8943162260 
INJECTION-PUMP ASSEMBLY
4BD1PTY
 
8943162261 
INJECTION-PUMP ASSEMBLY
4BD1PTY
9 400 610 170 
8943169460 
INJECTION-PUMP ASSEMBLY
4BD1PTA
9 400 613 840 
8943270570 
INJECTION-PUMP ASSEMBLY
4BD1
 
8943310910 
INJECTION-PUMP ASSEMBLY
4BD1
9 400 613 841 
8943310911 
INJECTION-PUMP ASSEMBLY
4BD1
9 400 619 642 
8943251110 
INJECTION-PUMP ASSEMBLY
4BD1
9 400 613 842 
8943251111 
INJECTION-PUMP ASSEMBLY
4BD1
9 400 613 843 
8943390700 
INJECTION-PUMP ASSEMBLY
4BD1
Back to top