Information injection-pump assembly
ZEXEL
101401-9220
1014019220

Rating:
Service parts 101401-9220 INJECTION-PUMP ASSEMBLY:
1.
_
6.
COUPLING PLATE
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
TM01 13 H50
12.
Open Pre:MPa(Kqf/cm2)
19.6{200}
15.
NOZZLE SET
Cross reference number
ZEXEL
101401-9220
1014019220
Zexel num
Bosch num
Firm num
Name
101401-9220
INJECTION-PUMP ASSEMBLY
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 6-2-600
Outer diameter - inner diameter - length (mm) mm 6-2-600
Overflow valve
131424-3420
Overflow valve opening pressure
kPa
255
221
289
Overflow valve opening pressure
kgf/cm2
2.6
2.25
2.95
Tester oil delivery pressure
kPa
157
157
157
Tester oil delivery pressure
kgf/cm2
1.6
1.6
1.6
Direction of rotation (viewed from drive side)
Right R
Right R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right R
Right R
Injection order
1-3-4-2
Pre-stroke
mm
3.2
3.15
3.25
Beginning of injection position
Drive side NO.1
Drive side NO.1
Difference between angles 1
Cal 1-3 deg. 90 89.5 90.5
Cal 1-3 deg. 90 89.5 90.5
Difference between angles 2
Cal 1-4 deg. 180 179.5 180.5
Cal 1-4 deg. 180 179.5 180.5
Difference between angles 3
Cyl.1-2 deg. 270 269.5 270.5
Cyl.1-2 deg. 270 269.5 270.5
Injection quantity adjustment
Adjusting point
-
Rack position
12.3
Pump speed
r/min
800
800
800
Average injection quantity
mm3/st.
68.5
68
69
Max. variation between cylinders
%
0
-2.5
2.5
Basic
*
Fixing the rack
*
Standard for adjustment of the maximum variation between cylinders
*
Injection quantity adjustment_02
Adjusting point
H
Rack position
9.5+-0.5
Pump speed
r/min
325
325
325
Average injection quantity
mm3/st.
9.7
7.7
11.7
Max. variation between cylinders
%
0
-14
14
Fixing the rack
*
Standard for adjustment of the maximum variation between cylinders
*
Injection quantity adjustment_03
Adjusting point
A
Rack position
R1(12.3)
Pump speed
r/min
800
800
800
Average injection quantity
mm3/st.
68.5
68
69
Basic
*
Fixing the lever
*
Injection quantity adjustment_04
Adjusting point
B
Rack position
R1+0.5
Pump speed
r/min
1500
1500
1500
Average injection quantity
mm3/st.
90.9
86.9
94.9
Fixing the lever
*
Injection quantity adjustment_05
Adjusting point
C
Rack position
R1+0.25
Pump speed
r/min
600
600
600
Average injection quantity
mm3/st.
62.4
58.4
66.4
Fixing the lever
*
Timer adjustment
Pump speed
r/min
920
Advance angle
deg.
0.5
Timer adjustment_02
Pump speed
r/min
-
Advance angle
deg.
1.5
1
2
Remarks
Measure the actual speed.
Measure the actual speed.
Timer adjustment_03
Pump speed
r/min
-
Advance angle
deg.
1.5
1
2
Remarks
Measure the actual speed.
Measure the actual speed.
Timer adjustment_04
Pump speed
r/min
1500
Advance angle
deg.
5.5
5
6
Remarks
Finish
Finish
Test data Ex:
Governor adjustment

N:Pump speed
R:Rack position (mm)
(1)Torque cam stamping: T1
(2)Tolerance for racks not indicated: +-0.05mm.
----------
T1=H68
----------
----------
T1=H68
----------
Speed control lever angle

F:Full speed
I:Idle
(1)Use the hole at R = aa
(2)Stopper bolt set position 'H'
----------
aa=36mm
----------
a=20deg+-5deg b=(34deg)+-3deg
----------
aa=36mm
----------
a=20deg+-5deg b=(34deg)+-3deg
Stop lever angle

N:Pump normal
S:Stop the pump.
(1)Use the hole at R = aa
(2)Set the stop adjuster screw
----------
aa=39mm
----------
a=14deg+-5deg b=(24deg)+-5deg
----------
aa=39mm
----------
a=14deg+-5deg b=(24deg)+-5deg
0000001501 LEVER

CL:Center line of camshaft
ST:Stop adjuster screw
f1:Direction for pulling the speed lever
f2:Direction for pulling the stop lever
1. Stop lever adjustment outline
(1)After completing all adjustments, confirm that the lever angle is within the specifications in the normal position.
(2)Set the speed lever in the full speed position.
(3)At pump speed Na, position the rack at non-injection position Ra.
(4)Set the stop adjusting screw to fix the speed lever in the idling position.
(5)Confirm that there is no injection at pump speed Nb.
----------
Na=1550r/min Nb=325r/min Ra=7.2-0.5mm
----------
----------
Na=1550r/min Nb=325r/min Ra=7.2-0.5mm
----------
Timing setting

(1)Pump vertical direction
(2)Position of gear mark 'CC' at No 1 cylinder's beginning of injection
(3)B.T.D.C.: aa
(4)-
----------
aa=9deg
----------
a=(130deg)
----------
aa=9deg
----------
a=(130deg)
Information:
(1) Remove former fuel injection lines (1), the clamps and through-the-cover fuel line adapters (2) from the engine; these parts will not be needed again. Install 8M4437 Seals on twelve 1W6777 Adapters (3). Put engine oil on the seals and install the adapters in valve cover base assemblies (4) where adapters (2) were removed. Fasten the adapters to bases (4) with two 5N5365 Locks on each and the former nuts. Connect former fuel lines (5) to adapters (3) and the former fuel nozzle adapters. (2) Install a 2W2500 Washer (7) and a 6V6579 Seal (8) on each adapter (3). Install a 5P9267 Seal on each injector pump; put diesel fuel on the seals before installation. Loosely install fuel injection line assemblies: number "6" (9), number "12" (10), number "4" (11), number "2" (12), number "10" (13) and number "8" (14) on the right side of the engine between the fuel injection pumps and adapters (3). See the above chart for the correct part number of the fuel lines. Remove two bolts and install 5N5370 Bracket (15) and 5N5374 Clamp (16) where the bolts were removed. Fasten the fuel injection lines to bracket (15) with two 5N5369 Dampers, a 5N5371 Clamp and two 2W7884 Bolt Assemblies. Fasten the fuel injection lines to clamp (16) with two 5N5373 Dampers, a 5N5372 Clamp and two 2W7884 Bolts. Use 5N5957 and 5N5958 Clamps, two 5N5956 Dampers and a 2W7884 Bolt Assembly to fasten the fuel lines together at (A). Use 5N5376 and 5N5377 Clamps, two 5N5375 Dampers and three 2W7884 Bolt Assemblies to fasten the fuel lines together at (B). Tighten the bolt assemblies to 10 N m (7 lb.ft.) torque. Tighten nuts (17) on each end of the fuel injection lines to 40 7 N m (35 5 lb.ft.) torque, then tighten nuts (18).(3) Loosely install fuel injection line assemblies; number "11" (19), number "3" (20), number "7" (21), number "9" (22), number "5" (23) and number "1" (24) on the left side of the engine between adapters (3) and the fuel injection pump as shown. Remove a bolt and install 5N5370 Bracket (25) where the bolt was removed. Fasten the fuel lines to bracket (25) with two 5N5369 Dampers, a 5N5371 Clamp and two 2W7884 Bolts. On engines equipped with aftercooler, fasten 5N5379 Plate (26) to an existing bolt on the aftercooler. Fasten the fuel injection lines to plate (26) with two 5N5378 Dampers, a 5N5374 Clamp and two 2W7884 Bolt Assemblies. Use two 5N5376 and 5N5377 Clamps, four 5N5375 Dampers and four 2W7884 Bolt Assemblies to fasten the fuel lines together at locations (C). If the engine does not have an aftercooler, use 5N5957 and 5N5958 Clamps, two 5N5956 Dampers and a 2W7884 Bolt Assembly to fasten the fuel injection lines together at (D). Tighten the fuel lines as shown in step 2.2W5100 Fuel Lines Drain Group
(1) Install a 9L8496 Tee (1) in each adapter (2). Connect tees (1) together with ten 5N5940 Tube Assemblies (3).
(1) Install a 9L8496 Tee (1) in each adapter (2). Connect tees (1) together with ten 5N5940 Tube Assemblies (3).
Have questions with 101401-9220?
Group cross 101401-9220 ZEXEL
Mazda
Mazda
Mazda
Mazda
101401-9220
INJECTION-PUMP ASSEMBLY