Information injection-pump assembly
BOSCH
9 400 611 413
9400611413
ZEXEL
101401-9040
1014019040
MITSUBISHI-HEAV
33F6500100
33f6500100

Rating:
Service parts 101401-9040 INJECTION-PUMP ASSEMBLY:
1.
_
6.
COUPLING PLATE
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
33F6101010
12.
Open Pre:MPa(Kqf/cm2)
21.6{220}
15.
NOZZLE SET
Cross reference number
BOSCH
9 400 611 413
9400611413
ZEXEL
101401-9040
1014019040
MITSUBISHI-HEAV
33F6500100
33f6500100
Zexel num
Bosch num
Firm num
Name
9 400 611 413
33F6500100 MITSUBISHI-HEAV
INJECTION-PUMP ASSEMBLY
S4M3-F * K 14BD PE4AD PE
S4M3-F * K 14BD PE4AD PE
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967}
1404 Test oil ISO4113 or {SAEJ967}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 6-2-600
Outer diameter - inner diameter - length (mm) mm 6-2-600
Overflow valve
131424-3720
Overflow valve opening pressure
kPa
255
221
289
Overflow valve opening pressure
kgf/cm2
2.6
2.25
2.95
Tester oil delivery pressure
kPa
157
157
157
Tester oil delivery pressure
kgf/cm2
1.6
1.6
1.6
Direction of rotation (viewed from drive side)
Left L
Left L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left L
Left L
Injection order
1-3-4-2
Pre-stroke
mm
4.5
4.45
4.55
Beginning of injection position
Governor side NO.1
Governor side NO.1
Difference between angles 1
Cal 1-3 deg. 90 89.5 90.5
Cal 1-3 deg. 90 89.5 90.5
Difference between angles 2
Cal 1-4 deg. 180 179.5 180.5
Cal 1-4 deg. 180 179.5 180.5
Difference between angles 3
Cyl.1-2 deg. 270 269.5 270.5
Cyl.1-2 deg. 270 269.5 270.5
Injection quantity adjustment
Adjusting point
A
Rack position
12.4
Pump speed
r/min
1400
1400
1400
Average injection quantity
mm3/st.
104.5
103
106
Max. variation between cylinders
%
0
-2.5
2.5
Basic
*
Fixing the lever
*
Injection quantity adjustment_02
Adjusting point
B
Rack position
7+-0.5
Pump speed
r/min
250
250
250
Average injection quantity
mm3/st.
11.5
10
13
Max. variation between cylinders
%
0
-15
15
Fixing the rack
*
Injection quantity adjustment_03
Adjusting point
C
Rack position
-
Pump speed
r/min
100
100
100
Average injection quantity
mm3/st.
143
143
153
Fixing the lever
*
Rack limit
*
Timer adjustment
Pump speed
r/min
800--
Advance angle
deg.
0
0
0
Remarks
Start
Start
Timer adjustment_02
Pump speed
r/min
750
Advance angle
deg.
0.5
Timer adjustment_03
Pump speed
r/min
1200
Advance angle
deg.
2.5
2
3
Remarks
Finish
Finish
Test data Ex:
Governor adjustment

N:Pump speed
R:Rack position (mm)
(1)Target notch: K
(2)Tolerance for racks not indicated: +-0.05mm.
(3)RACK LIMIT
----------
K=10
----------
----------
K=10
----------
Speed control lever angle

F:Full speed
I:Idle
(1)Stopper bolt setting
----------
----------
a=14deg+-5deg b=28deg+-5deg
----------
----------
a=14deg+-5deg b=28deg+-5deg
Stop lever angle

N:Pump normal
S:Stop the pump.
(1)Normal
----------
----------
a=43deg+-5deg b=53deg+-5deg
----------
----------
a=43deg+-5deg b=53deg+-5deg
Timing setting

(1)Pump vertical direction
(2)Position of gear mark '2' at No 1 cylinder's beginning of injection
(3)B.T.D.C.: aa
(4)-
----------
aa=19deg
----------
a=(90deg)
----------
aa=19deg
----------
a=(90deg)
Information:
(1) Cylinder head bolts and nuts tightening procedure:1. Put engine oil on the threads of bolts and nuts. Tighten all bolts and nuts in number sequence to a torque of ... 45 N m (35 lb ft)2. Tighten all bolts and nuts in number sequence to a torque of ... 95 N m (70 lb ft)3. Again tighten all bolts and nuts in number sequence to a final torque of ... 135 N m (100 lb ft).Retighten the cylinder head bolts and nuts after the engine has run under partial load for approximately thirty minutes. The rocker shaft assembly has to be removed and valve lash adjusted again.a. If the bolts and nuts move before the correct final torque is reached, retighten everything in the sequence again to the final torque of 135 N m (100 lb ft).b. If the bolts and nuts do not move before the correct final torque is reached, back each one off 30 to 60° (with an 8T3052 Degree Wheel) and retighten again, in the sequence shown, to the final torque. After all the bolts and nuts are retightened, check the first 10 positions to make sure they are tightened to the correct torque.c. After 25 to 50 hours of service for a new or rebuilt engine, retorque the cylinder head bolts as shown in Step a above and adjust the valves again.New cylinder blocks have been introduced on the 4.236 engine. The new cylinder blocks have deeper cylinder head bolt holes and longer bolts. The old and new sizes are shown. The change became effective at engine serial number LD----U027631M and up. See General Information in Systems Operation for the engine serial number location. The new cylinder head bolts are not interchangeable between old and new bolts.(2) Torque for nuts that hold injectors ... 19 N m (14 lb ft)Replace the copper washer and rubber seal between the head and the injector every time the injector is removed. See Fuel Injector Installation in Testing And Adjusting.(3) Torque for fuel line nuts ... 20 N m (15 lb ft)(4) Torque for nuts that hold rocker shaft to head ... 75 N m (54 lb ft)(5) Valve lash [clearance (cold)], between rocker arm and valve: Intake ... 0.30 mm (0.012 in)Exhaust ... 0.30 mm (0.012 in)(6) Maximum permissible nozzle projection below cylinder head face after resurfacing ... 4.44 mm (0.175 in) Resurfacing allowance (maximum) ... 0.30 mm (0.012 in)(7) Depth of cylinder head (new) ... 103.188 0.38 mm (4.0625 0.015 in) Minimum depth of cylinder head (after resurfacing) ... 102.502 mm (4.0355 in)Maximum permissible amount of bow (curve of cylinder head):Across width (transverse) ... 0.09 mm (0.003 in)Across length (longitudinal) ... 0.15 mm (0.006 in)(See Cylinder Head Check in Testing And Adjusting)