101401-7185 ZEXEL 9 400 611 935 BOSCH INJECTION-PUMP ASSEMBLY 9400611935 1014017185 8971467711


 

Information injection-pump assembly

BOSCH 9 400 611 935 9400611935
ZEXEL 101401-7185 1014017185
ISUZU 8971467711 8971467711
101401-7185 INJECTION-PUMP ASSEMBLY
Rating:
31
Buy INJECTION-PUMP ASSEMBLY 101401-7185 zexel genuine, new aftermarket engine parts with delivery

Service parts 101401-7185 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101041-8470
3. GOVERNOR 105932-1712
4. SUPPLY PUMP 105210-6100
5. AUTOM. ADVANCE MECHANIS 105676-5121
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105118-6051
11. Nozzle and Holder 8-97119-812-0
12. Open Pre:MPa(Kqf/cm2) 18.1{185}
13. NOZZLE-HOLDER 105048-3673
14. NOZZLE 105017-1860
15. NOZZLE SET

Include in #1:

101401-7185 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 611 935 9400611935
ZEXEL 101401-7185 1014017185
ISUZU 8971467711 8971467711


Zexel num
Bosch num
Firm num
Name
101401-7185 
9 400 611 935 
8971467711  ISUZU
INJECTION-PUMP ASSEMBLY
4HF1 K 14BC INJECTION PUMP ASSY PE4A,5A, PE
101401-7185 
9 400 611 935 
1670089TE5  NISSAN
INJECTION-PUMP ASSEMBLY
4HF1 K 14BC INJECTION PUMP ASSY PE4A,5A, PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-4920
Overflow valve opening pressure kPa   127 107 147
Overflow valve opening pressure kgf/cm2   1.3 1.1 1.5
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-3-4-2
Pre-stroke mm   4.1 4.05 4.15
Rack position
Point E
  R=E
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   -
Rack position   11.9
Pump speed r/min   1310 1310 1310
Average injection quantity mm3/st.   64.5 62.9 66.1
Max. variation between cylinders %   0 -4 4
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   H'
Rack position   9.7+-0.5
Pump speed r/min   310 310 310
Average injection quantity mm3/st.   15.5 14.2 16.8
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   H
Rack position   9.5+-0.5
Pump speed r/min   325 325 325
Average injection quantity mm3/st.   12.5 11.2 13.8
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   A
Rack position   R1(11.9)
Pump speed r/min   1310 1310 1310
Average injection quantity mm3/st.   64.5 63.5 65.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   B
Rack position   R1
Pump speed r/min   1600 1600 1600
Average injection quantity mm3/st.   67.5 63.5 71.5
Fixing the lever   *
Injection quantity adjustment_06
Adjusting point   C
Rack position   R1-0.5
Pump speed r/min   500 500 500
Average injection quantity mm3/st.   44.7 40.7 48.7
Fixing the lever   *
Injection quantity adjustment_07
Adjusting point   E
Rack position   R1-0.05
Pump speed r/min   960 960 960
Average injection quantity mm3/st.   58.5 54.5 62.5
Fixing the lever   *
Timer adjustment
Pump speed r/min   -
Advance angle deg.   0 0 0
Remarks
Measure speed (beginning of operation).
 
Timer adjustment_02
Pump speed r/min   -
Advance angle deg.   5 4.5 5.5
Remarks
Measure the actual speed, stop
 

Test data Ex:

Governor adjustment

Test data 101401-7185
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm.
----------
T1=L31
----------

Speed control lever angle

Test data 101401-7185
F:Full speed I:Idle (1)Set the stopper bolt (rack position = aa, speed = bb).
----------
aa=(9.5)mm bb=325r/min
----------
a=40deg+-5deg b=33deg+-3deg

Stop lever angle

Test data 101401-7185
N:Pump normal S:Stop the pump. (1)Use the hole at R = aa
----------
aa=64mm
----------
a=20deg+-5deg b=29deg+-5deg

0000001501 FICD

Test data 101401-7185
(A) applied negative pressure (B) Screw (c) Nut 1. Set the actuator as described below. (1)Confirm that there is clearance between the actuator lever and the speed lever. (2)Loosen the nut (C). (3)Push in the screw (B). (4)Apply P1 from the actuator (A) part. (5)Pull out the screw (B) slowly. (6)Tighten and fix the nut (C) when pump speed is Na and the rack position is Ra. (7)Torque the nut (C) to T1. (8)Apply P2 several times. (9)Confirm that the actuator functions normally. (10)Confirm that there is a clearance between the actuator lever and the speed lever at that time.
----------
P1=53.3kPa(400mmHg) P2=53.3kPa(400mmHg) Na=410r/min Ra=9.2+-0.1mm T1=1.2~1.6N-m(0.12~0.16kgf-m)
----------
L=(5)mm

0000001601 RACK SENSOR

Test data 101401-7185
Rack sensor adjustment 1. Flange type rack sensor (rack sensor adjustment -5*20) (1)These types of rack sensors do not need adjustment. Confirm the performance with the following procedures. (2)Mount the rack sensor main body to the pump main body. (3)Fix the pump lever at full. (4)At supply voltage V1, pump speed N1 and rack position Ra, confirm that the amp's output voltage is Vist. (5)Move the pump lever two or three times. (6)Set again to full. (7)Confirm that the amplifier output voltage is Vist. (8)Fix the caution plate to the upper part of the rack sensor. (For those without the caution plate instructions, make sure the nameplate of the rack sensor carries the "Don't hold here" caution.) (9)Apply red paint to the rack sensor mounting bolts (2 places).
----------
V1=5+-0.01V N1=960r/min Ra=R1(11.9)-0.05mm Vist=2.61+-0.28V
----------

Timing setting

Test data 101401-7185
(1)Pump vertical direction (2)Position of gear's standard threaded hole at No 1 cylinder's beginning of injection (3)Stamping position on the A/T outer rim (4)Pump bracket check hole position. (5)At the No 1 cylinder's beginning of injection, align with the projection seen through the bracket's check hole and mark the A/T's bevel C1. (6)B.T.D.C.: aa
----------
aa=7deg
----------
a=(60deg) b=(85deg)




Information:

33. Remove dowels (69) and flyweights (71) from the carrier.34. Remove shaft (70) from the carrier. Remove the dowel from shaft (70). 35. Remove races (72) and bearing (73) from the camshaft in the fuel injection pump housing.Assemble Governor
Put clean oil on all parts before assembly. Be sure all oil passages are clear. 1. Install one race (1), bearing (2) and the other race (1) on the camshaft in the fuel injection pump housing. 2. Put flyweights (3) in position on carrier (4) and install the dowels to hold the flyweights in place. The flyweights must move freely on the dowels and have 0.010 to 0.23 mm (0.0004 to 0.009 in. end play. 3. Install dowel (5) in governor shaft (6) and install the governor shaft in the carrier as shown. 4. Put the carrier in position on the camshaft and install the bolts that hold the carrier in place. Make a replacement of shield (7) any time it is removed.5. Install shield (7) on the carrier and use tool (A) to push the shield against its seat. Use a hammer and punch to move the metal (stake) two places on the side of the shield 180° 5° apart next to the holes in the shield. 6. Install one race (9), bearing (10), the other race (9) and use tool (B) to install the ring on riser (8) as shown. 7. Install riser (8) and spring (overfueling spring) on the governor shaft as shown. 8. Assemble the dashpot as follows:a) Install spring (12) on seat (11) and install seat (13) in spring (12).b) Put spool (14) and ring (15) in position on seat (13) and use tool (B) to install snap ring (16) to hold them in place. 9. Install dashpot assembly (17) on the governor shaft as shown. 10. Install ring (21) in the lower groove in the governor shaft. Install one sleeve (20), spring (19), the other sleeve (20) and bearing (18) on the governor shaft as shown. Spring (19) is used to put a preload on the thrust bearing on the camshaft in the fuel injection pump housing. 11. Use tool (C) to hold spring (19) in compression and install ring (22) in the groove in the governor shaft. Remove tool (C). 12. Put lever (27) in position on governor servo (23) and install pin (24) to hold the lever in place. Use a hammer and chisel to move the metal (stake) four places 90° apart on the outside surface on both legs of the governor servo to hold pin (24) in place.13. Install the O-ring seal on sleeve (25). Install piston (26) and sleeve (25) in the governor servo as shown. 14. Install valve (28) in the governor servo as shown. 15. Install one lockring (32) in the groove near the center of valve (28). Put sleeve (29), spring (broken link spring) (30) and seat (31) in position on valve (28) and install the other lockring (32) to hold them in place. 16.

Have questions with 101401-7185?





Group cross 101401-7185 ZEXEL

Isuzu 

 
8971366560 
INJECTION-PUMP ASSEMBLY
4HF1

Nissan 

 
1670089TC1 
INJECTION-PUMP ASSEMBLY
4HF1
F 01G 09U 009 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

F 01G 09U 00A 
8971467710 
INJECTION-PUMP ASSEMBLY
4HF1

Nissan 

 
1670089TD0 
INJECTION-PUMP ASSEMBLY
F 01G 09U 00B 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

101401-7185  
9 400 611 935 
8971467711 
INJECTION-PUMP ASSEMBLY
4HF1

Nissan 

101401-7185  
9 400 611 935 
1670089TE5 
INJECTION-PUMP ASSEMBLY
4HF1
Back to top