101401-7090 ZEXEL 9 400 610 406 BOSCH INJECTION-PUMP ASSEMBLY 9400610406 1014017090 8971223591


 

Information injection-pump assembly

BOSCH 9 400 610 406 9400610406
ZEXEL 101401-7090 1014017090
ISUZU 8971223591 8971223591
101401-7090 INJECTION-PUMP ASSEMBLY
Rating:
25
Buy INJECTION-PUMP ASSEMBLY 101401-7090 zexel genuine, new aftermarket engine parts with delivery

Service parts 101401-7090 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101041-8410
3. GOVERNOR 105932-0970
4. SUPPLY PUMP 105210-6100
5. AUTOM. ADVANCE MECHANIS 105676-5130
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105118-6081
11. Nozzle and Holder 8-97122-354-0
12. Open Pre:MPa(Kqf/cm2) 18.1{185}
13. NOZZLE-HOLDER 105048-3673
14. NOZZLE 105017-1890
15. NOZZLE SET

Include in #1:

101401-7090 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 610 406 9400610406
ZEXEL 101401-7090 1014017090
ISUZU 8971223591 8971223591


Zexel num
Bosch num
Firm num
Name
101401-7090 
101401-7091 
9 400 610 406 
8971223591  ISUZU
INJECTION-PUMP ASSEMBLY
A * K 14BC PE4A,5A, PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-4920
Overflow valve opening pressure kPa   127 107 147
Overflow valve opening pressure kgf/cm2   1.3 1.1 1.5
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-3-4-2
Pre-stroke mm   4.1 4.05 4.15
Rack position
Point A
  R=A
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   -
Rack position   12
Pump speed r/min   960 960 960
Average injection quantity mm3/st.   54 52.4 55.6
Max. variation between cylinders %   0 -4 4
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   H
Rack position   9.8+-0.5
Pump speed r/min   285 285 285
Average injection quantity mm3/st.   14 12.7 15.3
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(12)
Pump speed r/min   960 960 960
Average injection quantity mm3/st.   54 53 55
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1+0.1
Pump speed r/min   1600 1600 1600
Average injection quantity mm3/st.   65 61 69
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   C
Rack position   R1-0.2
Pump speed r/min   500 500 500
Average injection quantity mm3/st.   46.5 42.5 50.5
Fixing the lever   *
Timer adjustment
Pump speed r/min   1050--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   1000
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   1600
Advance angle deg.   5 4.5 5.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101401-7090
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm.
----------
T1=L48
----------

Speed control lever angle

Test data 101401-7090
F:Full speed I:Idle (1)Stopper bolt set position 'H' (2)-
----------

----------
a=41deg+-5deg b=(35deg)+-3deg

Stop lever angle

Test data 101401-7090
N:Pump normal S:Stop the pump. (1)Use the hole at R = aa
----------
aa=64mm
----------
a=20deg+-5deg b=29deg+-5deg

0000001501 ACS

Test data 101401-7090
(A) Housing (B) Snap ring (C) adjusting screw (D) Set screw (E): Push rod (F) Spacer 1. Adjustment of the aneroid compensator (1)Adjust with the (D) set screw so that the clearance between the (A) housing and (B) snap ring is L1. (2)Select the push rod (E) so that the distance from the end surface of the (F) spacer becomes L2. (3)(C) Turn the screw to adjust the beginning of aneroid compensator operation. 2. Adjustment when mounting the governor. (1)Set the speed of the pump to N1 r/min and fix the control lever at the full set position. (2)Adjust using screw C to obtain the performance shown in the graph above. (3)After final adjustment, confirm that the gap between housing (A) and snapring (B) is L3.
----------
N1=960r/min L1=1.4~1.7mm L2=0.5+-0.5mm L3=(0.1~0.5)mm
----------
Ra=R1(12)mm Rb=R1-0.4mm Pa=95.4+-5.3kPa(716+-40mmHg) Pb=70.1+-0.7kPa(526+-5mmHg) Q1=54+-1cm3/1000st Q2=(40)+-1.6cm3/1000st

Timing setting

Test data 101401-7090
(1)Pump vertical direction (2)Position of gear's standard threaded hole at No 1 cylinder's beginning of injection (3)Stamping position on the A/T outer rim (4)Pump bracket check hole position. (5)At the No 1 cylinder's beginning of injection, align with the projection seen through the bracket's check hole and mark the A/T's bevel C1. (6)B.T.D.C.: aa
----------
aa=8deg
----------
a=(60deg) b=(85deg)




Information:

Installation of Nozzles, Ether Supply Tubes and Connectors
1. If the machine does not already have an ether aid starting system, remove the plugs from turbocharger outlet adapters on the engine. 2. Install a 3B6768 Bushing with a 7X1078 Nozzle Assembly (2) where each plug was removed. If machine was equipped with an ether aid starting system. Discard old nozzles and install new nozzles.3. When installing each nozzle assembly (2), the indicator mark at location (J) must be at the top as shown. Tighten the nozzle to a torque of 2.8 N m (25 lb in).
Top View
Side View DO NOT overtighten tube assembly fittings. Over tightening can cause damage to tubing.4. Install 8X0912 Tube (9) in the front nozzle and 8W8174 Tube (7) in the rear nozzle as shown. Connect tubes (7) and (9) to 8C9006 Tee (8) using two 5P6314 Sleeves and 5P6313 Nuts.5. Put 8W8172 Tube (5) in position along the cylinder block and connect it to 8C9006 Tee (8) as shown using 5P6314 Sleeve and 5P6313 Nut.6. Connect one end of 8W8171 Tube (10) to elbow (11) on the bottom of the shuttle valve using a 5P6313 Nut and 5P6314 Sleeve. Fasten the tube to the frame cross tube using 6V2686 Clip (6) as shown.7. Connect one end of 7N0140 Tube Assembly (4) to the end of 8W8171 Tube (10) and connect the other end to the free end of 8W8172 Tube (5).8. Fasten the ether tubing assemblies, using three 6V2686 Clips (3) with existing bolts, on engine block and right regulator housing as shown.Installation of Ether Cylinders
1. Turn the disconnect switch to the ON position and put the start switch key in the OFF position. Make sure the two lamps on the console and the two yellow LEDs on the ECU are flashing.If they are flashing, it indicates that the control is functioning and recognizes that no ether cylinders are installed.2. Inspect the two digit, seven segment LED display on the ECU. It must read "OO". This in an indication that there are no faults.If the display does not read "OO", refer to the Service Manual for a troubleshooting procedure of the system. 3. Remove protective caps (1) and (3) from 9X7137 Ether Solenoid Valves (2) and (4). Install a new 9X7138 Filter Assembly in each solenoid valve inlet.4. Install a 9X0147 Collar on the neck of each new 7X1062 Ether Cylinder.5. Remove the protective plug from the end of the new FULL ether cylinder, then install the new ether cylinder on ether solenoid valve (2). The ether valve assembly at left location (C) is referred to as Ether Assembly No. 1. The ether valve assembly at right location (D) is referred to as Ether Assembly No. 2.Make sure that the dash mounted ETHER OUT warning lamp No. 1 and the ETHER OUT warning LED on the ECU are OFF. Repeat this procedure for installation of

Have questions with 101401-7090?





Group cross 101401-7090 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

9 400 613 733 
8971182940 
INJECTION-PUMP ASSEMBLY
4HF1
 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

9 400 613 734 
8971182950 
INJECTION-PUMP ASSEMBLY
4HG1

Nissan 

 
1670089TA9 
INJECTION-PUMP ASSEMBLY

Isuzu 

F 01G 09U 006 
8971182920 
INJECTION-PUMP ASSEMBLY
4HF1
 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

 
8971226160 
INJECTION-PUMP ASSEMBLY
4HF1
 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

 
8971226170 
INJECTION-PUMP ASSEMBLY
4HF1
 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

 
8971226150 
INJECTION-PUMP ASSEMBLY
4HG1
 
8971223561 
INJECTION-PUMP ASSEMBLY
 
8971223560 
INJECTION-PUMP ASSEMBLY
4HF1
9 400 610 405 
8971223571 
INJECTION-PUMP ASSEMBLY
F 01G 09U 007 
8971223570 
INJECTION-PUMP ASSEMBLY
4HF1
101401-7090  

101401-7091 
9 400 610 406 
8971223591 
INJECTION-PUMP ASSEMBLY
F 01G 09U 008 
8971223590 
INJECTION-PUMP ASSEMBLY
4HF1
Back to top