101401-4791 ZEXEL F 01G 09U 003 BOSCH INJECTION-PUMP ASSEMBLY f01g09u003 1014014791 8971147600


 

Information injection-pump assembly

BOSCH F 01G 09U 003 f01g09u003
ZEXEL 101401-4791 1014014791
ISUZU 8971147600 8971147600
101401-4791 INJECTION-PUMP ASSEMBLY
Rating:
46
Buy INJECTION-PUMP ASSEMBLY 101401-4791 zexel genuine, new aftermarket engine parts with delivery

Include in #1:

Cross reference number

BOSCH F 01G 09U 003 f01g09u003
ZEXEL 101401-4791 1014014791
ISUZU 8971147600 8971147600


Zexel num
Bosch num
Firm num
Name
101401-4791 
F 01G 09U 003 
8971147600  ISUZU
INJECTION-PUMP ASSEMBLY
4HG1 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   134424-3920
Overflow valve opening pressure kPa   127 107 147
Overflow valve opening pressure kgf/cm2   1.3 1.1 1.5
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-3-4-2
Pre-stroke mm   4.1 4.05 4.15
Rack position
Point B
  R=B
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   -
Rack position   11.9
Pump speed r/min   1600 1600 1600
Average injection quantity mm3/st.   92.5 90.9 94.1
Max. variation between cylinders %   0 -4 4
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   H
Rack position   9.5+-0.5
Pump speed r/min   285 285 285
Average injection quantity mm3/st.   10.5 9.2 11.8
Max. variation between cylinders %   0 -14 14
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(11.9)
Pump speed r/min   1600 1600 1600
Average injection quantity mm3/st.   92.5 91.5 93.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1-0.5
Pump speed r/min   960 960 960
Average injection quantity mm3/st.   74.5 70.5 78.5
Fixing the lever   *
Timer adjustment
Pump speed r/min   1150--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   1100
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   1600
Advance angle deg.   6 5.5 6.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101401-4791
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm.
----------
T1=K90
----------

Speed control lever angle

Test data 101401-4791
F:Full speed I:Idle (1)Stopper bolt set position 'H'
----------

----------
a=43deg+-5deg b=40deg+-3deg

Stop lever angle

Test data 101401-4791
N:Pump normal S:Stop the pump. (1)Use the hole at R = aa
----------
aa=64mm
----------
a=20deg+-5deg b=29deg+-5deg

0000001501 FICD

Test data 101401-4791
(A) applied negative pressure (B) Screw (c) Nut 1. Set the actuator as described below. (1)Confirm that there is clearance between the actuator lever and the speed lever. (2)Loosen the nut (C). (3)Push in the screw (B). (4)Apply P1 from the actuator (A) part. (5)Pull out the screw (B) slowly. (6)Tighten and fix the nut (C) when pump speed is Na and the rack position is Ra. (7)Torque the nut (C) to T1. (8)Apply P2 several times. (9)Confirm that the actuator functions normally. (10)Confirm that there is a clearance between the actuator lever and the speed lever at that time.
----------
P1=53.3kPa(400mmHg) P2=53.3kPa(400mmHg) Na=400r/min Ra=9.3+-0.1mm T1=1.2~1.6N-m(0.12~0.16kgf-m)
----------
L=(5)mm

0000001601 RACK SENSOR

Test data 101401-4791
Rack sensor adjustment 1. Flange type rack sensor (rack sensor adjustment -5*20) (1)These types of rack sensors do not need adjustment. Confirm the performance with the following procedures. (2)Mount the rack sensor main body to the pump main body. (3)Fix the pump lever at full. (4)At supply voltage V1, pump speed N1 and rack position Ra, confirm that the amp's output voltage is Vist. (5)Move the pump lever two or three times. (6)Set again to full. (7)Confirm that the amplifier output voltage is Vist. (8)Fix the caution plate to the upper part of the rack sensor. (For those without the caution plate instructions, make sure the nameplate of the rack sensor carries the "Don't hold here" caution.) (9)Apply red paint to the rack sensor mounting bolts (2 places).
----------
V1=5+-0.01V N1=960r/min Ra=R1(11.9)-0.5mm Vist=2.44+-0.28V
----------

Timing setting

Test data 101401-4791
(1)Pump vertical direction (2)Position of gear's standard threaded hole at No 1 cylinder's beginning of injection (3)Timing device stamping (4)At the No 1 cylinder's beginning of injection, align with the aligning mark seen through the bracket's check hole and mark the A/T's bevel C1. (5)B.T.D.C.: aa
----------
aa=7deg
----------
a=(60deg) b=(85deg)




Information:

Test
Set up as illustrated and turn the alternator to measure vacuum pump performance. If the measurement is lower than nominal values, disassemble and check for broken vane, traces of interference on housing, rotor and plate surfaces. Replace if defective.Ultimate vacuum Exhaust characteristics after 20 seconds 4.9 Safety Relay
(1) R8T30171 Safety Relay Inspection Measure voltage at each terminal in the sequence shown below to identify faulty parts.(a) On-vehicle Test (b) Component TestThe resistance value between terminals "R" and "L" shall be within specified range.(2) Inspection by RX-Q30 Safety Relay Continuity Tester Check between terminals marked with * applying 15 to 17 V between "K" and "E" terminals.4.10 Preheater
Intake air heater
(1) Removal and installation (Refer to Group 15 Intake and Exhaust.)(2) Inspection Perform the following inspection and check the function of each part or the wiring if necessary.(a) Time required before indicator becomes red-hot: Standard timeNominal value 40 to 60 seconds (ME037260, ME037197:1.83 kW)20 to 30 seconds (ME077014, ME077015:2.86 kW)(b) Check each terminal of the air heater for looseness and the heater element for damage and contact with other parts.Heater relay
Inspection (1) Check to ensure that there is continuity between the terminals "B" and "S" when 2.3 A (24 V type) or 5.2 A (12 V type) exciting current is applied between terminal "SW" in the illustration and body ground.(2) Check also the heater relay fuse and replace if it has been burnt out. When replacing fuses, be sure to use a fuse of specified capacity.4.11 Automatic Stop Device
Energize-to-stop type
(1) Stop solenoid (a) Connect the stop lever and solenoid using the rod and remove the solenoid cover.(b) Push manually the stop lever to the stop position and adjust the rod so that the solenoid pointer gap becomes as specified.(c) Check that the stop lever to external stopper clearance is as specified when the stop lever is on the operation side.(d) In the state of (c) above, apply specified voltage to solenoid "B" terminal and check that the pointer gap and ammeter reading are as specified. (Stop lever stop side)(e) Tighten the lock nut of the rod.(f) Check that the solenoid pointer color has not changed and then install the cover.(2) Solenoid relay Make connections as shown above and perform the following checks.(a) Oil pressure timerSet the snap switch A to ON. Operate a stop watch as soon as the snap switch B is set to ON, and measure the time required before the solenoid is operated.(b) Stop timerSet the snap switch B to OFF 5 seconds after the solenoid has been operated. At the same time, using a stop watch, measure the time required before the solenoid is reset.The snap switch B is set to OFF 5 seconds after operation of the solenoid because if the solenoid is operated, it takes 5 seconds before the alternator voltage disappears.(c) Manual stop timerWhen the push switch C (stop switch) is set to ON, the solenoid is operated. Operate a stop watch as soon as the stop switch C is set to

Have questions with 101401-4791?





Group cross 101401-4791 ZEXEL

Isuzu 

 
8970934940 
INJECTION-PUMP ASSEMBLY
4BD1-T
F 019 Z10 036 
8970934941 
INJECTION-PUMP ASSEMBLY
4BD1-T
9 400 613 723 
8971175620 
INJECTION-PUMP ASSEMBLY
4BD1-T
F 019 Z10 029 
8971175621 
INJECTION-PUMP ASSEMBLY
4BD1-T
F 019 Z10 566 
8970934960 
INJECTION-PUMP ASSEMBLY
4BD1-T
F 019 Z10 154 
8970934961 
INJECTION-PUMP ASSEMBLY
4BD1-T
F 019 Z10 155 
8971175630 
INJECTION-PUMP ASSEMBLY
4BD1-T
F 019 Z10 155 
8971175631 
INJECTION-PUMP ASSEMBLY
4BD1-T
 
8970934970 
INJECTION-PUMP ASSEMBLY
4BD1-T
 
8970934971 
INJECTION-PUMP ASSEMBLY
4BD1-T
9 400 613 724 
8971175640 
INJECTION-PUMP ASSEMBLY
4BD1-T
9 400 613 352 
8971175641 
INJECTION-PUMP ASSEMBLY
4BD1-T
 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

 
8970899040 
INJECTION-PUMP ASSEMBLY
4HF1
 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

 
8971058370 
INJECTION-PUMP ASSEMBLY
4HF1
 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

 
8971058390 
INJECTION-PUMP ASSEMBLY
4HF1
 
8970899050 
INJECTION-PUMP ASSEMBLY
4HG1

Nissan 

 
1670089TA1 
INJECTION-PUMP ASSEMBLY

Isuzu 

F 01G 09U 002 
8971147590 
INJECTION-PUMP ASSEMBLY
4HG1

Nissan 

 
1670089TA2 
INJECTION-PUMP ASSEMBLY

Isuzu 

101401-4791  
F 01G 09U 003 
8971147600 
INJECTION-PUMP ASSEMBLY
4HG1
Back to top