101401-4311 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1014014311 8970488111


 

Information injection-pump assembly

ZEXEL 101401-4311 1014014311
ISUZU 8970488111 8970488111
101401-4311 INJECTION-PUMP ASSEMBLY
Rating:
36
Buy INJECTION-PUMP ASSEMBLY 101401-4311 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

ZEXEL 101401-4311 1014014311
ISUZU 8970488111 8970488111


Zexel num
Bosch num
Firm num
Name
101401-4311 
101401-4312 
 
8970488111  ISUZU
INJECTION-PUMP ASSEMBLY
4HF1 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-4920
Overflow valve opening pressure kPa   127 107 147
Overflow valve opening pressure kgf/cm2   1.3 1.1 1.5
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-3-4-2
Pre-stroke mm   4.1 4.05 4.15
Rack position
Point A
  R=A
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   -
Rack position   11.9
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   71 69.4 72.6
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   H
Rack position   9.5+-0.5
Pump speed r/min   285 285 285
Average injection quantity mm3/st.   15.5 14.2 16.8
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(11.9)
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   71 70 72
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1+0.2
Pump speed r/min   1600 1600 1600
Average injection quantity mm3/st.   83.5 79.5 87.5
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   I
Rack position   -
Pump speed r/min   150 150 150
Average injection quantity mm3/st.   80 80 112
Fixing the lever   *
Timer adjustment
Pump speed r/min   1375--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   1325
Advance angle deg.   0.3
Timer adjustment_03
Pump speed r/min   1500
Advance angle deg.   3.3 2.8 3.8
Timer adjustment_04
Pump speed r/min   1600--
Advance angle deg.   5 4.5 5.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 101401-4311
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm.
----------
T1=H43
----------

Speed control lever angle

Test data 101401-4311
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=43deg+-5deg b=(36deg)+-3deg

Stop lever angle

Test data 101401-4311
N:Pump normal S:Stop the pump. (1)Use the hole at R = aa
----------
aa=64mm
----------
a=20deg+-5deg b=29deg+-5deg

0000001501 MICRO SWITCH

Adjustment of the micro-switch Adjust the bolt to obtain the following lever position when the micro-switch is ON. (1)Speed N1 (2)Rack position Ra
----------
N1=1100r/min Ra=8.9+-0.1mm
----------

0000001601 FICD

Test data 101401-4311
(A) applied negative pressure (B) Screw (c) Nut 1. Set the actuator as described below. (1)Confirm that there is clearance between the actuator lever and the speed lever. (2)Loosen the nut (C). (3)Push in the screw (B). (4)Apply P1 from the actuator (A) part. (5)Pull out the screw (B) slowly. (6)Tighten and fix the nut (C) when pump speed is Na and the rack position is Ra. (7)Torque the nut (C) to T1. (8)Apply P2 several times. (9)Confirm that the actuator functions normally. (10)Confirm that there is a clearance between the actuator lever and the speed lever at that time.
----------
P1=53.3kPa(400mmHg) P2=53.3kPa(400mmHg) Na=475r/min Ra=9.55+-0.1mm T1=1.2~1.6N-m(0.12~0.16kgf-m)
----------
L=(2)mm

Timing setting

Test data 101401-4311
(1)Pump vertical direction (2)Position of gear's standard threaded hole at No 1 cylinder's beginning of injection (3)Stamping position on the A/T outer rim (4)Pump bracket check hole position. (5)At the No 1 cylinder's beginning of injection, align with the projection seen through the bracket's check hole and mark the A/T's bevel C1. (6)B.T.D.C.: aa
----------
aa=10deg
----------
a=(60deg) b=(85deg)




Information:


Rework Procedure
Replacement of Diesel Oxidation Catalyst (DOC):
1. Remove three 222-8823 Bolts and three 232-3209 Washers to separate the 360-8875 Bellows Tube Assembly from the 360-8849 Catalytic Converter Group. Refer to Image1.1.1.
Image1.1.1
2. Loosen the clamp. Remove the DOC from the Catalytic Converter Group. Refer to Images1.2.1 and 1.2.2.
Image1.2.1
Image1.2.2
3. Remove the ring from the DOC. Remove the clamp from the catalytic converter. Refer to Images1.3.1 and 1.3.2.
Image1.3.1
Image1.3.2
4. Remove the five screws and five washers from the insulation around the DOC. Remove the insulation from the DOC. The insulation will be reused. Refer to Images1.4.1 and 1.4.2.
Image1.4.1
Image1.4.2
5. Install the insulation that was removed from the old DOC on to the new DOC. Refer to Image1.5.1.
Image1.5.1
6. Clean the sealing surface of the DOC flange. Clean the sealing surface of the flange on the catalytic converter group. Clean the ring that was removed from the old DOC. Refer to Images1.6.1, 1.6.2, and 1.6.3.
Image1.6.1
Image1.6.2
Image1.6.3
7. Apply seal paste to both sides of the ring, to the flange surfaces of the new DOC, and the catalytic converter. Refer to Image1.7.1.
Note: Make sure to cover the complete ring and flange surfaces with seal paste when applying it.
Image1.7.1
8. Place the ring on the flange of the new DOC. Position the new DOC against the catalytic converter. Refer to Images1.8.1 and 1.8.2.
Image1.8.1
Image1.8.2
9. Orient the DOC so that it will line up correctly with the bellows tube. Install and orient the clamp in order to hold the new DOC in place. Apply sealing paste or high temperature grease to the bolt of the clamp. Tighten the clamp. Then reattach the DOC to the bellows tube. Refer to Image1.9.1.
Image1.9.1
10. Tap the clamp around the circumference to properly seat the clamp. Tighten the clamp to a specified torque of 18 N.m (13.3 ft-lb). Apply sealing paste or high temperature grease to the three 222-8823 Bolts to assemble the bellows. Refer to Image1.10.1.
Image1.10.1
11. Write down the number of active regenerations. This number can be found in the Monitor Service Menu in the Aftertreatment Status section. Enter this information to the claim story when you submit your claim. Refer to Image1.11.1.
Image1.11.1

Have questions with 101401-4311?





Group cross 101401-4311 ZEXEL

Isuzu 

 
8970483060 
INJECTION-PUMP ASSEMBLY
4HF1
 
8970483061 
INJECTION-PUMP ASSEMBLY
4HF1
9 400 613 690 
8970483063 
INJECTION-PUMP ASSEMBLY
4HF1
 
8970488110 
INJECTION-PUMP ASSEMBLY
4HF1
101401-4311  

101401-4312 
 
8970488111 
INJECTION-PUMP ASSEMBLY
4HF1
9 400 613 691 
8970488113 
INJECTION-PUMP ASSEMBLY
4HF1
 
8970758630 
INJECTION-PUMP ASSEMBLY
4HF1
 
8970758631 
INJECTION-PUMP ASSEMBLY
4HF1
9 400 613 692 
8970758633 
INJECTION-PUMP ASSEMBLY
4HF1
 
8970758640 
INJECTION-PUMP ASSEMBLY
4HF1
F 019 Z10 035 
8970758641 
INJECTION-PUMP ASSEMBLY
4HF1
9 400 613 693 
8970758643 
INJECTION-PUMP ASSEMBLY
4HF1
 
8970758650 
INJECTION-PUMP ASSEMBLY
4HF1
 
8970758651 
INJECTION-PUMP ASSEMBLY
4HF1
9 400 613 694 
8970758653 
INJECTION-PUMP ASSEMBLY
4HF1
 
8970758660 
INJECTION-PUMP ASSEMBLY
4HF1
F 019 Z10 034 
8970758661 
INJECTION-PUMP ASSEMBLY
4HF1
9 400 613 695 
8970758663 
INJECTION-PUMP ASSEMBLY
4HF1
 
8970655220 
INJECTION-PUMP ASSEMBLY
4HF1
F 019 Z10 313 
8970655221 
INJECTION-PUMP ASSEMBLY
4HF1
9 400 613 696 
8970655223 
INJECTION-PUMP ASSEMBLY
4HF1
F 019 Z10 314 
8970655230 
INJECTION-PUMP ASSEMBLY
4HF1
F 019 Z10 315 
8970655231 
INJECTION-PUMP ASSEMBLY
4HF1
F 019 Z10 316 
8970655232 
INJECTION-PUMP ASSEMBLY
4HF1
F 019 Z10 098 
8970655233 
INJECTION-PUMP ASSEMBLY
4HF1
9 400 613 697 
8970655234 
INJECTION-PUMP ASSEMBLY
4HF1
 
8970613930 
INJECTION-PUMP ASSEMBLY
4HE1-T
 
8970613931 
INJECTION-PUMP ASSEMBLY
4HE1-T
 
8970613933 
INJECTION-PUMP ASSEMBLY
4HE1-T
 
8971140030 
INJECTION-PUMP ASSEMBLY
4HE1-T
 
8971197160 
INJECTION-PUMP ASSEMBLY
4HE1-T
9 400 610 398 
8971295660 
INJECTION-PUMP ASSEMBLY
4HE1-T
Back to top