101401-4252 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1014014252


 

Information injection-pump assembly

ZEXEL 101401-4252 1014014252
101401-4252 INJECTION-PUMP ASSEMBLY
Rating:
15
Buy INJECTION-PUMP ASSEMBLY 101401-4252 zexel genuine, new aftermarket engine parts with delivery

Service parts 101401-4252 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 101040-8980
3. GOVERNOR 105931-9230
4. SUPPLY PUMP 105210-5270
5. AUTOM. ADVANCE MECHANIS 105676-5010
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105118-5253
11. Nozzle and Holder 8-97114-015-0
12. Open Pre:MPa(Kqf/cm2) 18.1{185}
13. NOZZLE-HOLDER 105048-3673
14. NOZZLE 105017-1210
15. NOZZLE SET

Include in #1:

101401-4252 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 101401-4252 1014014252


Zexel num
Bosch num
Firm num
Name
101401-4252 
 
   
INJECTION-PUMP ASSEMBLY
14BC PE4A,5A, PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   6-2-600
Overflow valve   131424-4920
Overflow valve opening pressure kPa   127 107 147
Overflow valve opening pressure kgf/cm2   1.3 1.1 1.5
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-3-4-2
Pre-stroke mm   4.1 4.05 4.15
Rack position
Point A
  R=A
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-3
deg.   90 89.5 90.5
Difference between angles 2
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 3
Cyl.1-2
deg.   270 269.5 270.5
Injection quantity adjustment
Adjusting point   -
Rack position   12
Pump speed r/min   960 960 960
Average injection quantity mm3/st.   60.9 59.3 62.5
Max. variation between cylinders %   0 -2.5 2.5
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   H
Rack position   9.5+-0.5
Pump speed r/min   285 285 285
Average injection quantity mm3/st.   10 8.7 11.3
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(12)
Pump speed r/min   960 960 960
Average injection quantity mm3/st.   60.9 59.9 61.9
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1+0.6
Pump speed r/min   1600 1600 1600
Average injection quantity mm3/st.   83.7 79.7 87.7
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   I
Rack position   -
Pump speed r/min   150 150 150
Average injection quantity mm3/st.   79 79 111
Fixing the lever   *
Timer adjustment
Pump speed r/min   -
Advance angle deg.   0 0 0
Remarks
Measure speed (beginning of operation).
 
Timer adjustment_02
Pump speed r/min   -
Advance angle deg.   5 4.5 5.5
Remarks
Measure the actual speed, stop
 

Test data Ex:

Governor adjustment

Test data 101401-4252
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm.
----------
T1=G97
----------

Speed control lever angle

Test data 101401-4252
F:Full speed I:Idle (1)Stopper bolt set position 'H'
----------

----------
a=43deg+-5deg b=37deg+-3deg

Stop lever angle

Test data 101401-4252
N:Pump normal S:Stop the pump. (1)Use the hole at R = aa
----------
aa=64mm
----------
a=20deg+-5deg b=29deg+-5deg

0000001501 FICD

Test data 101401-4252
(A) applied negative pressure (B) Screw (c) Nut 1. Set the actuator as described below. (1)Confirm that there is clearance between the actuator lever and the speed lever. (2)Loosen the nut (C). (3)Push in the screw (B). (4)Apply P1 from the actuator (A) part. (5)Pull out the screw (B) slowly. (6)Tighten and fix the nut (C) when pump speed is Na and the rack position is Ra. (7)Torque the nut (C) to T1. (8)Apply P2 several times. (9)Confirm that the actuator functions normally. (10)Confirm that there is a clearance between the actuator lever and the speed lever at that time.
----------
P1=53.3kPa(400mmHg) P2=53.3kPa(400mmHg) Na=440r/min Ra=9.55+-0.1mm T1=1.2~1.6N-m(0.12~0.16kgf-m)
----------
L=(2)mm

Timing setting

Test data 101401-4252
(1)Pump vertical direction (2)Position of gear's standard threaded hole at No 1 cylinder's beginning of injection (3)Stamping position on the A/T outer rim (4)Pump bracket check hole position. (5)At the No 1 cylinder's beginning of injection, align with the projection seen through the bracket's check hole and mark the A/T's bevel C1. (6)B.T.D.C.: aa
----------
aa=11deg
----------
a=(60deg) b=(85deg)




Information:

1. Disconnect two Fuel lines (1).2. Remove four bolts (2) and remove fuel transfer pump and gasket. The following steps are for the installation of the fuel transfer pump.3. Position the gasket and fuel transfer pump then install bolts (2).4. Connect fuel lines (1).5. Prime the fuel system. See the MAINTENANCE MANUAL.Disassemble Fuel Transfer Pump
Start By:a. remove fuel transfer pump 1. Remove cover (1) from the fuel transfer pump. 2. Remove strainer (2). 3. Remove valve housing (3) from body (4). 4. Use a pencil grinder to remove the staked metal that holds inlet check valve (6) and outlet check valve (5) in place. Remove check valves (5) and (6). 5. Push the center of the diaphragm down and turn it 90° to disengage the actuator rod from the actuator arm. Remove diaphragm (7). 6. Remove spring (8). 7. Remove retainer (9). 8. Remove lever (12), shaft (11) and arm (10) as an assembly. 9. If necessary, remove washers (13) from shaft (11). Remove shaft (11) and separate arm (10) from lever (12). 10. If necessary, remove primer (14) and spring.11. Thoroughly inspect all parts of the fuel transfer pump. A repair kit is available to rebuild the fuel transfer pump. The following steps are for the assembly of the fuel transfer pump. 12. Install primer (14) and the spring on to body (4). 13. Install lever (12) into arm (10) and install pin (11) through the arm and lever. Put washer (13) on each side of arm (10). 14. Put spring (15) into position on the boss in body (4). Install arm (10) and lever (12) as an assembly into body (4). Be sure spring (15) engages with the tang on lever (12). 15. Install two retainers (9) to hold shaft (11) and arm and lever assembly in body (4). 16. Install spring (8) into body (4). 17. Install diaphragm (7) into body (4). Put the flat on the actuator rod in alignment with lever (12). Push the center of the diaphragm down and turn it 90° to engage the actuator rod with the actuator arm. 18. Install a gasket and check valve (6) and gasket and check valve (5) in valve body (3). Stake valve body (3) around each check valve to hold them in position. Make the stake marks at a different location than the original stake marks. 19. Put the valve body in place on diaphragm (7) and install the screws that hold it. 20. Put strainer (2) in position on valve body (3). 21. Install a new gasket in cover (1) and Install cover (1) on body.End By:a. install fuel transfer pump

Have questions with 101401-4252?





Group cross 101401-4252 ZEXEL

F 019 Z10 804 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
101401-4252  
 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

F 019 Z10 466 
8970479570 
INJECTION-PUMP ASSEMBLY
4HF1
9 400 613 687 
8970479571 
INJECTION-PUMP ASSEMBLY
4HF1
Back to top