Information injection-pump assembly
ZEXEL
101401-4240
1014014240
ISUZU
8970468340
8970468340

Rating:
Service parts 101401-4240 INJECTION-PUMP ASSEMBLY:
1.
_
6.
COUPLING PLATE
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
8-94117-023-1
12.
Open Pre:MPa(Kqf/cm2)
18.1{185}
15.
NOZZLE SET
Cross reference number
ZEXEL
101401-4240
1014014240
ISUZU
8970468340
8970468340
Zexel num
Bosch num
Firm num
Name
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 6-2-600
Outer diameter - inner diameter - length (mm) mm 6-2-600
Overflow valve
131424-4920
Overflow valve opening pressure
kPa
127
107
147
Overflow valve opening pressure
kgf/cm2
1.3
1.1
1.5
Tester oil delivery pressure
kPa
157
157
157
Tester oil delivery pressure
kgf/cm2
1.6
1.6
1.6
Direction of rotation (viewed from drive side)
Right R
Right R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right R
Right R
Injection order
1-3-4-2
Pre-stroke
mm
3.4
3.35
3.45
Beginning of injection position
Drive side NO.1
Drive side NO.1
Difference between angles 1
Cal 1-3 deg. 90 89.5 90.5
Cal 1-3 deg. 90 89.5 90.5
Difference between angles 2
Cal 1-4 deg. 180 179.5 180.5
Cal 1-4 deg. 180 179.5 180.5
Difference between angles 3
Cyl.1-2 deg. 270 269.5 270.5
Cyl.1-2 deg. 270 269.5 270.5
Injection quantity adjustment
Adjusting point
-
Rack position
13
Pump speed
r/min
900
900
900
Average injection quantity
mm3/st.
72.8
71.2
74.4
Max. variation between cylinders
%
0
-2.5
2.5
Basic
*
Fixing the rack
*
Boost pressure
kPa
48
48
Boost pressure
mmHg
360
360
Standard for adjustment of the maximum variation between cylinders
*
Injection quantity adjustment_02
Adjusting point
-
Rack position
9.6+-0.5
Pump speed
r/min
290
290
290
Average injection quantity
mm3/st.
8
6.7
9.3
Max. variation between cylinders
%
0
-14
14
Fixing the rack
*
Standard for adjustment of the maximum variation between cylinders
*
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
Adjust only variation between cylinders; adjust governor according to governor specifications.
Injection quantity adjustment_03
Adjusting point
A
Rack position
R1(13)
Pump speed
r/min
900
900
900
Average injection quantity
mm3/st.
72.8
71.8
73.8
Basic
*
Fixing the lever
*
Boost pressure
kPa
48
48
Boost pressure
mmHg
360
360
Injection quantity adjustment_04
Adjusting point
I
Rack position
-
Pump speed
r/min
150
150
150
Average injection quantity
mm3/st.
123
123
131
Fixing the lever
*
Rack limit
*
Boost compensator adjustment
Pump speed
r/min
600
600
600
Rack position
R2-1.05
Boost pressure
kPa
18.7
16
21.4
Boost pressure
mmHg
140
120
160
Boost compensator adjustment_02
Pump speed
r/min
600
600
600
Rack position
R2(R1-0.
25)
Boost pressure
kPa
34.7
28
41.4
Boost pressure
mmHg
260
210
310
Timer adjustment
Pump speed
r/min
1400--
Advance angle
deg.
0
0
0
Remarks
Start
Start
Timer adjustment_02
Pump speed
r/min
1350
Advance angle
deg.
0.3
Timer adjustment_03
Pump speed
r/min
1600
Advance angle
deg.
4.5
4
5
Remarks
Finish
Finish
Test data Ex:
Governor adjustment

N:Pump speed
R:Rack position (mm)
(1)Torque cam stamping: T1
(2)RACK LIMIT
(3)Boost compensator stroke: BCL
----------
T1=D57 BCL=1.05+-0.1mm
----------
----------
T1=D57 BCL=1.05+-0.1mm
----------
Speed control lever angle

F:Full speed
I:Idle
(1)Stopper bolt set position 'H'
----------
----------
a=5.5deg+-5deg b=39deg+-3deg
----------
----------
a=5.5deg+-5deg b=39deg+-3deg
Stop lever angle

N:Pump normal
S:Stop the pump.
----------
----------
a=45deg+-5deg b=29deg+-5deg
----------
----------
a=45deg+-5deg b=29deg+-5deg
Timing setting

(1)Pump vertical direction
(2)Position of gear mark 'CC' at No 1 cylinder's beginning of injection
(3)B.T.D.C.: aa
(4)-
----------
aa=11deg
----------
a=(100deg)
----------
aa=11deg
----------
a=(100deg)
Information:
The following installation procedures are to be used in conjunction with Special Instruction, SEHS9173, "Installation of Automatic Ether Injection System (AEIS)". This instruction outlines the extra steps needed to install components of the MPPS system along with routing and clipping of harnesses.
Before starting the installation procedure, make certain that the machine disconnect switch is in the off position.Do not perform any procedure, outlined in this publication, or order any parts until you read and understand the information contained within.Reference: Service Manual, SENR4705-02 and Special Instruction, SEHS9173.Necessary Parts
The following parts list shows some part numbers in the deleted column. This means that these parts are called out on the Automatic Ether Injection System (AEIS) retrofit instructions but should not be ordered, since they are replaced by different parts for Multipoint Pressure Sensing (MPPS). This only applies if an AEIS retrofit is also being performed. Installation of 3E3778 Ether Control Group
* The 3E3778 Control Group is required for the MPPS system.If MPPS is being installed in conjunction with an AEIS retrofit, substitute the 3E3778 Control Group for the 9X5303 Control Group called out in the Automatic Ether Injection System Special Instruction, SEHS9173. Substitute a 3E3779 Film for the 9X4542 Film.If MPPS is being added to an existing AEIS system, check the electronic control box installed with the AEIS system to see if it is a 3E3778 or a 9X5303 Control Group. If a 9X5303 Control Group is installed, replace it with a 3E3778 Control Group and 3E3779 Film. Follow the control box installation instructions outlined in the AEIS installation Special Instruction. Be sure to install the 8R7105 Wire As. between the control and mounting plate to ground the control box to the frame. If an MPPS identification film is needed for a language other than English, refer to the following chart for the part number of the film for a specific language. Installation of 3E3530 Electronic Control Group [(PWM) Oil Pressure Sensor]
1. Remove the 6T4949 Oil Pressure Switch and the O-ring port adapter from the turbo oil adapter on the right rear of the engine (switch on the bottom port with 405-GY attached to it)2. Install a 3E5276 Adapter (1) in the port using a 3J7354 Seal (2) and a 6V4589 O-ring Seal (3).3. Install 3E3530 Electronic Control Group (4) [PWM Oil Pressure Sensor] onto 3E5276 Adapter (1).4. Using a 5P7854 Clip (5), loosely install the 3E3530 Control Group on the flywheel housing as shown using a 1T0720 Bolt (6) and 5P1075 Washer (7).Installation of Wiring Harnesses
Installation of 8E7966 Ether (Engine) Wiring Harness
* The 9N4537 Engine Harness on the AEIS is replaced with 8E7966 Harness Assembly.If MPPS is being installed at the same time as AEIS, substitute 8E7966 Harness Assembly for 9N4537 Harness Assembly called out in the AEIS installation Special Instructions.If MPPS is being added to an existing AEIS, disconnect the old 9N4537 Harness Assembly from the 9X0377 Control Group (water temperature sensor), 6T4361 Speed Sensor and the ether chassis harness.Install the 8E7966 Harness Assembly following the same installation