Service parts 101401-1624 INJECTION-PUMP ASSEMBLY:
1.
_
6.
COUPLING PLATE
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
ME016989
12.
Open Pre:MPa(Kqf/cm2)
21.6{220}
15.
NOZZLE SET
Cross reference number
ZEXEL
101401-1624
1014011624
Zexel num
Bosch num
Firm num
Name
101401-1624
INJECTION-PUMP ASSEMBLY
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 6-2-600
Outer diameter - inner diameter - length (mm) mm 6-2-600
Overflow valve
131424-8820
Overflow valve opening pressure
kPa
157
123
191
Overflow valve opening pressure
kgf/cm2
1.6
1.25
1.95
Tester oil delivery pressure
kPa
157
157
157
Tester oil delivery pressure
kgf/cm2
1.6
1.6
1.6
Direction of rotation (viewed from drive side)
Right R
Right R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right R
Right R
Injection order
1-3-4-2
Pre-stroke
mm
3.2
3.15
3.25
Beginning of injection position
Drive side NO.1
Drive side NO.1
Difference between angles 1
Cal 1-3 deg. 90 89.5 90.5
Cal 1-3 deg. 90 89.5 90.5
Difference between angles 2
Cal 1-4 deg. 180 179.5 180.5
Cal 1-4 deg. 180 179.5 180.5
Difference between angles 3
Cyl.1-2 deg. 270 269.5 270.5
Cyl.1-2 deg. 270 269.5 270.5
Injection quantity adjustment
Adjusting point
-
Rack position
11.9
Pump speed
r/min
900
900
900
Average injection quantity
mm3/st.
73.9
72.3
75.5
Max. variation between cylinders
%
0
-2.5
2.5
Basic
*
Fixing the rack
*
Standard for adjustment of the maximum variation between cylinders
*
Injection quantity adjustment_02
Adjusting point
Z
Rack position
9.5+-0.5
Pump speed
r/min
365
365
365
Average injection quantity
mm3/st.
19.5
18.2
20.8
Max. variation between cylinders
%
0
-10
10
Fixing the rack
*
Standard for adjustment of the maximum variation between cylinders
*
Injection quantity adjustment_03
Adjusting point
A
Rack position
R1(11.9)
Pump speed
r/min
900
900
900
Average injection quantity
mm3/st.
73.9
72.9
74.9
Basic
*
Fixing the lever
*
Boost pressure
kPa
24.7
24.7
Boost pressure
mmHg
185
185
Injection quantity adjustment_04
Adjusting point
B
Rack position
R1+1.8
Pump speed
r/min
1600
1600
1600
Average injection quantity
mm3/st.
92.5
88.5
96.5
Fixing the lever
*
Boost pressure
kPa
24.7
24.7
Boost pressure
mmHg
185
185
Injection quantity adjustment_05
Adjusting point
C
Rack position
(R1-1)
Pump speed
r/min
500
500
500
Average injection quantity
mm3/st.
46.3
42.3
50.3
Fixing the lever
*
Boost pressure
kPa
24.7
24.7
Boost pressure
mmHg
185
185
Injection quantity adjustment_06
Adjusting point
D
Rack position
R2-0.65
Pump speed
r/min
300
300
300
Average injection quantity
mm3/st.
18.7
14.7
22.7
Fixing the lever
*
Boost pressure
kPa
0
0
0
Boost pressure
mmHg
0
0
0
Boost compensator adjustment
Pump speed
r/min
300
300
300
Rack position
R2-0.65
Boost pressure
kPa
4
2.7
5.3
Boost pressure
mmHg
30
20
40
Boost compensator adjustment_02
Pump speed
r/min
300
300
300
Rack position
R2(R1-0.
65)
Boost pressure
kPa
11.3
11.3
11.3
Boost pressure
mmHg
85
85
85
Timer adjustment
Pump speed
r/min
1250--
Advance angle
deg.
0
0
0
Remarks
Start
Start
Timer adjustment_02
Pump speed
r/min
1200
Advance angle
deg.
0.5
Timer adjustment_03
Pump speed
r/min
1600
Advance angle
deg.
4.5
4
5
Remarks
Finish
Finish
Test data Ex:
Governor adjustment

N:Pump speed
R:Rack position (mm)
(1)Torque cam stamping: T1
(2)Tolerance for racks not indicated: +-0.05mm.
(3)Boost compensator stroke: BCL
----------
T1=J00 BCL=0.65+-0.1mm
----------
----------
T1=J00 BCL=0.65+-0.1mm
----------
Speed control lever angle

F:Full speed
I:Idle
(1)Use the hole at R = aa
(2)Stopper bolt set position 'H'
----------
aa=40mm
----------
a=26deg+-5deg b=40deg+-3deg
----------
aa=40mm
----------
a=26deg+-5deg b=40deg+-3deg
Stop lever angle

N:Engine manufacturer's normal use
S:Stop the pump.
(1)Use the hole at R = aa
(2)At speed = bb and rack position = cc, confirm that the stopper bolt is set at the non-injection position.
(3)After setting the stopper bolt, confirm non-injection at speed dd. Rack position = ee (non-injection rack position)
(4)-
(5)Rack position corresponding to ff
(6)Free (at delivery)
----------
aa=40mm bb=1600r/min cc=5-0.5mm dd=325r/min ee=(8)--mm ff=16mm
----------
a=29deg+-5deg b=19deg+-5deg c=33deg+-5deg
----------
aa=40mm bb=1600r/min cc=5-0.5mm dd=325r/min ee=(8)--mm ff=16mm
----------
a=29deg+-5deg b=19deg+-5deg c=33deg+-5deg
0000001501 MICRO SWITCH
Adjustment of the micro-switch
Adjust the bolt to obtain the following lever position when the micro-switch is ON.
(1)Speed N1
(2)Rack position Ra
----------
N1=1025r/min Ra=8.5+-0.1mm
----------
----------
N1=1025r/min Ra=8.5+-0.1mm
----------
Timing setting

(1)Pump vertical direction
(2)Position of gear mark '3' at No 1 cylinder's beginning of injection
(3)B.T.D.C.: aa
(4)-
----------
aa=12deg
----------
a=(130deg)
----------
aa=12deg
----------
a=(130deg)
Information:
AUGUST 2011
INFORMATION RELEASE MEMO
Reman
PELJ1306 ?2011 Caterpillar REMAN DIESEL PARTICULATE FILTERS FOR MACHINE APPLICATIONS
To provide our customers with cost effective service options to support their Tier 4 emissions engines, Cat Reman has released a Reman version of the diesel particulate filters (DPF) used on many Tier 4 Cat? machines. The DPF traps both soot and ash. Soot is removed through a regeneration process outlined in the machines operation and maintenance manual. Ash that accumulates from engine oil is removed through a cleaning procedure that requires removal of the DPF from the machine. The cleaning procedure requires the DPF to be removed from the machine. Special Instruction REHS5045 outlines the three approved processes for performing the required Diesel Particulate Filter (DPF) maintenance on Tier 4 products equipped with a DPF.
Replacement of the existing DPF with a new Cat DPF
Replacement of the existing DPF with a remanufactured Cat DPF
Removal of the existing DPF and having the DPF cleaned by a Cat approved cleaning device.
The Reman DPFs listed below are available to support these maintenance requirements:
Core Acceptance
After gaining some experience with the previously released DPFs used for on-highway engines and to support the launch of these additional machine DPFs, we have changed some of the inspection criteria and issued a revision to SELD0292. SELD0292-02 Caterpillar Diesel Particulate Filter (DPF) is the current Core Acceptance Criteria (CAC). It is critical to avoid non-operational damage that can decrease the value of the cores. Encourage service technicians to handle and package the cores with care so they will be more likely to be eligible for the full core refunds. Please always refer to the most current version at catreman.cat.com/core to view the latest requirements. The acceptability inspection for these is a simple visual inspection based on the following guidelines:
Warranty
All Reman products carry the same warranty as new parts. Please consult the appropriate warranty statement for your area.
Core Management
Please refer to the Cat Core Management Information System (CMIS 2) related to the parts information application that describes all Reman part/Core Acceptability Family (CAF) and other related information. Also refer to other CMIS 2 inquiry applications such as: Dealer Customer Profile, Inspection Reason Codes, Inspection Line Inquiry, Dealer Add Charges, Dealer Entitlement Activity, Dealer CCR Inquiry, Dealer CCR Entry, Dealer Shipment Processing, Dealer Process Packaging Grief and Reporting. This information is available to all dealers worldwide that have been converted to CMIS 2.
Please go to the Reman web site https://catreman.cat.com for the latest policy and procedural updates that are available to all dealers worldwide explaining policy and procedural information such as Policy and Core Management SELD0122 -10, "Core Management Systems and Operations Procedures SELD0040-14, "Reman Core Return Packaging Instructions And Guidelines SELD0300-00 and "Shipping Instructions" SELD0039-14.
If you have any questions regarding Reman Core Management or Core Management Systems (CMIS2),
Have questions with 101401-1624?
Group cross 101401-1624 ZEXEL
101401-1624
INJECTION-PUMP ASSEMBLY