Information hydraulic governor
BOSCH
F 019 Z2E 474
f019z2e474
ZEXEL
105866-5022
1058665022
YANMAR
41100005320
41100005320
Rating:
Components :
0. | INJECTION-PUMP ASSEMBLY | 105866-5022 |
1. | _ | |
2. | FUEL INJECTION PUMP | |
3. | NUMBER PLATE | |
4. | _ | |
5. | CAPSULE | |
6. | ADJUSTING DEVICE | |
7. | NOZZLE AND HOLDER ASSY | |
8. | Nozzle and Holder | |
9. | Open Pre:MPa(Kqf/cm2) | |
10. | NOZZLE-HOLDER | |
11. | NOZZLE |
Scheme ###:
1. | [1] | 158502-0420 | BASE |
2. | [1] | 029811-8000 | BEARING PLATE |
3. | [1] | 158528-0900 | PACKING RING |
7. | [1] | 158131-0100 | GEAR SHAFT |
10. | [1] | 158028-0000 | O-RING |
11. | [1] | 158507-1920 | DIAPHRAGM HOUSING |
13. | [1] | 158621-0500 | SLEEVE |
18. | [1] | 158699-0621 | COMPENSATOR ASSY |
18/1. | [1] | 158610-1101 | POWER PISTON |
18/3. | [1] | 158654-0800 | COILED SPRING |
18/4. | [1] | 158614-0700 | STOP PIN |
18/5. | [1] | 158612-0500 | PLAIN WASHER |
18/6. | [1] | 158654-0900 | COILED SPRING |
18/7. | [1] | 016110-1220 | LOCKING WASHER |
18/8. | [1] | 158612-0401 | BUSHING |
18/9. | [2] | 016550-2310 | O-RING |
18/10. | [1] | 158615-0500 | PUMP PLUNGER |
18/11. | [1] | 025620-1410 | SPRING PIN |
35. | [3] | 029330-6070 | GASKET |
36. | [3] | 010206-2520 | HEX-SOCKET-HEAD CAP SCREW |
50. | [1] | 158600-0720 | FLYWEIGHT ASSEMBLY |
51. | [1] | 158106-0100 | PLAIN WASHER |
52. | [1] | 029811-0000 | BEARING PLATE |
53. | [1] | 158620-1120 | PILOT VALVE |
60. | [2] | 158220-0000 | GUIDE LEVER |
61. | [2] | 158736-0200 | BEARING PIN |
62. | [4] | 025520-1510 | SPLIT PIN |
70. | [1] | 158730-0220 | TERMINAL ARM |
70/1. | [1] | 158230-0020 | TERMINAL ARM |
70/2. | [1] | 158315-0200 | TERMINAL SHAFT |
70/3. | [1] | 158315-0200 | TERMINAL SHAFT |
70/4. | [2] | 158736-0100 | TAPER PIN |
70/5. | [2] | 011006-0620 | SET OF NUTS |
70/6. | [1] | 158214-0020 | SPEED DROOP ADJUSTER |
70/7. | [1] | 014020-5120 | PLAIN WASHER |
70/8. | [1] | 029320-5030 | TAB WASHER |
70/9. | [1] | 010535-1220 | FLAT-HEAD SCREW |
85. | [1] | 158814-0900 | SPEED CONTROL SHAFT |
86. | [2] | 158823-0300 | BUSHING |
86. | [2] | 158823-0300 | BUSHING |
87. | [1] | 158322-0200 | COILED SPRING |
88. | [1] | 158710-0400 | STRAP |
89. | [1] | 029404-5010 | BEARING PIN |
95. | [1] | 158211-0100 | STRAP |
96. | [2] | 158653-0100 | WIRE |
104. | [1] | 158017-0900 | GASKET |
105. | [1] | 158562-1420 | GOVERNOR MOTOR ASSY |
105/1. | [1] | 158962-5110 | CASE |
105/2. | [1] | 158903-1920 | SCREW |
105/5. | [1] | 158908-3600 | GEAR HEAD |
105/6. | [1] | 158908-4200 | MOTOR |
105/7. | [4] | 014020-4140 | PLAIN WASHER D8&4.5T0.5 |
105/8. | [4] | 158901-8100 | FLAT-HEAD SCREW |
105/9. | [1] | 158402-3020 | FRICTION COUPLING |
105/11. | [1] | 158908-3900 | CONDENSER |
105/12. | [2] | 014110-3440 | LOCKING WASHER |
105/13. | [2] | 012153-0840 | FLAT-HEAD SCREW M3P0.5L8 |
105/14. | [1] | 158404-1000 | LEVER SHAFT |
105/15. | [2] | 014020-8140 | PLAIN WASHER D16&8.5T1.2 |
105/16. | [1] | 158904-1920 | ROUND NUT |
105/17. | [1] | 158916-0000 | SET OF NUTS |
105/18. | [1] | 158404-1100 | TOOTHED GEAR |
105/19. | [2] | 011005-0820 | SET OF NUTS |
105/20. | [2] | 015320-1540 | SPLIT PIN |
105/21. | [1] | 158401-6400 | HOSE |
105/22. | [1] | 158401-5000 | WIRE |
105/23. | [2] | 158401-7300 | GASKET |
105/24. | [1] | 158401-7500 | GASKET |
105/25. | [1] | 158401-7400 | GROUND |
105/26. | [1] | 158962-6100 | COVER |
105/27. | [3] | 014110-5440 | LOCKING WASHER |
105/28. | [3] | 012155-1240 | FLAT-HEAD SCREW M5P0.8L12 |
105/29. | [1] | 158905-0000 | FILLER PIECE |
105/30. | [1] | 014110-8440 | LOCKING WASHER |
105/31. | [1] | 013020-8140 | UNION NUT M8P1.25H6.5 |
105/34. | [1] | 158906-1800 | CLAMP |
105/36. | [1] | 012154-1040 | FLAT-HEAD SCREW M4P0.7L10 |
105/37. | [1] | 014110-4440 | LOCKING WASHER |
105/40. | [1] | 013020-6040 | UNION NUT M6P1H5 |
105/41. | [1] | 158067-0100 | SET OF NUTS |
105/45. | [1] | 026512-1640 | GASKET D15.9&12.2T1 |
105/46. | [1] | 029111-2070 | CAPSULE M12P1.5L10 |
105/61. | [1] | 158950-0100 | TERMINAL |
105/120. | [1] | 158908-5100 | CABLE TIE |
106. | [3] | 029010-6350 | BLEEDER SCREW M6P1.0L22 |
115. | [1] | 029050-6310 | BLEEDER SCREW |
116. | [1] | 014110-6440 | LOCKING WASHER |
118. | [1] | 158527-0200 | NEEDLE VALVE |
119. | [1] | 016500-0710 | O-RING |
123. | [2] | 026512-1640 | GASKET D15.9&12.2T1 |
124. | [2] | 029111-2070 | CAPSULE M12P1.5L10 |
130. | [1] | 029331-8040 | GASKET |
131. | [1] | 158660-0320 | CONTROL VALVE |
135. | [1] | 158515-0900 | INDICATOR PLATE |
137. | [1] | 158515-1000 | INDICATOR PLATE |
140. | [1] | 158820-0620 | POINTER |
142. | [1] | 158820-0620 | POINTER |
163. | [1] | 010210-1420 | HEX-SOCKET-HEAD CAP SCREW |
164. | [1] | 026510-1340 | GASKET D13.4&10.2T1 |
190. | [1] | 158017-1000 | GASKET |
200. | [1] | 158599-7220 | SPARE PART |
Include in #2:
105866-5022
as INJECTION-PUMP ASSEMBLY
Cross reference number
Zexel num
Bosch num
Firm num
Name
Information:
Until recently, engine maintenance and repair management involved changing the oil when it was convenient and repairing the engine when it was damaged. This seemed to be the accepted way of managing a maintenance operation.However, due to a variety of circumstances, freight hauling jobs became increasingly competitive. This competitiveness caused users to look for ways to prolong equipment life and lower operating costs so that they could be competitive when bidding jobs.To assist Caterpillar Truck Engine users in prolonging engine life and reducing operating costs, the Value Planned Repair approach to engine maintenance was developed.The Value Planned Repair approach can be tailored for any engine. This approach, when properly structured, outlines every maintenance and repair service required to support an engine from the day it enters service until the day it is retired.To ensure the repair is performed efficiently and expediently, the Value Planned Repair concept approaches a given repair in three basic steps: 1. Repair determination2. Evaluation of repair options3. Selection of the most appropriate optionThe Value Planned Repair approach addresses: * Services required to maintain an engine at optimum efficiency.* Scheduled maintenance, repairs and overhauls to minimize unscheduled downtime.* Preplanned repairs and overhauls that can be flatrated, putting you in charge of costs.* Repair or overhaul options designed to restore the engine to proper operating condition.* Repair or overhaul options designed to renew the engine if a failure has occurred.Part of the Value Planned Repair approach is the repair before failure concept. The objective of the repair before failure concept is to repair the engine before a failure takes place. The fact that a failure has not taken place makes the repair before failure concept more economical since a high degree of parts such as pistons, liners, valves, etc., and major castings such as cylinder blocks, cylinder heads, etc., can be reused.Also, an extensive internal cleaning of the engine, which is labor intensive, is eliminated because a debris-generating failure has not taken place.The best part of the repair before failure concept is that unscheduled downtime is minimized and in most cases eliminated.Because the repair or overhaul can be scheduled, it allows the user to adjust his operation accordingly.The overall benefit to a customer who repairs an engine before failure is that the customer and not the engine is in control of the repairs required.To stress the importance of the Value Planned Repair approach, please consider the following example that reflects the difference in the cost of a before failure repair versus the cost of an after failure repair.The cost to repair a turbocharger after it fails is approximately five times more than the cost of repairing a turbocharger before it fails.However, if parts from a damaged turbocharger enters the engine, then the cost to repair your engine could be as high as 10 times or more the cost of repairing a turbocharger before it fails.By subscribing to the Value Planned Repair approach, you can avoid spending money on costly repairs that should have been prevented.Caterpillar strongly