Information hydraulic governor
BOSCH
F 019 Z2E 168
f019z2e168
ZEXEL
105856-2660
1058562660
Rating:
Components :
0. | INJECTION-PUMP ASSEMBLY | 105856-2660 |
1. | _ | |
2. | FUEL INJECTION PUMP | |
3. | NUMBER PLATE | |
4. | _ | |
5. | CAPSULE | |
6. | ADJUSTING DEVICE | |
7. | NOZZLE AND HOLDER ASSY | |
8. | Nozzle and Holder | |
9. | Open Pre:MPa(Kqf/cm2) | |
10. | NOZZLE-HOLDER | |
11. | NOZZLE |
Scheme ###:
1. | [1] | 158502-0420 | BASE |
2. | [1] | 029811-8000 | BEARING PLATE |
3. | [1] | 158528-0900 | PACKING RING |
7. | [1] | 158131-0100 | GEAR SHAFT |
10. | [1] | 158028-0000 | O-RING |
11. | [1] | 158507-1820 | DIAPHRAGM HOUSING |
13. | [1] | 158621-0800 | SLEEVE |
18. | [1] | 158699-0521 | COMPENSATOR ASSY |
18/1. | [1] | 158610-0901 | POWER PISTON |
18/3. | [1] | 158654-1000 | COILED SPRING |
18/4. | [1] | 158614-0300 | STOP PIN |
18/5. | [1] | 158612-0500 | PLAIN WASHER |
18/6. | [1] | 158654-1100 | COILED SPRING |
18/7. | [1] | 016110-1220 | LOCKING WASHER |
18/8. | [1] | 158612-0001 | BUSHING |
18/9. | [2] | 158528-1300 | O-RING |
18/10. | [1] | 158615-0400 | PUMP PLUNGER |
18/11. | [1] | 025620-1410 | SPRING PIN |
35. | [3] | 029330-6070 | GASKET |
36. | [3] | 010206-2520 | HEX-SOCKET-HEAD CAP SCREW |
50. | [1] | 158600-1020 | FLYWEIGHT ASSEMBLY |
51. | [1] | 158106-0100 | PLAIN WASHER |
52. | [1] | 029811-0000 | BEARING PLATE |
53. | [1] | 158620-1220 | PILOT VALVE |
60. | [2] | 158220-0000 | GUIDE LEVER |
61. | [2] | 158736-0200 | BEARING PIN |
62. | [4] | 025520-1510 | SPLIT PIN |
70. | [1] | 158730-0220 | TERMINAL ARM |
70/1. | [1] | 158230-0020 | TERMINAL ARM |
70/2. | [1] | 158315-0200 | TERMINAL SHAFT |
70/3. | [1] | 158315-0200 | TERMINAL SHAFT |
70/4. | [2] | 158736-0100 | TAPER PIN |
70/5. | [2] | 011006-0620 | SET OF NUTS |
70/6. | [1] | 158214-0020 | SPEED DROOP ADJUSTER |
70/7. | [1] | 014020-5120 | PLAIN WASHER |
70/8. | [1] | 029320-5030 | TAB WASHER |
70/9. | [1] | 010535-1220 | FLAT-HEAD SCREW |
85. | [1] | 158814-0900 | SPEED CONTROL SHAFT |
86. | [2] | 158823-0300 | BUSHING |
86. | [2] | 158823-0300 | BUSHING |
87. | [1] | 158322-0200 | COILED SPRING |
88. | [1] | 158710-0400 | STRAP |
89. | [1] | 029404-5010 | BEARING PIN |
95. | [1] | 158211-0100 | STRAP |
96. | [2] | 158653-0100 | WIRE |
104. | [1] | 158017-0900 | GASKET |
105. | [1] | 158963-0020 | PNEUMATIC CONTROLLER |
105/1. | [1] | 158562-4600 | COVER |
105/2. | [1] | 158910-0200 | CYLINDER |
105/3. | [3] | 029050-6090 | FLAT-HEAD SCREW |
105/4. | [1] | 014110-6440 | LOCKING WASHER |
105/5. | [1] | 158416-0000 | FLAT-HEAD SCREW |
105/6. | [1] | 158915-0700 | UNION NUT |
105/7. | [1] | 158918-0000 | PLAIN WASHER D30&10.8T1.00 |
105/8. | [1] | 158412-0400 | COILED SPRING K4.0 |
105/9. | [1] | 158912-0600 | COILED SPRING K5.1 |
105/9B. | [1] | 158912-0500 | COILED SPRING K4.9 |
105/9C. | [1] | 158912-0700 | COILED SPRING K5.2 |
105/9D. | [1] | 158912-1100 | COILED SPRING K4.8 |
105/9E. | [1] | 158912-1200 | COILED SPRING K5.4 |
105/10. | [1] | 158918-0000 | PLAIN WASHER D30&10.8T1.00 |
105/11. | [1] | 158413-0001 | STOP PIN |
105/12. | [1] | 158414-0000 | PUMP PLUNGER |
105/13. | [1] | 158414-0100 | DIAPHRAGM |
105/14. | [1] | 158414-0200 | PLATE |
105/15. | [1] | 013020-6040 | UNION NUT M6P1H5 |
105/16. | [1] | 158910-0300 | CAP |
105/17. | [1] | 158915-1000 | FLAT-HEAD SCREW |
105/18. | [1] | 029630-9050 | O-RING |
105/19. | [1] | 158567-1500 | WING NUT |
105/21. | [1] | 158904-2020 | ROUND NUT |
105/22. | [1] | 158916-0000 | SET OF NUTS |
105/23. | [2] | 029050-6220 | FLAT-HEAD SCREW |
105/24. | [2] | 029320-6010 | LOCKING WASHER |
105/25. | [2] | 158909-0200 | BLEEDER SCREW |
105/26. | [1] | 027114-1040 | INLET UNION |
105/27. | [2] | 029331-4120 | GASKET D18&14.2T1.5 |
105/28. | [1] | 027414-2640 | EYE BOLT |
105/30. | [1] | 013020-6040 | UNION NUT M6P1H5 |
105/31. | [1] | 158567-1200 | SET OF NUTS |
105/35. | [1] | 026512-1640 | GASKET D15.9&12.2T1 |
105/36. | [1] | 158066-0000 | BLEEDER SCREW |
106. | [4] | 029010-6350 | BLEEDER SCREW M6P1.0L22 |
118. | [1] | 158527-0200 | NEEDLE VALVE |
119. | [1] | 016500-0710 | O-RING |
123. | [2] | 026512-1640 | GASKET D15.9&12.2T1 |
124. | [2] | 029111-2070 | CAPSULE M12P1.5L10 |
130. | [1] | 029331-8040 | GASKET |
131. | [1] | 158660-0320 | CONTROL VALVE |
135. | [1] | 158515-0700 | INDICATOR PLATE |
137. | [1] | 158515-0800 | INDICATOR PLATE |
140. | [1] | 158820-0620 | POINTER |
142. | [1] | 158820-0620 | POINTER |
158. | [1] | 015040-0880 | BEARING PIN |
190. | [1] | 158017-1000 | GASKET |
200. | [1] | 158599-6920 | SPARE PART |
Include in #2:
105856-2660
as INJECTION-PUMP ASSEMBLY
Cross reference number
Zexel num
Bosch num
Firm num
Name
Information:
start by:a) remove turbocharger 1. Put the turbocharger in position on tool (A). Move tool (A) so the compressor housing is up. 2. For installation alignment purposes, make a mark on the center housing and turbine housing. Bend down the lock plates and remove six bolts (1). If some of the bolts are hard to remove, put penetrating oil on the bolt and hit the flat of the bolt head with a punch and hammer. 3. Lift the center housing and turbine wheel out of the turbine housing. If the assembly is hard to get apart, lift up on the compressor housing and hit the turbine housing with a soft hammer. 4. Remove clamp (2) from the compressor housing. For installation alignment purposes, make a mark on the center housing and the compressor housing. 5. Lift the center housing out of the compressor housing. Put the turbine wheel in tooling (B).6. Remove nut (3) with a universal socket. Remove O-ring (4).
Do not put a side force on the shaft when the nut is removed.
7. Heat the compressor wheel in oil for no more than ten minutes. The temperature of the oil must be 350° 25°F (176° 14°C).
The bearing heating oil used to heat the compressor wheel must have a flash point above 400°F (204°C).
8. Immediately after removing the compressor wheel from the oil, put the center housing in a press and use tooling (C) and (D) to remove the compressor wheel and center housing from the shaft.
Do not let the turbine wheel hit the bottom of the press.
9. Put the turbine wheel in tooling (B) and remove ring (6) and shroud (5). 10. Remove three bolts (7) and the three lock plates from center housing (8). 11. Remove plate (9) with tool (E). Remove the O-ring from plate (9). 12. Remove spacer (10) from plate (9). Remove collar (11) and thrust bearing (15). Remove bearing (12) and put a long dye mark on the top face of the bearing. Use tool (F) to remove rings (16) and (13). Remove bearing (17) and put a short dye mark on the top face of the bearing. Remove ring (14) with tool (F). The dye marks are for identification when installing the bearings.13. Inspect all parts and install new parts if needed. Use Special Instruction Form No. GMG00153-01, Turbocharger Reconditioning, Form No. FEG45138, Analyzing Turbocharger Failure and Video Tape JEG08054 (1/2 inch reel) (JEG09052-cassette), Turbocharger Reconditioning I (AIRESEARCH) for references.Assemble Turbocharger
1. Make sure all oil passages are open and clean. Put clean engine oil on all parts before assembly. 2. Install ring (3) with tool (A). Install bearing (4) with the short dye mark up. Install rings (2) and (1) with tool (A). Rings (1), (2) and (3) must be installed with the round edge toward the bearing. 3. Install shroud (5) on the turbine shaft. Install ring (6). Put 6V2055 High Vacuum Grease on ring (6) and fill the groove for the ring to one half depth all
Do not put a side force on the shaft when the nut is removed.
7. Heat the compressor wheel in oil for no more than ten minutes. The temperature of the oil must be 350° 25°F (176° 14°C).
The bearing heating oil used to heat the compressor wheel must have a flash point above 400°F (204°C).
8. Immediately after removing the compressor wheel from the oil, put the center housing in a press and use tooling (C) and (D) to remove the compressor wheel and center housing from the shaft.
Do not let the turbine wheel hit the bottom of the press.
9. Put the turbine wheel in tooling (B) and remove ring (6) and shroud (5). 10. Remove three bolts (7) and the three lock plates from center housing (8). 11. Remove plate (9) with tool (E). Remove the O-ring from plate (9). 12. Remove spacer (10) from plate (9). Remove collar (11) and thrust bearing (15). Remove bearing (12) and put a long dye mark on the top face of the bearing. Use tool (F) to remove rings (16) and (13). Remove bearing (17) and put a short dye mark on the top face of the bearing. Remove ring (14) with tool (F). The dye marks are for identification when installing the bearings.13. Inspect all parts and install new parts if needed. Use Special Instruction Form No. GMG00153-01, Turbocharger Reconditioning, Form No. FEG45138, Analyzing Turbocharger Failure and Video Tape JEG08054 (1/2 inch reel) (JEG09052-cassette), Turbocharger Reconditioning I (AIRESEARCH) for references.Assemble Turbocharger
1. Make sure all oil passages are open and clean. Put clean engine oil on all parts before assembly. 2. Install ring (3) with tool (A). Install bearing (4) with the short dye mark up. Install rings (2) and (1) with tool (A). Rings (1), (2) and (3) must be installed with the round edge toward the bearing. 3. Install shroud (5) on the turbine shaft. Install ring (6). Put 6V2055 High Vacuum Grease on ring (6) and fill the groove for the ring to one half depth all