Information headless screw
BOSCH
9 421 621 789
9421621789
ZEXEL
154157-2420
1541572420
ISUZU
8944221660
8944221660

Rating:
Include in ###:
Cross reference number
Zexel num
Bosch num
Firm num
Name
154157-2420
9 421 621 789
8944221660 ISUZU
HEADLESS SCREW
C 14GJ SPRING CAPSULE GOV
C 14GJ SPRING CAPSULE GOV
154157-2420
9 421 621 789
224021070A HINO
HEADLESS SCREW
C 14GJ SPRING CAPSULE GOV
C 14GJ SPRING CAPSULE GOV
154157-2420
9 421 621 789
ME716000 MITSUBISHI
HEADLESS SCREW
C 14GJ SPRING CAPSULE GOV
C 14GJ SPRING CAPSULE GOV
Information:
Oil Pump
Disassembly and Inspection of Oil Pump
Measurement of Clearance Between Outer Rotor and Inner Rotor
Measure the clearance between the outer rotor and inner rotor, and, if the limit value is exceeded, replace the pump assembly.
Measurement of clearance between outer rotor and inner rotorMeasurement of Rotor and Case End Play
Measure the rotor and case end play, and, if the limit value is exceeded, replace the pump assembly.
Measurement of rotor and cover end playMeasurement of Clearance Between Outer Rotor and Pump Case
Measure the clearance between the outer rotor and pump case, and, if the limit value is exceeded, replace the pump assembly.
Measure the clearance between the outer rotor and caseReassembly of Oil Pump
Install the outer rotor to the pump case, check alignment mark (indentations) on the pump case cover, and then tighten the bolts. If the alignment marks are not aligned during the reassembly, the pump will not suck oil.
Alignment marks on pump case and pump case coverOil Cooler and Relief Valve
Inspection of Oil Cooler and Relief Valve
Adjustment of Relief Valve
(1) Check the relief valve and valve seat for contact condition, and the spring for fatigue and damage, and replace any defective parts.(2) Measure the valve opening pressure (oil pressure when the engine is running at rated rpm) of the relief valve, and, if the standard valve is exceeded, remove the cap bolt and make an adjustment by increasing or decreasing the shim thickness.Engine oil pressure take-out port next to oil filter
Relief Valve
Disassembly and Inspection of Oil Pump
Measurement of Clearance Between Outer Rotor and Inner Rotor
Measure the clearance between the outer rotor and inner rotor, and, if the limit value is exceeded, replace the pump assembly.
Measurement of clearance between outer rotor and inner rotorMeasurement of Rotor and Case End Play
Measure the rotor and case end play, and, if the limit value is exceeded, replace the pump assembly.
Measurement of rotor and cover end playMeasurement of Clearance Between Outer Rotor and Pump Case
Measure the clearance between the outer rotor and pump case, and, if the limit value is exceeded, replace the pump assembly.
Measure the clearance between the outer rotor and caseReassembly of Oil Pump
Install the outer rotor to the pump case, check alignment mark (indentations) on the pump case cover, and then tighten the bolts. If the alignment marks are not aligned during the reassembly, the pump will not suck oil.
Alignment marks on pump case and pump case coverOil Cooler and Relief Valve
Inspection of Oil Cooler and Relief Valve
Adjustment of Relief Valve
(1) Check the relief valve and valve seat for contact condition, and the spring for fatigue and damage, and replace any defective parts.(2) Measure the valve opening pressure (oil pressure when the engine is running at rated rpm) of the relief valve, and, if the standard valve is exceeded, remove the cap bolt and make an adjustment by increasing or decreasing the shim thickness.Engine oil pressure take-out port next to oil filter
Relief Valve
Have questions with 154157-2420?
Group cross 154157-2420 ZEXEL
Isuzu
154157-2420
9 421 621 789
8944221660
HEADLESS SCREW
Hino
154157-2420
9 421 621 789
224021070A
HEADLESS SCREW
Mitsubishi
154157-2420
9 421 621 789
ME716000
HEADLESS SCREW