Information headless screw
BOSCH
9 421 614 123
9421614123
ZEXEL
154050-7720
1540507720
ISUZU
1157233560
1157233560

Rating:
Include in ###:
Cross reference number
Zexel num
Bosch num
Firm num
Name
154050-7720
9 421 614 123
1157233560 ISUZU
HEADLESS SCREW
C 14GJ SPRING CAPSULE GOV
C 14GJ SPRING CAPSULE GOV
154050-7720
9 421 614 123
224021210A HINO
HEADLESS SCREW
C 14GJ SPRING CAPSULE GOV
C 14GJ SPRING CAPSULE GOV
154050-7720
9 421 614 123
ME748458 MITSUBISHI
HEADLESS SCREW
C 14GJ SPRING CAPSULE GOV
C 14GJ SPRING CAPSULE GOV
154050-7720
9 421 614 123
1937699218 NISSAN-DIESEL
HEADLESS SCREW
C 14GJ SPRING CAPSULE GOV
C 14GJ SPRING CAPSULE GOV
Information:
Illustration 1 g00565418
4W-8471 Time Delay Relay
Use a 6V-7070 Digital Multimeter, a stopwatch, and a battery (8 volts to 40 volts) for this test.
Connect the positive lead of the voltage source to terminal (TD-4) of the time delay relay. Connect the negative lead to terminal (TD-3). If the test is done on an engine, the start/stop switch must be in the STOP position in order to power terminal (TD-6). All connections must be maintained until the tests are completed.
Use the multimeter to determine continuity. Compare the measurements to the following table.
Table 1
Terminals     Relay Position    
5-6     Closed    
6-7     Open    
Connect the positive lead of the voltage source to terminal (TD-1). If the time delay relay is tested on the engine do not leave the voltage source hooked to terminal (TD-1) for more than 60 seconds. The fuel shutoff solenoid will be energized. Use the multimeter to determine continuity. Compare the measurements to the following table.
Table 2
Terminals     Relay Position    
5-6     Open    
6-7     Closed    
Remove the positive lead of the voltage source from terminal (TD-1). Use the stopwatch to measure the time that is needed for the position of the relay to change. Use the multimeter to determine continuity. Compare the measurements to the following table.
Table 3
Terminals     Delay Time of Relay Position    
0 to 60 seconds 80 seconds or more    
5-6     Open     Closed    
6-7     Closed     Open    Note: If a jumper is normally installed across terminals (TD-2) and (TD-3), the jumper must be removed before performing Step 5.
Connect the positive lead of the voltage source to terminal (TD-2). If the time delay relay is tested on the engine, do not leave the voltage source on terminal (TD-2) for more than 60 seconds. The fuel shutoff solenoid will be energized. Use the stopwatch to measure the time that is needed for the position of the relay to change. Use the multimeter to determine continuity. Compare the measurements to the following table.
Table 4
Terminals     Delay Time of Relay Position    
0 to 8 seconds 10 seconds or more    
5-6     Closed     Open    
6-7     Open     Closed    
Remove the positive lead of the voltage source from terminal (TD-1). Use the stopwatch to measure the time that is needed for the position of the relay to change. Use the multimeter to determine continuity. Compare the measurements to the following table.
Table 5
Terminals     Delay Time of Relay Position    
0 to 60 seconds 80 seconds or more    
5-6     Open     Closed    
6-7     Closed     Open    
Remove the voltage source from terminal (TD-4). Use the multimeter to determine continuity. Compare the measurements to the following table.
Table 6
Terminals     Relay Position    
5-6     Closed    
6-7     Open    
Have questions with 154050-7720?
Group cross 154050-7720 ZEXEL
Isuzu
154050-7720
9 421 614 123
1157233560
HEADLESS SCREW
Hino
154050-7720
9 421 614 123
224021210A
HEADLESS SCREW
Mitsubishi
154050-7720
9 421 614 123
ME748458
HEADLESS SCREW
Nissan-Diesel
154050-7720
9 421 614 123
1937699218
HEADLESS SCREW