130512-0620 ZEXEL 9 411 614 425 BOSCH HEADLESS SCREW 9411614425 1305120620 5157292460


 

Information headless screw

BOSCH 9 411 614 425 9411614425
ZEXEL 130512-0620 1305120620
ISUZU 5157292460 5157292460
130512-0620 HEADLESS SCREW
Rating:
49
Buy HEADLESS SCREW 130512-0620 zexel genuine, new aftermarket engine parts with delivery

Include in ###:

Number on scheme 517
HEADLESS SCREW
1043003062 as HEADLESS SCREW

Cross reference number

Zexel num
Bosch num
Firm num
Name
130512-0620 
9 411 614 425 
5157292460  ISUZU
HEADLESS SCREW
C 14FK SPRING CAPSULE parts(S-K) Others
130512-0620 
9 411 614 425 
1312964320  ISHIKAWAJIMA-S
HEADLESS SCREW
C 14FK SPRING CAPSULE parts(S-K) Others




Information:

Start By:a. remove valve covers 1. Remove bolts (1) that hold the valve cover bases to the cylinder head assembly. Remove valve cover bases (2). 2. Use tool (A) to loosen fuel injection line (3) from fuel injection nozzle (4). 3. Use tool (B) to loosen the nut at the fuel injection line adapter end. Remove inner fuel injection lines (3). Install caps and plugs on all fuel injection line openings to keep dirt out of the fuel system. 4. Remove bolts (5) that hold the rocker shaft assemblies to the cylinder head assembly.5. Remove rocker shaft assemblies (6). 6. Put identification marks on the push rods as to their location in the engine. Remove push rods (7). 7. Put identification marks on the bridges as to their location in the engine. Remove bridges (8) from the dowels on the cylinder head assembly.Install Rocker Shaft Assemblies And Push Rods
1. Put clean engine oil on the bridges and dowels. Install the original bridges in their respective locations. New bridges can be mixed.2. Install bridges (8) on the bridge dowels. While firmly pressing 0.5 to 4.5 kg (1 to 10 lb.) straight down on the top contact surface of the bridge, turn the adjusting screw clockwise until contact is made with the valve stem. Turn the screw an additional 20 ° to 30 ° (1/3 to 1/2 of 1 hex on nut). This will straighten the dowel in the guide and compensate for the slack in the threads. Hold the adjusting screw in this position, and tighten the locknut to a torque of 30 4 N m (22 3 lb.ft.). Install original push rods in their respective locations in the engine. New push rods can be mixed.3. Install push rods (7). 4. Put rocker shaft assemblies (6) in position on the cylinder head assembly.5. Put clean engine oil on the threads of bolts (5) that hold the shaft assemblies in place. Tighten the bolts first to a torque of 270 25 N m (200 18 lb.ft.). Start with the bolt in the center of the rocker shaft assembly. Tighten the bolts again to a torque of 450 20 N m (330 15 lb.ft.). Tighten the bolts again by hand to a torque of 450 20 N m (330 15 lb.ft.).
Do not cause damage to the O-ring seals on the inner fuel lines.
6. Install inner fuel injection lines (3). Tighten the fuel injection line adapter nuts (9) to a torque of 40 7 N m (30 5 lb.ft.) with tool (B).7. Tighten fuel injection line nut (10) to a torque of 40 7 N m (30 5 lb.ft.) with tool (A).8. Make adjustments to the valves until the intake valve clearance is 0.38 mm (.015 in.) and the exhaust valve clearance is 0.76 mm (.030 in.). See Valve Clearance Setting in Testing And Adjusting. Tighten the locknut to a torque of 30 4 N m (22 3

Have questions with 130512-0620?





Group cross 130512-0620 ZEXEL

9 411 616 706 
 
COILED SPRING

Isuzu 

130512-0620  
9 411 614 425 
5157292460 
HEADLESS SCREW

Ishikawajima-S 

130512-0620  
9 411 614 425 
1312964320 
HEADLESS SCREW
Back to top