105931-9012 ZEXEL F 019 Z5E 806 BOSCH GOVERNOR f019z5e806 1059319012 1157706342


 

Information governor

BOSCH F 019 Z5E 806 f019z5e806
ZEXEL 105931-9012 1059319012
ISUZU 1157706342 1157706342
105931-9012 GOVERNOR
Rating:
28
Buy GOVERNOR 105931-9012 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
105931-9012 
F 019 Z5E 806 
NP-EP/RLD240-1500A1FBL 
1157706342  ISUZU
GOVERNOR
K




Information:

Turn the engine to (TDC) top center compression stroke for the No. 1 piston and install crankshaft flywheel timing pin. This will help when timing the camshaft when installing.
Wire used to hold cam roller followers up off camshaft. It is not necessary to remove the cylinder head. With the cylinder head in place, just wire the cam roller followers up off the camshaft and then remove the camshaft. 1. Remove camshaft retainer bolt (1) and remove camshaft assembly (2). The following steps are for the installation of the camshaft assembly.
Typical Example When installing the camshaft, rotating it both clockwise and counter clockwise directions will help prevent it from binding in the bearing bores.2. Put engine oil on the lobes and journals of the camshaft. Carefully install the camshaft. When installing the camshaft, be sure the number one cylinder is at (TDC) top dead center of the compression stroke with the timing pin installed in the flywheel. Camshaft timing is very important. Cam gear timing marks must line up with idler gear timing marks as illustrated. For more information about timing of engine, refer to Specifications module, Form No. SENR3908.
Camshaft Timing3. With the camshaft properly timed and positioned, install retaining bolt (1). Tighten bolt (1) to a torque of 48 7 N m (37 5 lb ft). Remove the wire that was used to hold the cam roller followers up off the camshaft.End By:a. install fuel transfer pumpb. install front coverc. install front pulley and damperd. install fuel injectorse. install rocker arm assemblies and push rodsDisassembly & Assembly of Camshaft And Gear Assembly
Start By:a. remove camshaft assembly 1. Wrap camshaft portion of camshaft and gear assembly (1) with paper towels to protect the camshaft from being damaged. 2. Remove six bolts (2). Remove timing/speed sensor ring gear (3). The timing/speed ring gear is located on gear (4) by dowel (6). Care must be taken not to damage timing/speed sensor ring gear (3) when removing. Using the prybar, work around the ring gear and pry the ring gear off a little at a time.
Care must be taken not to allow the camshaft to fall to the floor when pressing it from the gear. Also be sure that a camshaft lobe does not catch on the press plates.
3. Place camshaft and gear assembly (1) in a press. Press camshaft (5) from gear (4). The following steps are for the assembly of the camshaft and the gear assembly. 4. To install gear (4) on camshaft (5), place gear in the oven at 300°C (572°F) for 30 minutes and then install. Be sure the woodruff key is properly aligned and the gear is flush with the camshaft flange. 5. Align timing gear sensor ring gear (3) with dowel (6). "Front" is marked and visible when installing timing/speed ring gear sensor. Care must be taken not to damage the timing/speed sensor ring gear when installing. Using a mallet tap around the ring gear and drive it on a little at a

Have questions with 105931-9012?





Group cross 105931-9012 ZEXEL

Isuzu 

 
1157705940 
GOVERNOR
9 420 613 068 
NP-EP/RLD260-1500A1FBL 
1157705941 
GOVERNOR
 
1157706340 
GOVERNOR
 
 
GOVERNOR

Isuzu 

105931-9012  
F 019 Z5E 806 
NP-EP/RLD240-1500A1FBL 
1157706342 
GOVERNOR
9 420 612 238 
 
GOVERNOR
 
 
GOVERNOR

Mitsubishi 

F 019 Z1E 508 
NP-EP/RLD275-1550A1FFL 
ME738747 
GOVERNOR
9 420 613 630 
NP-EP/RLD275-1550A1FFL 
ME730750 
GOVERNOR
 
ME730755 
GOVERNOR
9 420 613 631 
NP-EP/RLD275-1550A1EFL 
 
GOVERNOR

Mitsubishi 

 
ME730756 
GOVERNOR
9 420 613 632 
NP-EP/RLD275-1550A1EFL 
 
GOVERNOR

Mitsubishi 

9 420 613 633 
NP-EP/RLD275-1550A1FXL 
ME730763 
GOVERNOR
F 019 Z5E 807 
NP-EP/RLD275-1550A1FFL 
ME730768 
GOVERNOR
 
 

Isuzu 

9 420 613 930 
1157706370 
GOVERNOR
9 420 613 931 
1157706371 
GOVERNOR
9 420 612 683 
1157706372 
GOVERNOR
9 420 612 684 
1157706373 
GOVERNOR
9 420 612 685 
NP-EP/RLD240-1500A1FXL 
1157706374 
GOVERNOR
Back to top