105931-6680 ZEXEL F 019 Z5E 767 BOSCH GOVERNOR f019z5e767 1059316680 me727100


 

Information governor

BOSCH F 019 Z5E 767 f019z5e767
ZEXEL 105931-6680 1059316680
MITSUBISHI ME727100 me727100
105931-6680 GOVERNOR
Rating:
79
Buy GOVERNOR 105931-6680 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
105931-6680 
F 019 Z5E 767 
NP-EP/RLD275-1550A1FFL 
ME727100  MITSUBISHI
GOVERNOR
K




Information:

USE FUEL CONSUMPTION, SERVICE HOURS OR TIME INTERVAL, WHICHEVER OCCURS FIRST. Performance of all lubrication and maintenance items in the Maintenance Schedule is the owners' responsibility.Daily
Walk-Around Inspection - Inspect for leaks and loose connections Engine Crankcase - Check oil level Cooling System - Check coolant level Air Cleaner Indicator - Test Air Starting Motor (If Equipped) - Check/fill oiler bowlEvery 18 950 L (5000 gal) of Fuel or 125 Hours*
Scheduled Oil Sampling (S O S) Analysis - Obtain sample Engine Oil & Filters - Change oil and oil filter(s) Fuel System - Drain water/sediment Cooling System - Test Crankcase Breathers - Clean Engine Valve Lash (At First Oil Change Only) - Check/AdjustEvery 37 900 L (10,000 gal) of Fuel or 250 Hours*
Batteries - Clean/Check electrolyte level Belts, Hoses and Clamps - Inspect/Replace if necessary Engine Air Cleaners - Replace Engine Speed Sensors - Inspect/clean magnetic pick-upEvery 151 600 L (40,000 gal) of Fuel or 1000 Hours*
Engine Protection Devices - Inspect for proper operation (Check at least twice per year) Engine Valve Lash - Check/Adjust Turbochargers - Inspect for proper operation Engine Mounts and Crankshaft Vibration Damper - Inspect/checkEvery 341 100 L (90,000 gal) of Fuel or 2250 Hours*
Connecting Rod Bearings - ReplaceEvery 454 800 L (120,000 gal) of Fuel or 3000 Hours or Two Years*
Cooling System - Clean/Flush/replace thermostats and gasketsOverhaul Every 511 650 L (135,000 gal) of Fuel or 5400 Hours*
To minimize downtime and provide you with the lowest cost and highest value, Caterpillar recommends that the engine be overhauled before failure by scheduling an overhaul with your Caterpillar dealer. Refer to the Overhaul section in this manual on page 85. Top End Overhaul After Failure Overhaul Starting Motor - Inspect for proper operation Alternator - Inspect for proper operation Engine Speed Sensors - Inspect/clean/test*First Perform Previous Service Hour Items Caterpillar suggests that fuel consumption be used as the preferred method of determining maintenance intervals. Fuel consumption/hours will vary depending on the proper application of your engine rating and adherence to recommended maintenance procedures.

Have questions with 105931-6680?





Group cross 105931-6680 ZEXEL

9 420 612 984 
 
GOVERNOR

Isuzu 

9 420 612 985 
NP-EP/RLD240-1500A1FFL 
1157704180 
GOVERNOR
 
 

Mitsubishi 

F 019 Z5E 765 
NP-EP/RLD275-1550A1EFL 
ME727087 
GOVERNOR
 
ME727110 
GOVERNOR
9 420 614 313 
NP-EP/RLD275-1550A1EBL 
 
GOVERNOR

Isuzu 

F 019 Z5E 766 
NP-EP/RLD275-1645A1FKL 
8970205250 
GOVERNOR

Mitsubishi 

9 420 613 596 
NP-EP/RLD275-1550A1FFL 
ME727098 
GOVERNOR
9 420 613 597 
NP-EP/RLD275-1550A1FFL 
ME727099 
GOVERNOR
105931-6680  
F 019 Z5E 767 
NP-EP/RLD275-1550A1FFL 
ME727100 
GOVERNOR
 
ME727091 
GOVERNOR
F 019 Z5E 768 
NP-EP/RLD275-1550A1FFL 
ME730359 
GOVERNOR
Back to top