105923-2470 ZEXEL GOVERNOR Cross 1059232470 1157709080


 

Information governor

ZEXEL 105923-2470 1059232470
ISUZU 1157709080 1157709080
105923-2470 GOVERNOR
Rating:
33
Buy GOVERNOR 105923-2470 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
105923-2470 
105923-2471 
 
1157709080  ISUZU
GOVERNOR
* K




Information:

Start By:a. remove timing gear coverb. remove flywheel housing*c. remove engine oil cooler**d. remove oil filter base***Put the engine in time before the flywheel housing is removed. See the topic, "Finding Top Center Compression Position For No. 1 Piston" in Testing & Adjusting Manual SENR6471.**These operations must be done to install Tool (A) on the engine.
Typical Example1. Fasten the engine on Tool (A). The weight of the engine is 1362 kg (3000 lb).2. Remove the bolts and nuts that hold air cleaner group (1), pipe assembly (3), bracket assembly (4) and lifting plate (5) as a unit to the engine. Fasten a hoist to the unit and remove it from the engine. The weight of the unit is approximately 39 kg (85 lb).3. Remove tube assembly (2) from the engine.
Typical Example4. Install the two bolts to hold the primary fuel filter bracket (6) in place while the engine is turned with Tool (A). 5. Turn the engine to the position shown with Tool (A). Remove rod bearing caps (8) from the ends of the connecting rods. Push the connecting rods away from the crankshaft.6. Remove the bolts and remove main bearing caps (7) from the crankshaft. 7. Remove thrust plates (9) from the center main bearing journal. 8. Fasten a hoist to crankshaft (10) with tooling (B). Remove crankshaft (10) from the engine block. The weight of the crankshaft is 159 kg (350 lb). 9. Use Tool (C) to remove outer gear (2) from the end of the crankshaft.10. Use a hammer and chisel to remove the spacer from the crankshaft. 11. Use Tool (D) to remove the gear alignment dowel from the crankshaft.12. Use Tool (C) to remove inner gear (11) from the end of the crankshaft. If new main bearings are not to be installed, put identification on the old main bearings as to their location in the cylinder block and to which main bearings caps they belong.13. Remove main bearings (13) from the cylinder block and the main bearing caps.Install Crankshaft
1. If the dowel was removed from the flywheel end of the crankshaft, install it in the crankshaft to a maximum dimension of 6.4 mm (.25 in).2. Heat the crankshaft gears to a maximum temperature of 205° C (400° F).3. The centerline of inner gear key must be in alignment with the centerline of the dowel hole within 0.51 mm (.020 in). Install crankshaft inner gear (14) on the crankshaft.4. Install the spacer on the crankshaft.5. Install the dowel in the crankshaft. The dowel must be extended no more than 4.1 0.5 mm (.16 .02 in) from the surface of the crankshaft. The dowel in the crankshaft must be in alignment with the notch in crankshaft gear (15).6. Make sure the "V" mark on the crankshaft gear is toward the outside, and install crankshaft gear (15). 7. Thoroughly clean the cylinder block and main bearing caps.
Make sure the upper and lower halves of the main bearings are installed so the bearing tabs fit

Have questions with 105923-2470?





Group cross 105923-2470 ZEXEL

Mitsubishi 

 
ME741686 
GOVERNOR
F 019 Z5E 593 
NP-EP/RLD225-1250T6JFR 
ME755086 
GOVERNOR
F 019 Z9E 108 
ME741700 
GOVERNOR
F 019 Z5E 594 
NP-EP/RLD225-1200P6JFR 
ME748560 
GOVERNOR

Hino 

9 420 611 477 
223008950A 
GOVERNOR
 
 
GOVERNOR
 
 
GOVERNOR

Mitsubishi 

9 420 611 051 
ME741701 
GOVERNOR
F 019 Z5E 595 
NP-EP/RLD225-1200P6JFR 
ME755490 
GOVERNOR
F 019 Z9E 244 
ME741702 
GOVERNOR
F 019 Z5E 596 
NP-EP/RLD225-1250T6JFR 
ME755098 
GOVERNOR
9 420 611 052 
NP-EP/RLD225-1200P6JXR 
 
GOVERNOR

Isuzu 

F 019 Z5E 597 
NP-EP/RLD225-1250P6JFR 
1157709100 
GOVERNOR
105923-2470  

105923-2471 
 
1157709080 
GOVERNOR
9 420 611 799 
NP-EP/RLD250-1200P6JXR 
1157709081 
GOVERNOR
 
1157709090 
GOVERNOR
9 420 614 338 
NP-EP/RLD250-1200P6JYR 
1157709091 
GOVERNOR
 
 

 
 

Back to top