105921-8652 ZEXEL F 019 Z5E 471 BOSCH GOVERNOR f019z5e471 1059218652 19102z5508


 

Information governor

BOSCH F 019 Z5E 471 f019z5e471
ZEXEL 105921-8652 1059218652
NISSAN-DIESEL 19102Z5508 19102z5508
105921-8652 GOVERNOR
Rating:
43
Buy GOVERNOR 105921-8652 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
105921-8652 
F 019 Z5E 471 
NP-EP/RLD275-1650A1FFR 
19102Z5508  NISSAN-DIESEL
GOVERNOR
* K




Information:

3. Inspection
Inspection points4. Assembly
Assembly sequenceFollow the reverse of disassembly and use the procedure that follows. Assembly procedure (1) Barrel installationPut each barrel in position in the housing with its slot in alignment with the dowel of the housing and put it straight down into the bore. If the slot in the barrel is not aligned with the dowel of the housing, the O-ring will not seat correctly (still visible) after the delivery valve holder has been installed.
Installing barrels(2) Delivery valve installationInstall the delivery valve, gasket, spring and O-ring on the barrel and tighten the delivery valve holder finger tight. Do this step for remainder of the delivery valves.
a) Any time the injection pump is disassembled, a new O-ring must be installed.b) Make sure the threads of the delivery valve holder do not cause damage to the O-rings.
Installing delivery valves(3) Control sleeve installation (a) Install each control sleeve with the center tooth in alignment with the line mark of the control rack.
Installing control sleeves(b) Put the plungers in position in the barrels.
Make sure the notch in the plunger is toward the adjusting plate.
Installing plungers(4) Tappet installationMove the control rack back and forth while pushing down on each tappet to align the slot in the tappet with the hole in the housing for the tappet guide pin. Install the lock plates and tappet guide pins in position.
Any time the injection pump is disassembled, new lock plates must be used.
Installing tappets(5) Delivery valve holder installation Put the delivery valve holders in position and tighten them to the specified torque.
Do not over tighten the delivery valve holders. This can put end force on the barrels, resulting in a failure of the plungers to move freely. If the holders are not tightened to the specified torque, engine oil would leak in the injection pump.
Tightening delivery valve holders(6) Inspection after assembly (a) After the injection pump has been assembled, check to see if the control rack moves freely without any binding or catching.(b) If the control rack fails to move freely, the possible causes are:1) Pumping element(s) sticking2) Foreign particles lodged between control rack and sleeves3) Over-tightening of delivery valve holder(s)Disassemble and check the injection pump to locate the cause of the trouble. (c) After the injection pump has been finally assembled, check the injection timing.
Checking control rack movementGOVERNOR
1. Disassembly and inspection
Disassembly sequence and inspection points1 Tie rod spring2 Tie rod3 Speed control lever4 Spring pin5 Grooved pin6 Governor shaft (Remove 7 thru 11 as an assembly.)7 Governor lever8 Start spring9 Tension lever10 Governor spring11 Governor spring lever12 Governor case2. Assembly (1) Install the levers in position.
Installing governor levers(2) Put O-ring on the governor shaft. (3) Put the governor shaft in position in the governor case and put the levers on the governor shaft. (4) Install the grooved pin and spring pin in position with a hammer.(5) Install the tie rod and tie rod spring in position.
Assembling governor3. Torque spring set installation The torque spring set is to be installed and adjusted after an

Have questions with 105921-8652?





Group cross 105921-8652 ZEXEL

 
 

 
 

Nissan-Diesel 

9 420 610 873 
19101Z6578 
GOVERNOR
F 01G 29N 02T 
19101Z6905 
GOVERNOR
F 019 Z5E 469 
NP-EP/RLD275-1650A1FFR 
19102Z5504 
GOVERNOR
 
19101Z6579 
GOVERNOR
 
19101Z6807 
GOVERNOR
 
19101Z6579 
GOVERNOR
F 019 Z5E 470 
NP-EP/RLD275-1600A1CFR 
19102Z5505 
GOVERNOR
9 420 610 874 
19101Z6605 
GOVERNOR
9 420 614 466 
NP-EP/RLD275-1650A1FFR 
19101Z6912 
GOVERNOR
F 01G 29N 02U 
19101Z6606 
GOVERNOR
F 01G 29N 02V 
19101Z6907 
GOVERNOR
105921-8652  
F 019 Z5E 471 
NP-EP/RLD275-1650A1FFR 
19102Z5508 
GOVERNOR
9 420 610 875 
NP-EP/RLD275-1650A1FFR 
19101Z6608 
GOVERNOR
9 420 610 876 
19101Z6607 
GOVERNOR
9 420 611 767 
19101Z6808 
GOVERNOR
9 420 611 767 
19101Z6607 
GOVERNOR
F 019 Z5E 472 
NP-EP/RLD275-1600A1CFR 
19102Z5509 
GOVERNOR

Mitsubishi 

9 420 610 426 
NP-EP/RLD325-1670A1GXR 
ME741598 
GOVERNOR

Nissan-Diesel 

9 420 610 877 
NP-EP/RLD275-1500A1FYR 
1910195360 
GOVERNOR
Back to top