105400-4400 ZEXEL GOVERNOR Cross 1054004400 8944419440


 

Information governor

ZEXEL 105400-4400 1054004400
ISUZU 8944419440 8944419440
105400-4400 GOVERNOR
Rating:
38
Buy GOVERNOR 105400-4400 zexel genuine, new aftermarket engine parts with delivery

Include in #1:

101492-0210 as GOVERNOR

Cross reference number

Zexel num
Bosch num
Firm num
Name
105400-4400 
105400-4401 
 
8944419440  ISUZU
GOVERNOR
*




Information:

The battery circuit is an electrical load on the charging unit. The load is variable because of the condition of the charge in the battery. Damage to the charging unit will result if the connections (either positive or negative) between the battery and charging unit are broken while the charging unit is in operation. This is because the battery load is lost and there is an increase in charging voltage. High voltage will damage, not only the charging unit, but also the regulator and other electrical components.Load test a battery that does not hold a charge when in use. To do this, put a resistance across the main connections (terminals) of the battery. For a 6, 8 or 12V battery, use a test load of three times the ampere/hour rating (the maximum test load on any battery is 500 amperes). Let the test load remove the charge (discharge) of the battery for 15 seconds and with the test load still applied, test the battery voltage. A 6V battery in good condition will show 4.5V; and 8V battery will show 6V; a 12V battery will show 9V. Each cell of a battery in good condition must show 1.6V on either a 6, 8 to 12V battery.Charging System
The condition of charge in the battery at each regular inspection will show if the charging system operates correctly. An adjustment is necessary when the battery is constantly in a low condition of charge or a large amount of water is needed (more than one ounce of water per cell per week or per every 50 service hours).When it is possible, make a test of the charging unit and voltage regulator on the engine, and use wiring and components that are a permanent part of the system. Off-engine (bench) testing will give a test of the charging unit and voltage regulator operation. This testing will give an indication of needed repair. After repairs are made, again make a test to give proof that the units are repaired to their original condition of operation.Before the start of on-engine testing, the charging system and battery must be checked as shown in the steps that follow:1. Battery must be at least 75% (1.225 Sp Gr) fully charged and held tightly in place. The battery holder must not put too much stress on the battery.2. Cables between the battery, starter and engine ground must be the correct size. Wires and cables must be free of corrosion and have cable support clamps to prevent stress on battery connections (terminals).3. Leads, junctions, switches and panel instruments that have direct relation to the charging circuit must give correct circuit control.4. Inspect the drive components for the charging unit to be sure they are free of grease and oil and have the ability to operate the charging unit.Alternator
Delco-Remy
No adjustment can be made

Have questions with 105400-4400?





Group cross 105400-4400 ZEXEL

Isuzu 

105400-4400  

105400-4401 
 
8944419440 
GOVERNOR
9 420 612 487 
NP-EP/RSV200-1300AQ44A312 
8944419441 
GOVERNOR
 
 

F 019 Z2F 601 
NP-EP/RSV200-1600AQ21A312 
 
GOVERNOR
F 019 Z1E 012 
NP-EP/RSV200-1350AQ49A312 
 
GOVERNOR
F 019 Z2F 289 
NP-EP/RSV200-1450AQ43A312 
 
GOVERNOR
F 019 Z2F 290 
NP-EP/RSV200-1350AQ49A302 
 
GOVERNOR
F 019 Z9E 492 
NP-EP/RSV200-1350AQ49A302 
 
GOVERNOR
F 019 Z2F 151 
NP-EP/RSV200-1200AQ36A312 
 
GOVERNOR
 
 

 
 

Back to top