105400-2940 ZEXEL F 019 Z4E 167 BOSCH GOVERNOR f019z4e167 1054002940 19109z5511


 

Information governor

BOSCH F 019 Z4E 167 f019z4e167
ZEXEL 105400-2940 1054002940
NISSAN-DIESEL 19109Z5511 19109z5511
105400-2940 GOVERNOR
Rating:
72
Buy GOVERNOR 105400-2940 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
105400-2940 
F 019 Z4E 167 
NP-EP/RSV200-1300AQ44A302 
19109Z5511  NISSAN-DIESEL
GOVERNOR
K




Information:

1. Remove the tube (1) from the turbocharger to the aftercooler.2. Remove the valve cover (2) from the engine.3. Turn the crankshaft until the No. 1 piston is at top center on the compression stroke. See LOCATING TOP CENTER COMPRESSION POSITION FOR THE NO. 1 PISTON in TESTING AND ADJUSTING. 4. Remove the camshaft driveshaft cover at the top of the flywheel housing. Install a 3/8" - 16 NC forged eyebolt in the driveshaft (3) and remove the driveshaft. On engines with a BrakeSaver, remove two plugs (4) from the flywheel housing.5. Disconnect glow plug wiring harness from the glow plugs and valve cover base. Remove the inner fuel injection lines. Put plugs or caps on all fuel lines and openings. 6. Remove the fifteen other bolts and locks (seven each side and one in rear). Remove two of the glow plug wiring harness mounting bolts and install two 3/8" - 16 NC forged eyebolts. Pull the camshafts (5) off dowels. Fasten a hoist and remove the camshafts (5). Weight of the camshafts is 100 lb. (45 kg).Install Camshafts
1. Adjust all of the camshaft followers to give maximum clearance. 2. Put the camshaft phasing gear timing marks (1) together and in a horizontal plane. 3. Install two 3/8" - 16 forged eyebolts. Fasten a hoist and install the camshafts (2) on the engine. Install the camshaft retaining bolts and locks.
Never install the camshafts if the No. 1 piston is not at top center on the compression stroke. Damage to the engine can be the result if No. 1 piston is not in correct position.
4. Remove the eyebolts and install the glow plug wiring harness mounting bolts.5. Install the inner fuel injection lines. Tighten retaining nuts to 30 5 lb.ft. (40.7 6.8 N m).6. Connect the glow plug wiring to the plugs and to the valve cover base.7. Install the camshaft driveshaft with the alignment (blind) spline on top. Install driveshaft cover.8. Remove the timing bolt from the flywheel. Install the plug in the flywheel housing and timing bolt in the cover.9. Adjust the inlet valve clearance to .018 in. (0.46 mm) and the exhaust valve clearance to .030 in. (0.76 mm). 10. Install the valve cover (3) and the tube (4) from the turbocharger to the aftercooler.

Have questions with 105400-2940?





Group cross 105400-2940 ZEXEL

Nissan-Diesel 

F 019 Z4E 165 
NP-EP/RSV200-1300AQ39A302 
19109Z5512 
GOVERNOR
 
 

Hino 

F 019 Z1E 267 
223201680A 
GOVERNOR

Nissan-Diesel 

F 019 Z4E 166 
NP-EP/RSV200-1600AQ21A312 
19109Z5509 
GOVERNOR
105400-2940  
F 019 Z4E 167 
NP-EP/RSV200-1300AQ44A302 
19109Z5511 
GOVERNOR

Yanmar 

9 420 612 734 
NP-EP/RSV200-1450AQ43A312 
12741661550 
GOVERNOR

Nissan-Diesel 

 
19109Z5513 
GOVERNOR
9 420 614 770 
NP-EP/RSV200-1300AQ39A302 
1910990167 
GOVERNOR
F 019 Z1E 564 
NP-EP/RSV300-2000AQ31A302 
1910990168 
GOVERNOR

Hino 

F 019 Z1E 268 
NP-EP/RSV200-1450AQ43A22 
223201730A 
GOVERNOR
Back to top