105400-2730 ZEXEL GOVERNOR Cross 1054002730 19109z5506


 

Information governor

ZEXEL 105400-2730 1054002730
NISSAN-DIESEL 19109Z5506 19109z5506
105400-2730 GOVERNOR
Rating:
51
Buy GOVERNOR 105400-2730 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
105400-2730 
 
19109Z5506  NISSAN-DIESEL
GOVERNOR
* K




Information:

1. Remove two bolts (1) from the top of the water pump. Loosen two bolts (2) in the water pump.
TYPICAL EXAMPLE2. Remove oil supply line (3) from the turbocharger. Remove oil return line (4) from the turbocharger.
TYPICAL EXAMPLE3. Remove the bolts (5) that hold the cylinder head to the cylinder block.
TYPICAL EXAMPLE4. Fasten a hoist to the cylinder head assembly (6). Remove the cylinder head assembly from the block. Weight of the assembly is 290 lb. (131 kg). Remove O-ring seal from hollow dowel. Remove cylinder head gasket (7) and water ferrules.
Do not put the cylinder head down on a flat surface. This can cause damage to the fuel injection valves.
Always install a new gasket between spacer plate and cylinder block before cylinder head is installed. See REMOVE SPACER PLATE.Install Cylinder Head
TYPICAL EXAMPLE1. Thoroughly clean the spacer plate and bottom surface of the cylinder head. Install a new head gasket (2), water ferrules (1) and O-ring seal (3) on the hollow dowel. Be sure a new gasket has been installed between spacer plate and cylinder block. See INSTALL SPACER PLATE.2. Fasten a hoist and install the cylinder head assembly (4) on the cylinder block. 3. Install the push rods and put the rocker shaft in position on the cylinder head. Put 5P3931 Anti-Seize Compound on the threads of the cylinder head and rocker shaft bolts. Install the bolts and washers and tighten the bolts as follows: 1. Tighten all bolts in number sequence to a torque of 115 lb. ft. (155 N m).2. Again tighten all bolts in number sequence to a torque of 185 13 lb. ft. (250 17 N m).3. Again tighten all bolts in number sequence (hand torque only) to a torque of 185 13 lb. ft. (250 17 N m).4. Tighten all bolts in letter sequence to a torque of 32 5 lb. ft. (43 7 N m).4. Make adjustment of valves to have a clearance of .015 in. (0.38 mm) for intake and .025 in. (0.64 mm) for exhaust.
TYPICAL EXAMPLE5. Install oil return line (6) on the turbocharger.6. Install oil supply line (5) on the turbocharger. 7. Tighten the two bolts (8) in the water pump.8. Install the two bolts (7) that hold the water pump to the cylinder head.end by: a) install fuel injection lines

Have questions with 105400-2730?





Group cross 105400-2730 ZEXEL

Nissan-Diesel 

F 019 Z4E 157 
NP_EP/RSV200_1450AQ2A302NP235 
19109Z5502 
GOVERNOR
F 019 Z4E 158 
NP_EP/RSV300_1850AQ22A302NP236 
1910990112 
GOVERNOR
F 019 Z4E 159 
NP_EP/RSV300_1850AQ22A302NP237 
1910990113 
GOVERNOR
105400-2730  
 
19109Z5506 
GOVERNOR
 
1910990115 
GOVERNOR
 
 

Nissan-Diesel 

F 019 Z4E 160 
NP_EP/RSV200_1300AQ39A302NP240 
1910995000 
GOVERNOR

Yanmar 

9 420 612 733 
NP-EP/RSV200-1450AQ43A312NP78 
12761661550 
GOVERNOR
 
12761061540 
GOVERNOR
 
 

Back to top