105306-0970 ZEXEL GOVERNOR Cross 1053060970 me723223


 

Information governor

ZEXEL 105306-0970 1053060970
MITSUBISHI ME723223 me723223
105306-0970 GOVERNOR
Rating:
69
Buy GOVERNOR 105306-0970 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
105306-0970 
105306-0971 
 
ME723223  MITSUBISHI
GOVERNOR




Information:


This Revised Service Letter replaces the 20Nov2008 Service Letter. Changes have been made to Parts Needed Description.
TERMINATION DATE
30Nov2010
PROBLEM
The existing governor linkage can separate at the riveted joint on certain C1.6 engines. If the existing governor linkage fails, it can result in loss of engine speed governing.
AFFECTED PRODUCT
Model Identification Number
C1.6 C1M00596-00703, 740-883
PARTS NEEDED
Qty
Part Number Description
1 2152619 GASKET
1 2908469 LEVER AS
1 2952235 GASKET
In order to allow equitable parts availability to all participating dealers, please limit your initial parts order to not exceed 9% of dealership population. This is an initial order recommendation only, and the ultimate responsibility for ordering the total number of parts needed to satisfy the program lies with the dealer.
ACTION REQUIRED
Gain access to engine front cover and fuel pump. Replace the existing governor linkage using the following steps.
Refer to service manual module RENR2424.
Refer to the attached Rework Procedure.
SERVICE CLAIM ALLOWANCES
Product smu/age whichever comes first Caterpillar Dealer Suggested Customer Suggested
Parts % Labor Hrs% Parts % Labor Hrs% Parts % Labor Hrs%
0-2000 hrs,
0-24 mo 100.0% 100.0% 0.0% 0.0% 0.0% 0.0%
This is a 8.0-hour job
PARTS DISPOSITION
Handle the parts in accordance with your Warranty Bulletin on warranty parts handling.
Rework Procedure
Refer to service manual module RENR2424.
1. Remove fuel injection pump. Refer to SMCS 1251-011 (Fuel Injection Pump-Remove).
2. Remove crankshaft pulley. Refer to SMCS 1205-010 (Crankshaft Pulley-Remove and Install).
3. Remove engine front cover. Refer to SMCS 1151-011 (Housing (Front) Remove).
4. Remove fuel injection pump linkage from housing. Refer to SMCS 1151-015 (Housing (Front)-Disassemble).
5. Install new 290-8469 fuel injection pump linkage. Refer to 'Installation of fuel injection pump linkage' within SMCS 1151-016 (Housing (Front)-Assemble).
6. Install engine front cover with new gasket. Refer to SMCS 1151-012 (Housing (Front)-Install).
7. Install crankshaft pulley. Refer to SMCS 1205-010 (Crankshaft Pulley - Remove and Install).
8. Install fuel injection pump. Refer to SMCS 1251-012 (Fuel Injection Pump - Install).
9. Run engine to ensure correct operation. Check for any signs of leaks.
10. Check low and high idle, and reset appropriately.
11. Refit any machine parts that were removed to gain access to engine front cover and fuel pump.

Have questions with 105306-0970?





Group cross 105306-0970 ZEXEL

Mitsubishi 

 
ME717154 
GOVERNOR
F 019 Z1E 362 
NP-RQ200/1150PA2R 
 
GOVERNOR

Nissan-Diesel 

 
1910197173 
GOVERNOR
 
 
GOVERNOR

Nissan-Diesel 

9 420 613 132 
NP-RQ200/1240PA2R 
1910197506 
GOVERNOR
 
1910196601 
GOVERNOR

Mitsubishi 

F 019 Z4E 136 
NP-RQ200/1150PA2R 
ME717223 
GOVERNOR
 
 
GOVERNOR

Nissan-Diesel 

F 019 Z4E 137 
NP-RQ225/1150PA2R 
19101Z0001 
GOVERNOR

Mitsubishi 

105306-0970  

105306-0971 
 
ME723223 
GOVERNOR
 
ME726049 
GOVERNOR
F 019 Z4E 138 
NP-RQ200/1150PA2R 
ME730314 
GOVERNOR
 
ME716960 
GOVERNOR
 
ME726050 
GOVERNOR
F 019 Z4E 139 
NP-RQ200/1150PA2R 
ME730315 
GOVERNOR

Nissan-Diesel 

F 019 Z1E 558 
NP-RQ200/1240PA2R 
1910197508 
GOVERNOR
Back to top