Information gasket
BOSCH
9 411 618 057
9411618057
ZEXEL
141107-0300
1411070300
ISHIKAWAJIMA-H
ISPN86510036
ispn86510036

Rating:
Include in ###:
Cross reference number
Zexel num
Bosch num
Firm num
Name
141107-0300
9 411 618 057
ISPN86510036 ISHIKAWAJIMA-H
GASKET
C 24XX GASKET PF parts PF
C 24XX GASKET PF parts PF
141107-0300
9 411 618 057
315474400 NIIGATA-URAWA
GASKET
C 24XX GASKET PF parts PF
C 24XX GASKET PF parts PF
141107-0300
9 411 618 057
PC2014 NKK
GASKET
C 24XX GASKET PF parts PF
C 24XX GASKET PF parts PF
Information:
1. Remove cylinder head bolts (1) and (2).
When lifting cylinder head, care must be taken to keep cylinder head level to prevent damage to the two cylinder head-to-spacer block dowels.
2. Lift the cylinder head off the spacer block. The approximate weight of the cylinder head is 236 Kg (520 Lbs.). The following steps are for the installation of the cylinder head.3. Thoroughly clean cylinder head and spacer block surfaces.4. Position the head gasket and the cylinder head onto the dowels in the spacer block. Lower the cylinder head onto the spacer block.5. Put engine oil on the threads of bolts (1) and (2), then install bolts. Tighten bolts (1) and (2) as follows:
Cylinder Head Tightening Sequencea. Tighten bolts 1 thru 26 in number sequence shown to a torque of 150 15 N m (110 11 lb.ft.).b. Tighten bolts 1 thru 26 in number sequence shown to a torque of 275 15 N m (200 11 lb.ft.).c. Retorque bolts 1 thru 26 in number sequence shown to 275 15 N m (200 11 lb.ft.).d. Tighten bolts 27 thru 33 in number sequence shown, to a torque of 34 7 N m (25 5 lb.ft.).End By:a. install valve cover baseb. install (ECU) fuel injectorsc. install rocker arm assemblies and push rodsd. adjust all the valve rocker arm clearances.e. install water outlet manifoldf. install exhaust manifold
When lifting cylinder head, care must be taken to keep cylinder head level to prevent damage to the two cylinder head-to-spacer block dowels.
2. Lift the cylinder head off the spacer block. The approximate weight of the cylinder head is 236 Kg (520 Lbs.). The following steps are for the installation of the cylinder head.3. Thoroughly clean cylinder head and spacer block surfaces.4. Position the head gasket and the cylinder head onto the dowels in the spacer block. Lower the cylinder head onto the spacer block.5. Put engine oil on the threads of bolts (1) and (2), then install bolts. Tighten bolts (1) and (2) as follows:
Cylinder Head Tightening Sequencea. Tighten bolts 1 thru 26 in number sequence shown to a torque of 150 15 N m (110 11 lb.ft.).b. Tighten bolts 1 thru 26 in number sequence shown to a torque of 275 15 N m (200 11 lb.ft.).c. Retorque bolts 1 thru 26 in number sequence shown to 275 15 N m (200 11 lb.ft.).d. Tighten bolts 27 thru 33 in number sequence shown, to a torque of 34 7 N m (25 5 lb.ft.).End By:a. install valve cover baseb. install (ECU) fuel injectorsc. install rocker arm assemblies and push rodsd. adjust all the valve rocker arm clearances.e. install water outlet manifoldf. install exhaust manifold
Have questions with 141107-0300?
Group cross 141107-0300 ZEXEL
Ishikawajima-H
141107-0300
9 411 618 057
ISPN86510036
GASKET
Niigata-Urawa
141107-0300
9 411 618 057
315474400
GASKET
Nkk
141107-0300
9 411 618 057
PC2014
GASKET