Information gasket
BOSCH
9 442 610 493
9442610493
ZEXEL
029331-6040
0293316040
ISUZU
1157590490
1157590490

Rating:
Include in #2:
104740-7390
as _
Include in ###:
Cross reference number
Zexel num
Bosch num
Firm num
Name
029331-6040
9 442 610 493
1157590490 ISUZU
GASKET
D 90HY GASKET Standard parts Others
D 90HY GASKET Standard parts Others
029331-6040
9 442 610 493
6053150430 HINO
GASKET
D 90HY GASKET Standard parts Others
D 90HY GASKET Standard parts Others
029331-6040
9 442 610 493
228431400A HINO
GASKET
A D 90HY GASKET Standard parts Others
A D 90HY GASKET Standard parts Others
029331-6040
9 442 610 493
ME705356 MITSUBISHI
GASKET
D 90HY GASKET Standard parts Others
D 90HY GASKET Standard parts Others
Information:
Illustration 1 g00564355
7W-2743 Electronic Speed Switch (ESS)
(1) Push button for Overspeed Verification
(2) Reset button
(3) Overspeed indicator lamp
(4) Seal screw plug for adjusting the engine overspeed
(5) Seal screw plug for adjusting the crank terminate speed
(6) Seal screw plug for adjusting the oil step pressure speed setting The oil step speed calibration increases the oil step speed setting or the oil step speed calibration decreases the oil step speed setting. Refer to the Speed Specification Chart in order to find the oil step speed that is equal to the engine rpm when the engine is running.
Remove the lockwire and the seal from seal screw plug (6). Remove seal screw plug (6) from the access hole for the oil step speed adjusting screw.
Use a small screwdriver to lightly turn the oil step speed adjusting screw in the direction of the "MAX" arrow or the clockwise direction. Turn the screw twenty times. The oil step speed adjusting screw will vary the setting of a potentiometer that is inside of the ESS. The oil step speed adjusting screw will not cause damage to the potentiometer. Also, the screw can not be removed if the screw is turned in the wrong direction.
Connect a voltmeter with the positive lead at terminal (ESS-13) and the negative lead at (ESS-5). Use a 6V-7070 Digital Multimeter or a voltmeter with the same accuracy. Measure the voltage.
For a specific engine rating, find the engine rpm in the column for the oil step speed setting in the Speed Specification Chart. Run the engine at the rpm that is specified in the table.
While the engine is running, look into the hole for the adjustment of the oil step speed. A red indicator lamp should be lighted. A positive voltage should be observed on the multimeter 9 seconds after the indicator lamp is lighted. Turn the oil step speed adjusting screw clockwise until the indicator lamp turns off. The oil step speed setting is above the present rpm of the engine. Slowly turn the oil step speed adjusting screw counterclockwise until the indicator lamp is lighted. After a 9 second delay, a positive voltage should be observed on the multimeter. This position is the correct setting for the oil step speed.
Install seal screw plug (6) in the access hole for the oil step speed adjusting screw. Tighten the screw to a torque of 0.20 0.03 N m (1.8 .3 lb in). Install the lockwire and the seal if the overspeed calibration and the crank terminate speed calibration are also complete.
Have questions with 029331-6040?
Group cross 029331-6040 ZEXEL
Isuzu
Hino
Mitsubishi
Nissan
Nissan-Diesel
Ishikawajima-S
M.Bishi-Hi.-Nag
Isuzu
029331-6040
9 442 610 493
1157590490
GASKET
Hino
029331-6040
9 442 610 493
6053150430
GASKET
029331-6040
9 442 610 493
228431400A
GASKET
Mitsubishi
029331-6040
9 442 610 493
ME705356
GASKET