106065-1030 ZEXEL FUEL-INJECTION PUMP Cross 1060651030 1670196017


 

Information fuel-injection pump

ZEXEL 106065-1030 1060651030
NISSAN-DIESEL 1670196017 1670196017
106065-1030 FUEL-INJECTION PUMP
Rating:
75
Buy FUEL-INJECTION PUMP 106065-1030 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
106065-1030 
106065-1031 
 
1670196017  NISSAN-DIESEL
FUEL-INJECTION PUMP
* Q




Information:


CRANKSHAFT
1. Bolts and washers (ten each). 2. Main bearing caps (five). 3. Crankshaft.2. Remove the main bearing caps (2) and lower halves of crankshaft main bearings.3. Attach a hoist and sling to the crankshaft (3). Remove the crankshaft, the weight is approx. 102 lbs. (46.3 kg).
REMOVING CRANKSHAFT4. Remove the upper halves of crankshaft main bearings.Install Crankshaft
1. Install the upper halves of main bearings. Lubricate the upper halves with clean engine oil (SAE 30).2. Attach a hoist and sling to the crankshaft. Position crankshaft in cylinder block. If camshaft is in the cylinder block, align timing mark on crankshaft gear with timing mark on camshaft gear.3. Lubricate lower halves of main bearings with clean engine oil (SAE 30). Install main bearing caps so number on cap corresponds with number on saddle of cylinder block. Both numbers must be on same side of cylinder block.4. Put engine oil on the threads of the bolts and the face of the washers and install the bolts into the cylinder block.
Do not rotate the crankshaft until all main bearing cap bolts have been tightened.
5. For 1140 (36B1-36B1923), 1145 (97B1-97B6154), 1150 (96B1-96B6580), 1160 (95B1-95B13691) Engines, tighten the bolts for the main bearing caps in the number sequence shown to a first torque of 60 15 lb. ft. (8.3 2.1 mkg). Tighten all bolts in the number sequence shown (hand torque only) to a last torque of 175 10 lb. ft. (24.2 1.4 mkg).6. For 1140 (36B1924-Up), 1145 (97B6155-Up), 1150 (96B6581-Up), 1160 (95B13692-Up) Engines, tighten the bolts for the main bearing caps in the number sequence shown to a first torque of 30 3 lb. ft. (4.1 0.4 mkg). Put a mark on each bolt and cap and tighten, in the number sequence shown, an added 120° 5° from the mark.
BOLT TIGHTENING SEQUENCE7. Check crankshaft end play. End play with new bearings should be .006 .003 in. (0.15 0.08 mm). Maximum allowable end play is .012 in. (0.30 mm).

Have questions with 106065-1030?





Group cross 106065-1030 ZEXEL

Nissan-Diesel 

 
1670196001 

9 410 612 971 
NP-PE6P100/321RS1NP7 
 
FUEL-INJECTION PUMP

Nissan-Diesel 

9 410 610 622 
1670196004 
FUEL-INJECTION PUMP
106065-1030  

106065-1031 
 
1670196017 
FUEL-INJECTION PUMP
 
1670196019 
FUEL-INJECTION PUMP
9 410 611 914 
NP-PE6P100/321RS1NP63 
1670196106 
FUEL-INJECTION PUMP
9 410 612 142 
NP-PE6P100/321RS1NP101 
1670196105 
FUEL-INJECTION PUMP
9 410 612 972 
NP-PE6P100/321RS1NP113 
 
FUEL-INJECTION PUMP

Nissan-Diesel 

9 410 611 614 
NP-PE6P100/321RS1NP113 
1670196514 
FUEL-INJECTION PUMP
9 410 612 143 
NP-PE6P100/321RS1NP120 
1670196516 
FUEL-INJECTION PUMP
Back to top