104661-4092 ZEXEL 9 461 621 820 BOSCH FUEL-INJECTION PUMP 9461621820 1046614092


 

Information fuel-injection pump

BOSCH 9 461 621 820 9461621820
ZEXEL 104661-4092 1046614092
104661-4092 FUEL-INJECTION PUMP
Rating:
12
Buy FUEL-INJECTION PUMP 104661-4092 zexel genuine, new aftermarket engine parts with delivery

Include in #2:

104761-4092 as FUEL INJECTION PUMP

Cross reference number

Zexel num
Bosch num
Firm num
Name
104661-4092 
9 461 621 820 
NP-VE6/11F1125RNP68 
   
FUEL-INJECTION PUMP
Q




Information:

Start By:a. remove all turbochargersb. remove crankshaft rear seal and wear sleeve 1. Disconnect connector (1). 2. Attach Tool (A) and fasten a hoist.3. Remove four bolts (3) and stack (2). The weight of the stack and hardware is 45 kg (100 lb). 4. Remove hose clamp (6).5. Remove five bolts (5) and support (4).6. Repeat Steps 4 and 5 for the other side of the engine. 7. Remove six bolts (7) that connect oil pan (8) to flywheel housing (9). Loosen the rest of the bolts that hold the oil pan in position. 8. Attach Tool (A) to the flywheel housing and a hoist. 9. Lift the end of the engine enough so a 1/2 in. Hardened Washer (10) can be installed on each side of the engine between the oil pan and the cylinder block.10. Install blocks under the oil pan to support the engine when the flywheel housing is removed. Lower the engine onto the blocks. 11. Remove twenty one bolts (11) and flywheel housing (9). The weight of the flywheel housing is 91 kg (200 lb).Install Flywheel Housing
1. Install two 1/2 -13 NC × 4 in. Long Guide Bolts in the cylinder block. Make sure gasket (12) is in position. The cylinder block, both sides of gasket (12) and the surface of the flywheel housing that makes contact with the gasket must not have any oil, fuel, water or gasket adhesive on them when the flywheel housing is installed on the engine.2. Install Tool (A) on the flywheel housing. Install flywheel housing (9) on the engine. The weight of the flywheel housing is approximately 91 kg (200 lb). Leave Tool (A) attached.
Torque Sequence Put 9S-3263 Thread Lock on bolts (17) through (20) before installation.3. Install the bolts that hold the flywheel housing in place.4. Use the following procedure to tighten the bolts: a. Tighten bolts 1 through 8 in number sequence to 136 14 N m (100 10 lb ft).b. Tighten bolts 9 through 20 in number sequence to 55 7 N m (41 5 lb ft).c. Again, tighten bolts 1 through 8 in number sequence to 136 14 N m (100 10 lb ft).d. Again, tighten bolts 9 through 20 in number sequence to 55 7 N m (41 5 lb ft). If a new gasket is installed, cut the ends of the gasket so it is even with the bottom of the cylinder block.5. Use Tool (A) and a hoist to lift the flywheel housing and engine enough so that the washers between the oil pan and the cylinder block can be removed. 6. Tighten the bolts that hold the oil pan to the cylinder block. Install six bolts (7) that hold oil pan (8) to flywheel housing (9). 7. Install support (4) with five bolts (5). Install clamp (6) to a torque of 7.0 1.5 N m (5 1 lb ft).8. Repeat Step (7) for the other side of the engine.

Have questions with 104661-4092?





Group cross 104661-4092 ZEXEL

9 461 625 578 
NP-VE6/11F950RNP38 
 
FUEL-INJECTION PUMP
9 461 614 160 
NP-VE6/11F1075RNP39 
 
FUEL-INJECTION PUMP
9 461 613 402 
NP-VE6/11F1125RNP37 
 
FUEL-INJECTION PUMP
9 461 616 687 
NP-VE6/11F1000RNP41 
 
FUEL-INJECTION PUMP
9 461 621 814 
NP-VE6/11F1075RNP62 
 
FUEL-INJECTION PUMP
9 461 616 114 
 
FUEL-INJECTION PUMP
9 461 615 113 
NP-VE6/11F1075RNP62 
 
FUEL-INJECTION PUMP
9 461 621 815 
 
FUEL-INJECTION PUMP
9 461 621 816 
 
FUEL-INJECTION PUMP
9 461 616 688 
NP-VE6/11F950RNP66 
 
FUEL-INJECTION PUMP
9 461 621 817 
 
FUEL-INJECTION PUMP
9 461 616 115 
 
FUEL-INJECTION PUMP
9 461 621 818 
NP-VE6/11F1075RNP67 
 
FUEL-INJECTION PUMP
9 461 621 819 
 
FUEL-INJECTION PUMP
9 461 625 579 
 
FUEL-INJECTION PUMP
104661-4092  
9 461 621 820 
NP-VE6/11F1125RNP68 
 
FUEL-INJECTION PUMP
Back to top