104661-4082 ZEXEL 9 461 621 818 BOSCH FUEL-INJECTION PUMP 9461621818 1046614082


 

Information fuel-injection pump

BOSCH 9 461 621 818 9461621818
ZEXEL 104661-4082 1046614082
104661-4082 FUEL-INJECTION PUMP
Rating:
9
Buy FUEL-INJECTION PUMP 104661-4082 zexel genuine, new aftermarket engine parts with delivery

Include in #2:

104761-4082 as FUEL INJECTION PUMP

Cross reference number

Zexel num
Bosch num
Firm num
Name
104661-4082 
9 461 621 818 
NP-VE6/11F1075RNP67 
   
FUEL-INJECTION PUMP
Q




Information:

Start By:a. remove oil pump 1. Check each connecting rod cap for its location on the crankshaft. Each cap must have a number (1) which is the same as the number on the connecting rod. Do not mix bearings.2. Turn the crankshaft until two of the pistons are at bottom center.3. Remove connecting rod caps (2). Remove the lower bearing from the connecting rod caps.4. Push the connecting rods away from the crankshaft and remove the upper bearings from the connecting rods.
Be careful not to damage the crankshaft journals. Do not turn the crankshaft while any of the connecting rod caps are removed.
5. Install the upper bearings in connecting rods. put clean engine oil on the bearings and on the crankshaft journals. Slowly pull the connecting rods on the crankshaft.6. Put clean oil on the lower bearings. Install the lower bearings in the connecting rod caps. Be sure tab (3) on the back of the bearings fits in the groove of the caps and connecting rods. 7. Check the bearing clearance with Plastigage (A) as follows:a. Put clean oil on the threads of bolts (4). Install caps (5), Tool (A) and nuts finger tight.b. Tighten each nut (6) to a torque of 80 8 N m (60 6 lb ft).c. Put a mark across the nuts and bolts. Tighten the nuts 120 degrees more. 8. Remove caps (5) and Plastigage (A). Make sure the connecting rod bearing caps are installed with their identification number in arrangement with the connecting rod number.
Do not use an impact wrench to tighten the nuts the additional 120 degrees.
9. Measure the thickness of the Plastigage to find the bearing clearance. the clearance for new bearings must be 0.071 to 0.168 mm (.0028 to .0066 in). The maximum clearance for used bearings is 0.25 mm (0.010 in).10. Install caps (5). Tighten nuts (6) to a torque of 80 8 N m (60 6 lb ft). Tighten the nuts 120 degrees more.11. Do Steps 1 through 10 for the other connecting rod bearings.End By:a. install oil pump

Have questions with 104661-4082?





Group cross 104661-4082 ZEXEL

9 461 625 578 
NP-VE6/11F950RNP38 
 
FUEL-INJECTION PUMP
9 461 614 160 
NP-VE6/11F1075RNP39 
 
FUEL-INJECTION PUMP
9 461 613 402 
NP-VE6/11F1125RNP37 
 
FUEL-INJECTION PUMP
9 461 616 687 
NP-VE6/11F1000RNP41 
 
FUEL-INJECTION PUMP
9 461 621 814 
NP-VE6/11F1075RNP62 
 
FUEL-INJECTION PUMP
9 461 616 114 
 
FUEL-INJECTION PUMP
9 461 615 113 
NP-VE6/11F1075RNP62 
 
FUEL-INJECTION PUMP
9 461 621 815 
 
FUEL-INJECTION PUMP
9 461 621 816 
 
FUEL-INJECTION PUMP
9 461 616 688 
NP-VE6/11F950RNP66 
 
FUEL-INJECTION PUMP
9 461 621 817 
 
FUEL-INJECTION PUMP
9 461 616 115 
 
FUEL-INJECTION PUMP
104661-4082  
9 461 621 818 
NP-VE6/11F1075RNP67 
 
FUEL-INJECTION PUMP
9 461 621 819 
 
FUEL-INJECTION PUMP
9 461 625 579 
 
FUEL-INJECTION PUMP
9 461 621 820 
NP-VE6/11F1125RNP68 
 
FUEL-INJECTION PUMP
Back to top