104660-4810 ZEXEL 9 461 623 892 BOSCH FUEL-INJECTION PUMP 9461623892 1046604810


 

Information fuel-injection pump

BOSCH 9 461 623 892 9461623892
ZEXEL 104660-4810 1046604810
104660-4810 FUEL-INJECTION PUMP
Rating:
39
Buy FUEL-INJECTION PUMP 104660-4810 zexel genuine, new aftermarket engine parts with delivery

Include in #2:

104760-4810 as FUEL INJECTION PUMP

Cross reference number

Zexel num
Bosch num
Firm num
Name
104660-4810 
9 461 623 892 
NP-VE6/10F2000RNP184 
   
FUEL-INJECTION PUMP
Q




Information:

Start By:a. remove oil pumpb. remove oil pan plate 1. Turn the crankshaft until two pistons are at the bottom center. Remove connecting rod caps (1) from the two connecting rods. Remove the lower half of the rod bearing from the rod bearing cap.2. Push the connecting rods away from the crankshaft. Remove the upper half of the rod bearing from the connecting rod. Install the connecting rod bearings dry when the clearance checks are made. Put clean engine oil on the connecting rod bearings for final assembly.3. Install the upper half of the rod bearing in the connecting rod.4. Install the lower half of the rod bearing in the connecting rod cap. Be sure the tabs in the back of the connecting rod bearings are in the tab grooves of the connecting rod and cap. 5. Use Plastigage (A) to check the connecting rod bearing clearance.6. Put Plastigage (A) on the connecting rod bearing.7. Put 2P2506 Thread Lubricant on the threads of the rod bolts and seat surfaces of the nuts.
When connecting rod caps are installed, make sure the number on the side of the cap is next to and respective with the number on the side of the connecting rod.
Do not turn the crankshaft when Plastigage (A) is in position.
Do not use an impact wrench to tighten the nuts the additional 90°.
8. Install connecting rod cap (1). Install the nuts. Tighten the nuts to a torque of 40 4 N m (30 3 lb ft). Put a mark on each nut and the end of each bolt. Tighten the nuts 90° more. Remove the connecting rod caps. Remove Plastigage (A) and measure the width of the Plastigage. The connecting rod clearance must be 0.076 to 0.168 mm (.0030 to .0066 in) for new bearings. The maximum clearance with used bearings is 0.25 mm (.010 in).9. Install the connecting rod caps and tighten the nuts as in Step 8.10. Do Steps 1 through 9 for the remainder of the connecting rod bearings.End By:a. install oil pan plateb. install oil pump

Have questions with 104660-4810?





Group cross 104660-4810 ZEXEL

9 461 623 891 
 
FUEL-INJECTION PUMP
9 461 624 688 
NP-VE6/10F2000RNP183 
 
FUEL-INJECTION PUMP
104660-4810  
9 461 623 892 
NP-VE6/10F2000RNP184 
 
FUEL-INJECTION PUMP
9 461 623 893 
NP-VE6/10F2000RNP185 
 
FUEL-INJECTION PUMP
9 461 623 894 
NP-VE6/10F2000RNP186 
 
FUEL-INJECTION PUMP
9 461 623 895 
NP-VE6/10F2000RNP190 
 
FUEL-INJECTION PUMP
9 461 624 239 
NP-VE6/10F2000RNP193 
 
FUEL-INJECTION PUMP
9 461 628 117 
 
FUEL-INJECTION PUMP
9 461 624 240 
NP-VE6/10F2000RNP194 
 
FUEL-INJECTION PUMP
Back to top