104649-2212 ZEXEL 9 461 628 104 BOSCH FUEL-INJECTION PUMP 9461628104 1046492212


 

Information fuel-injection pump

BOSCH 9 461 628 104 9461628104
ZEXEL 104649-2212 1046492212
104649-2212 FUEL-INJECTION PUMP
Rating:
11
Buy FUEL-INJECTION PUMP 104649-2212 zexel genuine, new aftermarket engine parts with delivery

Include in #2:

104749-2212 as FUEL INJECTION PUMP

Cross reference number

Zexel num
Bosch num
Firm num
Name
104649-2212 
104649-2214 
9 461 628 104 
   
FUEL-INJECTION PUMP
* Q




Information:

1. Drain the cooling system.2. Remove bolt (2) and spacer (1). 3. Remove clip (3) that holds line (4) to the cylinder head. 4. Remove bolts (5) that hold fuel filter base and filter (6) to the cylinder head. 5. Fasten a chain and hoist to the cylinder head lifting brackets. Remove the bolts and nuts that hold the cylinder head. Remove the cylinder head. Weight of the cylinder head is 41 kg (90 lb.). 6. Remove cylinder head gasket (7).7. Check the condition of the cylinder head assembly before installation.Install Cylinder Head Assembly
1. Use a tap of the correct size to clean each threaded hole in the cylinder block for the cylinder head mounting bolts.2. Thoroughly clean the surface for the cylinder head gasket on the cylinder head assembly and cylinder block.
Be sure the gasket is positioned so that all coolant passages in the cylinder block can be seen through the gasket.
3. Put cylinder head gasket (1) in place on the studs in the cylinder block. 4. Put the cylinder head in position on the studs.5. Put clean engine oil on the bolt threads, and install the bolts that hold the cylinder head. 6. Tighten the bolts and nuts in the number sequence shown as follows:a. Tighten all bolts and nuts in number sequence to a torque of 45 N m (35 lb.ft.).b. Tighten all bolts and nuts in number sequence to a torque of 95 N m (70 lb.ft.).c. Again, tighten all bolts and nuts in number sequence to a final torque of 135 N m (100 lb.ft.). Retighten the cylinder head bolts and nuts after the engine has run under part load for approximately thirty minutes.a. If the bolts and nuts move before the correct final torque is reached, retighten every thing in the sequence again to the final torque of 135 N m (100 lb.ft.).b. If the bolts and nuts do not move before the correct final torque is reached, back each one off 30 to 60°, and retighten again, in the sequence shown, to the final torque. After all the bolts and nuts are retightened, check the first 10 positions to make sure they are tightened to the correct torque. 7. Install fuel filter base and filter (2) on the cylinder head with bolts (3).8. Install clip (4) that holds fuel line (5) to the cylinder head.9. Install the alternator bracket bolt and spacer in the cylinder head.End By:a. install fuel injection nozzle assembliesb. install fuel injection linesc. install inlet and exhaust manifoldd. install rocker shaft and push rods

Have questions with 104649-2212?





Group cross 104649-2212 ZEXEL

9 461 614 761 
 
FUEL-INJECTION PUMP
9 461 622 753 
 
FUEL-INJECTION PUMP
9 461 611 357 
 
FUEL-INJECTION PUMP
104649-2212  

104649-2214 
9 461 628 104 
 
FUEL-INJECTION PUMP
9 461 611 358 
 
FUEL-INJECTION PUMP
9 461 622 754 
 
FUEL-INJECTION PUMP
9 461 620 028 
NP-VE4/9F2500RNP361 
 
FUEL-INJECTION PUMP
9 461 611 722 
 
FUEL-INJECTION PUMP
9 461 612 206 
 
FUEL-INJECTION PUMP
9 461 614 717 
NP-VE4/9F2200RNP465 
 
FUEL-INJECTION PUMP
9 461 611 723 
 
FUEL-INJECTION PUMP
9 461 613 973 
 
FUEL-INJECTION PUMP
9 461 629 176 
 
FUEL-INJECTION PUMP
9 461 628 694 
 
FUEL-INJECTION PUMP
Back to top