104640-8990 ZEXEL 9 461 622 257 BOSCH FUEL-INJECTION PUMP 9461622257 1046408990


 

Information fuel-injection pump

BOSCH 9 461 622 257 9461622257
ZEXEL 104640-8990 1046408990
104640-8990 FUEL-INJECTION PUMP
Rating:
47
Buy FUEL-INJECTION PUMP 104640-8990 zexel genuine, new aftermarket engine parts with delivery

Include in #2:

104740-8990 as FUEL INJECTION PUMP

Cross reference number

Zexel num
Bosch num
Firm num
Name
104640-8990 
104640-8991 
9 461 622 257 
   
FUEL-INJECTION PUMP
* Q




Information:

Start By:a. remove valve covers 1. Loosen the fuel injection line nut at the nozzle end with tool (A).2. Loosen the fuel line nut at the fuel injection line adapter with tool (B). Remove inner fuel injection lines (1). Install caps and plugs on all fuel line openings to keep dirt out of the fuel system. If necessary, use tooling (D) to turn the engine so the valves do not make contact with the pistons when the valves are opened with tool (C) to remove the push rods.3. Put compression on the valve springs with tool (C), and remove push rods (2). Put identification marks on the push rods as to their location in the engine.4. Push the push rod end of the rocker arms down. 5. Remove the intake valve lifter with tooling (E) as follows:a. Install 5P2685 Nut (3) and 5P6601 Collet (4) on 5P2408 Outer Handle Assembly (5).b. Install 5P6599 Inner Handle Assembly (6) in 5P2408 Outer Handle Assembly (5). c. Install tooling (E) in the intake valve lifter. Hold the 5P2408 Outer Handle Assembly, and tighten the 5P6599 Inner Handle Assembly until the 5P6601 Collet is tight against the inside of the intake valve lifter. d. Remove intake valve lifters (7) from the cylinder block with tooling (E). Put identification marks on the lifters as to their location in the engine. 6. Remove the exhaust valve lifters with tooling (E) as follows:a. Install 5P2685 Nut (3) and 5P6601 Collet (4) on 5P2408 Outer Handle Assembly (5). The opening in the cylinder head assembly for the intake valve lifter is larger than the opening in the exhaust valve lifter side. The tooling and each valve lifter must be installed and removed from the intake valve lifter side.b. Install the outer handle assembly in the intake valve lifter side of the cylinder head assembly. Slide the flat area of 5P2408 Outer Handle Assembly (5) through the head casting, and install the 5P6601 Collet in the exhaust valve lifters. c. Install 5P6599 Inner Handle Assembly (6) in 5P2408 Outer Handle Assembly (5). Hold the 5P2408 Handle Assembly, and tighten the 5P6599 Handle Assembly until the 5P6601 Collet is tight against the inside of the exhaust valve lifter.d. Pull the exhaust valve lifter up until the spring on the exhaust valve lifter is free from the cylinder block.e. Remove the 5P6599 Inner Handle Assembly. Slide the 5P2408 Outer Handle Assembly through the head casting, and remove it from the intake valve lifter side of the cylinder head. f. Use a magnet, and remove exhaust valve lifters (8) from the intake valve lifter side of the cylinder head assembly. Put identification marks on the lifters as to their location in the engine.7. Remove the guide springs from the lifters.Install Valve Lifters
Steps 1 and 2 must be done to install intake or exhaust valve lifters.
Make sure guide spring (9) is not damaged or worn. If the guide spring is damaged or worn, replace the guide spring. See Guideline For Reusable

Have questions with 104640-8990?





Group cross 104640-8990 ZEXEL

9 461 616 406 
NP-VE4/10F2100RNP1196 
 
FUEL-INJECTION PUMP
9 461 615 711 
NP-VE4/10F2100RNP1194 
 
FUEL-INJECTION PUMP
9 461 622 256 
NP-VE4/10F2100RNP1128 
 
FUEL-INJECTION PUMP
9 461 616 970 
NP-VE4/10F2100RNP1239 
 
FUEL-INJECTION PUMP
9 461 625 040 
 
FUEL-INJECTION PUMP
9 461 616 407 
NP-VE4/10F2100RNP1216 
 
FUEL-INJECTION PUMP
9 461 616 408 
NP-VE4/10F2100RNP1217 
 
FUEL-INJECTION PUMP
9 461 615 539 
NP-VE4/10F2100RNP1218 
 
FUEL-INJECTION PUMP
9 461 616 409 
NP-VE4/10F2100RNP1127 
 
FUEL-INJECTION PUMP
104640-8990  

104640-8991 
9 461 622 257 
 
FUEL-INJECTION PUMP
Back to top