104640-8260 ZEXEL 9 461 622 234 BOSCH FUEL-INJECTION PUMP 9461622234 1046408260


 

Information fuel-injection pump

BOSCH 9 461 622 234 9461622234
ZEXEL 104640-8260 1046408260
104640-8260 FUEL-INJECTION PUMP
Rating:
53
Buy FUEL-INJECTION PUMP 104640-8260 zexel genuine, new aftermarket engine parts with delivery

Include in #2:

104740-8260 as FUEL INJECTION PUMP

Cross reference number

Zexel num
Bosch num
Firm num
Name
104640-8260 
104640-8261 
9 461 622 234 
   
FUEL-INJECTION PUMP
* Q




Information:

Start By:a. remove oil panb. remove oil pump 1. Remove bolts (1) and bearing cap (2). Remove the bearing half from the cap.
If the crankshaft is turned in the wrong direction, the tab of the bearing will be pushed between the crankshaft and cylinder block. This can cause damage to either or both the crankshaft and the block.
2. Remove the upper half of the main bearings as follows:a. Turn the crankshaft until tool (A) can be installed in the crankshaft journal oil passage. Install tool (A).b. Turn the crankshaft in the direction which will push the upper main bearing out, tab end first.c. Check the condition of the bearings. (See Guideline For Reusable Parts, Main And Connecting Rod Bearings, FORM No. SEBF8009 and SEBD0531). Both the center and two end main journals have no oil hole. To remove these bearings, put a thin piece of soft material, (that will not damage the crankshaft journal), against the end of the bearing opposite the tab. Hit the bearing with the soft material until the tab of the bearing is free from the groove in the block. The following steps are for the installation of the crankshaft main bearings. Put clean engine oil on the main bearings for the assembly. Also, be sure the tabs on the back side of the main bearings fit in the grooves of the main bearing caps and cylinder block.3. Clean the surfaces in the cylinder block for the main bearings. Use tool (A), and install new upper halves of main bearing (bearings with the oil hole) in the cylinder block. Do not put oil on the back of the bearing.4. Clean the surface of the main bearing caps for the main bearings. Install the new lower halves of the main bearings in the main caps. Do not put oil on the back of the bearing.
Install the main bearing caps with the sequence number to the right, 1 through 7, front to rear.
5. Put main bearing caps (2) in position on the cylinder block. Put engine oil on the bolt threads and the contact surfaces of the bolt heads, and install the bolts. Tighten the bolts on the side where the main bearing tabs are located to a torque of 54 7 N m (40 5 lb.ft.). Tighten the bolts on the opposite side to a torque of 54 7 N m (40 5 lb.ft.).6. Put a mark on each bolt head and the bearing caps. Turn the bolts that are opposite the main bearing tabs an additional 90° 5° turn. Then turn the bolts on the side where the main bearing tabs are located an additional 90° 5° turn. 8. Check the end play of the crankshaft with a dial indicator and magnetic base. The end play must be 0.07 to 0.24 mm (.003 to .009 in.). The end play is controlled by the thrust bearings, which are part of main bearing No. six.End By:a. install oil pumpb. install oil pan

Have questions with 104640-8260?





Group cross 104640-8260 ZEXEL

9 461 622 228 
NP-VE4/10F2100RNP964 
 
FUEL-INJECTION PUMP
9 461 622 229 
NP-VE4/10F2100RNP965 
 
FUEL-INJECTION PUMP
9 461 622 230 
 
FUEL-INJECTION PUMP
9 461 622 231 
NP-VE4/10F2100RNP966 
 
FUEL-INJECTION PUMP
9 461 622 232 
 
FUEL-INJECTION PUMP
9 461 622 233 
NP-VE4/10F2100RNP967 
 
FUEL-INJECTION PUMP
9 461 614 648 
NP-VE4/10F2100RNP968 
 
FUEL-INJECTION PUMP
9 461 614 756 
NP-VE4/10F2100RNP969 
 
FUEL-INJECTION PUMP
104640-8260  

104640-8261 
9 461 622 234 
 
FUEL-INJECTION PUMP
9 461 615 086 
NP-VE4/10F2100RNP970 
 
FUEL-INJECTION PUMP
9 461 622 235 
 
FUEL-INJECTION PUMP
9 461 622 236 
 
FUEL-INJECTION PUMP
9 461 616 746 
NP-VE4/10F2100RNP977 
 
FUEL-INJECTION PUMP
9 461 622 237 
 
FUEL-INJECTION PUMP
9 461 616 803 
NP-VE4/10F2100RNP961 
 
FUEL-INJECTION PUMP
Back to top