104640-8120 ZEXEL 9 461 622 218 BOSCH FUEL-INJECTION PUMP 9461622218 1046408120


 

Information fuel-injection pump

BOSCH 9 461 622 218 9461622218
ZEXEL 104640-8120 1046408120
104640-8120 FUEL-INJECTION PUMP
Rating:
21
Buy FUEL-INJECTION PUMP 104640-8120 zexel genuine, new aftermarket engine parts with delivery

Include in #2:

104740-8120 as FUEL INJECTION PUMP

Cross reference number

Zexel num
Bosch num
Firm num
Name
104640-8120 
104640-8121 
9 461 622 218 
   
FUEL-INJECTION PUMP
* Q




Information:

Start By:a. remove radiator
Keep all parts clean from contaminants. Contaminants put into the system may cause rapid wear and shortened component life.
1. Loosen bolt (4), bolt (5), and bolt (6). Remove belts (3).2. Remove bolts (2) and fan (1). 3. Remove bolt (7) and washer (8). Put enough spacers (10) on bolt (7) to get approximately 3.18 mm (.125 in) of clearance between washer (8) and vibration damper and pulley assembly (9). Install bolt (7), washer (8), and spacers (10).
If spacers (10) are not used, damage to the bolt and/or crankshaft can result when the vibration damper and pulley are removed from the crankshaft.
4. Install tool (A) as shown, and loosen vibration damper and pulley assembly (9).5. Remove tool (A), bolt (7), washer (8), spacers (10), and vibration damper and pulley assembly (9). 6. If necessary, remove bolts (11) and vibration damper (12). The following steps are to install the crankshaft vibration damper and pulley. Inspect the vibration damper housing for leakage or dents (damage housing). If either condition exists, a replacement of the vibration damper must be made.7. Install vibration damper (12) on pulley (13). Install bolts (11).8. Install vibration damper and pulley assembly (9) and install bolt (7), spacers (10) and washer (8).
The flat side of washer (8) must be installed toward vibration damper and pulley assembly (9).
9. Tighten bolt (7) to a torque of 284 to 340 N m (210 to 250 lb ft). Hit bolt (7) with a hammer and retighten to a torque of 284 to 340 N m (210 to 250 lb ft).10. Position belts (3). Tighten bolts (4), (5), and (6). Use a belt tension gauge and make an adjustment of the belts. Measure the belt farthest from the engine. Tighten new belts until the gauge indication is 534 22 N (120 5 lb ft). Operate the engine at high idle for a minimum of 30 minutes after installing radiator and guards. Make another adjustment of the belt tension. The correct gauge indication for a used belt is 400 44 N (90 10 lb.). Tighten bolt (4), bolt (5), and bolt (6).11. Install fan (1) and bolt (2).End By:a. install radiator
Perform Scheduled Oil Sampling on oil wetted compartments after performing service work to check for contaminants left in the system following repair. Contaminants put into the system may cause rapid wear and shortened component life.

Have questions with 104640-8120?





Group cross 104640-8120 ZEXEL

104640-8120  

104640-8121 
9 461 622 218 
 
FUEL-INJECTION PUMP
9 461 616 067 
 
FUEL-INJECTION PUMP
9 461 622 219 
 
FUEL-INJECTION PUMP
9 461 614 882 
 
FUEL-INJECTION PUMP
9 461 622 220 
NP-VE4/10F2100RNP946 
 
FUEL-INJECTION PUMP
Back to top