104640-7281 ZEXEL 9 461 622 619 BOSCH FUEL-INJECTION PUMP 9461622619 1046407281


 

Information fuel-injection pump

BOSCH 9 461 622 619 9461622619
ZEXEL 104640-7281 1046407281
104640-7281 FUEL-INJECTION PUMP
Rating:
57
Buy FUEL-INJECTION PUMP 104640-7281 zexel genuine, new aftermarket engine parts with delivery

Include in #2:

104740-7281 as FUEL INJECTION PUMP

Cross reference number

Zexel num
Bosch num
Firm num
Name
104640-7281 
9 461 622 619 
NP-VE4/10F1300RNP826 
   
FUEL-INJECTION PUMP
Q




Information:

START BY:a. remove valve coversb. remove rocker shaft assemblies and pushrodsc. remove fuel injection nozzles (earlier)
Be sure that the piston is at Top Center so that the valves will be held in position when the springs are removed.
1. Remove the valve cover bases.2. Remove the valve stem locks with tooling (A) using the following procedure: a. Install adapter plate (1) with two OS1618 (5/16-18 x 1 in.) bolts.b. Install stud (2) and nut (3). Tighten the nut. c. Install plate (4), washer (5) and nut (6). Tighten the nut until the locks are free.d. Remove locks (7), and remove the nut, washer and plate from the stud. Remove the stud and adapter plate from the fuel injection nozzle adapter. 3. Remove rotocoil (8), spring (9) and washer (10). 4. Use tool (B) to remove fuel injection nozzle adapter (11) from the cylinder head assembly. 5. Remove washers (12) and seals (13) from adapters (11).Install Fuel Injection Nozzle Adapters (Earlier)
1. Inspect seals (3) for damage or wear, and make a replacement if necessary.2. Install washers (1) and seals (3) on adapters (2).3. Put liquid soap in the bores of the cylinder head and on the seals of the fuel injection nozzle adapters.4. Put 5P3931 Anti-Seize Compound on the threads of adapter (2), and install the adapters in the cylinder head assembly. 5. Use tool (A), and tighten the adapters to a torque of 205 14 N m (150 10 lb.ft.). 6. Install washers (6), springs (5) and rotocoils (4). 7. Use tool (B), and compress the springs until locks (7) can be installed. Install locks (7) on the valve stems, and remove tool (B).8. Install the valve cover base. Tighten the valve cover base mounting bolts to a torque of 14 3 N m (10 2 lb.ft.).END BY:a. install fuel injection nozzles (earlier)b. install rocker shaft assemblies and push rodsc. install valve covers

Have questions with 104640-7281?





Group cross 104640-7281 ZEXEL

9 461 614 961 
NP-VE4/10F2150RNP796 
 
FUEL-INJECTION PUMP
9 461 614 054 
NP-VE4/10F2150RNP797 
 
FUEL-INJECTION PUMP
9 461 614 962 
NP-VE4/10F2150RNP798 
 
FUEL-INJECTION PUMP
9 461 613 662 
 
FUEL-INJECTION PUMP
9 461 613 663 
 
FUEL-INJECTION PUMP
9 461 622 618 
NP-VE4/10F2150RNP805 
 
FUEL-INJECTION PUMP
9 461 614 134 
 
FUEL-INJECTION PUMP
9 461 618 309 
 
FUEL-INJECTION PUMP
104640-7281  
9 461 622 619 
NP-VE4/10F1300RNP826 
 
FUEL-INJECTION PUMP
9 461 622 620 
 
FUEL-INJECTION PUMP
Back to top